TxDOT contract A00221404 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Tyler District). Let by Texas DOT on August 11, 2026, Gregg, Tyler District. 13 bids received; low bid $133,105 by 12Twelve Road and Bridge LLC, -48% against the engineer's estimate of $257,618.
- Owner
- Texas DOT
- Letting
- 11 AUG 2026
- Pay items
- 9
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | 12Twelve Road and Bridge LLC | $133,105 | Low | -48% |
| 2 | Scout 5 Construction LLC | $207,131 | +56% | -20% |
| 3 | Structural Integrity Group LLC | $209,014 | +57% | -19% |
| 4 | Jackson Excavation, LLC | $211,345 | +59% | -18% |
| 5 | Macias Specialty Contracting LLC | $213,032 | +60% | -17% |
| 6 | Road Doctors LLC | $219,472 | +65% | -15% |
| 7 | Rear Contractors LLC | $235,172 | +77% | -9.0% |
| 8 | GHB Equipment Company, L.L.C. | $246,334 | +85% | -4.0% |
| 9 | Red Baron Building Company Municipal Projects Division LLC | $253,367 | +90% | -2.0% |
| 10 | SCR Civil Construction, LLC | $254,644 | +91% | -1.0% |
| 11 | O. Trevino Construction, LLC | $274,382 | +106% | +7.0% |
| 12 | Garret Shields Infrastructure | $274,480 | +106% | +7.0% |
| 13 | Cross Plus Construction, LLC | $958,469 | +620% | +272% |
Engineer's estimate: $257,618.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. 12Twelve Road and Bridge LLC | 2. Scout 5 Construction LLC | 3. Structural Integrity Group LLC | 4. Jackson Excavation, LLC | 5. Macias Specialty Contracting LLC | 6. Road Doctors LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Concrete structure repair (epoxy mortar) (429-7002) | SF | 55 | $200.00 | $50.00 | $200.00 | $250.00 | $99.00 | $150.00 | $250.00 |
| 2 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 856 | $46.00 | $30.00 | $30.00 | $1.00 | $25.00 | $29.00 | $40.00 |
| 3 | Cleaning existing joints (438-7008) | LF | 6,184 | $13.00 | $9.00 | $22.00 | $12.00 | $25.00 | $12.00 | $13.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $22,600 | $1,000.00 | $12,000 | $19,500 | $1,000.00 | $20,000 | $20,000 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $10,000 | $0.01 | $0.01 | $15,000 | $2,000.00 | $3,000.00 | $2,500.00 |
| 6 | Portable changeable message sign (503-7001) | DAY | 180 | $150.00 | $0.10 | $0.01 | $1.00 | $10.00 | $125.00 | $75.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 90 | $300.00 | $0.01 | $0.01 | $1.00 | $10.00 | $300.00 | $1.00 |
| 8 | Bridge joint repair (header) (785-7002) | LF | 160 | $145.00 | $300.00 | $140.00 | $440.00 | $120.00 | $175.00 | $300.00 |
| 9 | Maintenance speed limit signing (7010-7002) | DAY | 30 | $235.00 | $0.00 | $0.01 | $1.00 | $100.00 | $75.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.