TxDOT contract A00096030 bid tabulation

Widen Road - Add Lanes, FM 494 (FM 676 (MILE 5) to FM 1924 (MILE 3)). Let by Texas DOT on April 3, 2025, Hidalgo, Pharr District. 3 bids received; low bid $15,739,166 by Reim Construction, Inc., -6.4% against the engineer's estimate of $16,823,453.

Owner
Texas DOT
Letting
03 APR 2025
Pay items
173
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Reim Construction, Inc.$15,739,166Low-6.0%
2Texas Cordia Construction, LLC$16,138,156+3.0%-4.0%
3Foremost Paving, Inc.$19,596,885+25%+16%
TxDOT contract A00096030: bids by rank

Engineer's estimate: $16,823,453.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Reim Construction, Inc.2. Texas Cordia Construction, LLC3. Foremost Paving, Inc.
1Preparing row (100-7002)STA111$3,000.00$2,700.00$2,500.00$5,000.00
2Removing concrete (pavement) (104-7001)SY113$7.70$6.35$20.00$25.00
3Removing concrete (riprap) (104-7006)SY469$17.73$7.85$5.00$10.00
4Removing concrete (driveways) (104-7011)SY1,992$17.25$9.75$5.00$20.50
5Removing concrete (curb & gutter) (104-7017)LF520$7.50$3.30$3.00$8.50
6Remove (10") TRT/untrt base & asphalt pavement (105-7089)CY1,000$15.36$11.90$20.00$8.00
7Excavation (roadway) (110-7001)CY44,651$7.50$5.30$7.00$7.50
8Embankment (final)(DC)(type C) (132-7006)CY6,878$20.00$5.40$3.00$10.00
9Backfill (type A) (134-7001)STA20$122.37$232.00$200.00$455.00
10Furn & place topsoil (vehicle) (160-7007)CY100$40.50$38.25$40.00$16.00
11Hydro mulch seed (permanent_urban_sandy) (164-7019)SY23,259$0.65$0.69$0.50$0.70
12Hydro mulch seed (temporary_warm) (164-7021)SY23,259$0.45$0.35$0.50$0.33
13Vegetative watering (168-7001)TGL395$21.50$29.25$30.00$65.00
14Sprinkling (dust control) (204-7001)TGL444$13.29$29.25$20.00$1.00
15Proof rolling (216-7001)HR200$117.74$40.25$60.00$80.00
16FL BS (roadway del)(type E GR 4)(final pos) (247-7277)CY14,422$35.98$34.50$38.00$32.00
17Geogrid base reinforcement (type 2) (250-7002)SY106,046$1.35$1.10$2.00$1.40
18Rework BS metal (type B)(5")(DC)(org pos) (251-7090)CY14,422$22.00$4.10$4.00$8.50
19Cement (275-7001)TON2,548$226.45$216.00$210.00$190.00
20Cement TRT (existing material & new base)(10") (275-7008)SY103,824$3.00$1.75$2.00$2.20
21Cement TRT (subgrade)(12") (275-7015)SY106,046$2.00$1.90$2.00$2.60
22Salvage,haul & stockpile reclaimed asphalt PV(3"to 6") (305-7050)SY46,835$2.50$3.25$3.00$3.65
23Prime coat (MC-30) (310-7004)GAL21,209$5.92$4.40$5.00$4.50
24SP mixes SP-B sac-B PG76-22 (344-7008)TON19,263$130.00$112.00$120.00$108.00
25SP mixes SP-C sac-A PG76-22 (344-7030)TON11,007$107.98$115.00$120.00$110.00
26Struct excavation (special) (400-7005)CY2,983$77.96$73.50$100.00$75.00
27Cut & restoring pavement (400-7006)SY608$90.00$61.50$85.00$100.00
28Cem stabil BKFL (400-7010)CY7,186$78.64$97.50$60.00$120.00
29Trench excavation protection (402-7001)LF11,753$2.91$1.80$3.00$1.00
30Temporary special shoring (403-7001)SF3,906$28.00$20.75$30.00$28.00
31Drilled shaft (traffic signal pole) (24 in) (416-7042)LF36$203.04$155.00$150.00$140.00
32Drilled shaft (traffic signal pole) (36 in) (416-7044)LF84$311.74$426.00$420.00$385.00
33Class C concrete (collar) (420-7061)EACH14$1,600.00$898.00$5,340.00$6,000.00
34Retaining wall (MSE) (423-7001)SF17,033$44.00$72.50$100.00$105.00
35Riprap (concrete)(4 in) (432-7001)CY53$651.44$437.00$630.00$450.00
36Rail (type T551) (450-7016)LF2,047$131.41$211.00$50.00$95.00
37Rail (type PR11) (450-7044)LF865$232.40$122.00$120.00$100.00
38RC pipe (CL III)(18 in) (464-7003)LF2,223$70.12$77.00$80.00$150.00
39RC pipe (CL III)(24 in) (464-7005)LF1,351$94.19$89.00$90.00$152.00
40RC pipe (CL III)(30 in) (464-7007)LF1,441$120.00$119.00$118.00$158.00
41RC pipe (CL III)(36 in) (464-7009)LF371$156.00$175.00$175.00$175.00
42RC pipe (CL III)(42 in) (464-7010)LF1,855$180.00$232.00$230.00$210.00
43RC pipe (CL III)(48 in) (464-7011)LF2,524$200.00$273.00$270.00$260.00
44RC pipe (CL III)(54 in) (464-7012)LF1,991$215.00$308.00$310.00$337.00
45Inlet (complete)(pco)(3FT)(left) (465-7014)EACH5$5,500.00$4,700.00$5,000.00$6,600.00
46Inlet (complete)(pco)(3FT)(right) (465-7015)EACH18$5,200.00$4,930.00$5,270.00$6,600.00
47Inlet (complete)(pco)(3FT)(both) (465-7016)EACH4$6,000.00$5,640.00$5,970.00$7,300.00
48Inlet (complete)(pco)(4FT)(left) (465-7018)EACH2$5,800.00$6,040.00$6,600.00$8,400.00
49Inlet (complete)(pco)(4FT)(right) (465-7019)EACH4$10,604$5,720.00$6,200.00$8,600.00
50Inlet (complete)(pco)(4FT)(both) (465-7020)EACH1$8,863.42$6,060.00$6,400.00$7,600.00
51Inlet (complete)(pco)(5FT)(none) (465-7021)EACH1$5,548.00$6,080.00$6,800.00$10,500
52Inlet (complete)(pco)(5FT)(left) (465-7022)EACH5$12,838$6,110.00$6,400.00$9,000.00
53Inlet (complete)(pco)(5FT)(both) (465-7024)EACH1$12,269$6,970.00$7,000.00$9,400.00
54Inlet (complete)(pco)(6FT)(left) (465-7026)EACH8$12,542$7,330.00$8,900.00$12,200
55Inlet (complete)(pco)(6FT)(both) (465-7028)EACH5$8,223.89$7,850.00$9,500.00$11,300
56Inlet (complete)(pcu)(3FT)(none) (465-7029)EACH4$5,328.00$3,750.00$4,300.00$5,900.00
57Inlet (complete)(PSL)(RC)(6FTX6FT) (465-7076)EACH5$8,731.00$7,380.00$11,600$10,000
58Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH5$4,600.00$3,620.00$4,780.00$8,300.00
59Removing structure (inlet) (496-7002)EACH2$1,506.67$652.00$700.00$600.00
60Removing structure (set) (496-7004)EACH16$620.92$294.00$300.00$600.00
61Removing structure (pipe) (496-7007)LF302$12.91$11.00$10.00$50.00
62Mobilization (500-7001)LS1$1,530,768$1,300,000$834,900$1,750,000
63Barricades, signs and traffic handling (502-7001)MO20$7,580.33$2,380.00$500.00$8,500.00
64Portable changeable message sign (503-7001)DAY100$106.68$56.00$30.00$65.00
65Portable changeable message sign (503-7002)EACH2$3,277.76$2,810.00$300.00$13,000
66TMA (stationary) (505-7001)DAY720$72.62$28.00$15.00$40.00
67TMA (mobile operation) (505-7003)DAY480$115.18$56.00$25.00$0.01
68Construction exits (install) (type 2) (506-7021)SY480$25.61$9.85$10.00$30.00
69Construction exits (remove) (506-7024)SY480$7.73$8.25$8.00$15.00
70Temporary sediment control fence (install) (506-7039)LF100$3.77$4.50$6.00$9.00
71Temporary sediment control fence (remove) (506-7041)LF100$1.15$1.95$3.00$3.00
72Biodegradable erosion control logs (install) (12") (506-7044)LF930$3.81$2.45$5.00$6.00
73Biodegradable erosion control logs (remove) (506-7046)LF930$1.10$1.00$1.00$2.00
74Constructing detours (508-7001)SY6,943$42.04$41.50$38.00$50.00
75PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089)LF3,720$51.94$8.65$30.00$30.00
76PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090)LF3,720$6.46$6.75$6.00$11.00
77PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092)LF3,720$10.50$4.25$10.00$9.00
78Concrete C&G (valley gutter) (529-7019)LF456$58.95$41.50$78.00$52.00
79Concrete curb (type F3) (529-7022)LF865$221.89$163.00$210.00$420.00
80Concrete curb & gutter (type B) (mountable) (529-7024)LF16,907$15.63$15.00$19.00$15.00
81Driveways (concrete) (530-7006)SY1,166$78.97$61.00$90.00$64.20
82Driveways (ACP) (530-7010)SY2,466$39.44$36.25$30.00$48.00
83Concrete sidewalks (4") (531-7001)SY12,433$47.25$41.00$50.00$57.00
84Curb ramps (type 1) (531-7005)EACH12$1,800.00$1,570.00$1,760.00$2,100.00
85Curb ramps (type 10) (531-7011)EACH10$1,634.91$1,780.00$1,775.00$2,100.00
86Metal W-beam guard fence (timber post) (540-7001)LF50$26.00$28.50$30.00$25.85
87Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,200.00$2,350.00$2,800.00$2,125.00
88Downstream anchor terminal section (540-7015)EACH2$1,600.00$1,320.00$3,000.00$1,190.00
89Remove metal beam guard fence (542-7001)LF2,175$3.56$2.90$8.00$2.00
90Remove downstream anchor terminal (542-7003)EACH6$201.93$453.00$380.00$225.00
91Guardrail end treatment (install) (544-7001)EACH2$3,300.00$3,210.00$4,000.00$2,900.00
92Crash cushion attenuator (move & reset) (545-7002)EACH6$1,511.67$1,650.00$3,000.00$1,490.00
93Crash cushion attenuator (remove) (545-7004)EACH4$1,035.39$534.00$1,550.00$800.00
94Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$25,000$8,770.00$5,600.00$7,800.00
95Mailbox install-S (TWG-post) type 4 (560-7013)EACH23$412.97$249.00$460.00$225.00
96Conduit (PVC) (schedule 40) (1") (618-7021)LF160$19.92$24.25$20.00$22.00
97Conduit (PVC) (schedule 40) (2") (618-7030)LF1,870$12.64$15.50$19.00$14.00
98Conduit (PVC) (schedule 40) (4") (618-7040)LF205$28.79$31.00$30.00$28.00
99Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF480$36.58$44.25$40.00$40.00
100Electrical conductor (no.8) bare (620-7007)LF1,050$1.55$2.10$2.00$1.90
101Electrical conductor (no.6) bare (620-7009)LF115$1.81$2.50$2.00$2.25
102Electrical conductor (no.6) insulated (620-7010)LF155$2.57$2.55$2.00$2.30
103Tray cable (4 conductor) (12 AWG) (621-7006)LF785$2.50$2.75$3.00$2.50
104Ground box type A (122311)W/apron (624-7002)EACH25$1,100.00$1,090.00$1,070.00$990.00
105Ground box type D (162922)W/apron (624-7008)EACH1$1,461.77$1,270.00$1,250.00$1,150.00
106Remove ground box (624-7013)EACH8$293.16$404.00$400.00$365.00
107Zinc-coat steel wire strand (3/8") (625-7004)LF1,850$2.76$3.10$3.00$2.80
108Remove electrical services (628-7002)EACH3$665.79$608.00$600.00$560.00
109Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322)EACH3$2,524.45$3,150.00$3,090.00$2,850.00
110Aluminum signs (type A) (636-7001)SF92$30.60$25.25$20.00$75.00
111Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH22$778.20$796.07$740.00$720.00
112Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH6$830.25$995.00$1,320.00$900.00
113Relocate SM RD SN sup&AM type S80 (644-7067)EACH2$639.08$254.00$1,540.00$700.00
114Remove SM RD SN sup&AM (644-7073)EACH18$90.00$122.00$270.00$100.00
115Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF18,550$0.54$0.64$0.50$0.60
116Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF426$9.25$9.95$9.00$9.00
117Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF22,384$0.54$0.64$0.50$0.60
118Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH1,247$3.00$8.30$8.00$7.50
119Work zone pavement marking removing (W)6"(DOT) (662-7066)LF159$1.75$3.30$3.00$3.00
120Work zone pavement marking removing (W)6"(solid) (662-7068)LF21,620$0.76$0.46$0.50$0.50
121Work zone pavement marking removing (W)8"(solid) (662-7072)LF100$1.41$3.30$3.00$3.00
122Work zone pavement marking removing (Y)6"(solid) (662-7100)LF33,417$0.85$0.46$0.50$0.50
123Work zone pavement marking removing (Y)12"(solid) (662-7103)LF398$1.90$3.30$3.00$3.00
124Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH2,500$1.28$1.45$2.00$1.00
125Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH3,000$1.73$1.05$2.00$1.00
126Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,009$1.18$0.97$1.00$1.00
127Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,171$8.77$9.95$9.00$9.00
128Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH10$161.48$221.00$200.00$200.00
129Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH10$200.23$332.00$300.00$305.00
130Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF252$4.87$2.20$2.00$2.00
131Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF5,040$0.75$0.97$1.00$0.90
132Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF21,828$0.73$0.82$0.50$0.80
133Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF4,340$0.75$0.97$1.00$0.90
134Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF21,749$0.67$0.82$0.50$0.80
135Reflectorized pavement marker type I-C (672-7002)EACH310$4.69$8.30$8.00$7.50
136Reflectorized pavement marker type II-A-A (672-7004)EACH605$3.85$8.30$8.00$7.50
137Eliminating existing PM & markers (4") (677-7001)LF15,440$0.40$0.55$0.50$0.50
138Eliminating existing PM & markers (24") (677-7008)LF80$3.00$11.00$10.00$10.00
139Install highway traffic signal (isolated) (680-7002)EACH2$18,500$20,500$21,100$18,500
140Removing traffic signals (680-7004)EACH2$2,900.00$3,040.00$2,980.00$2,750.00
141Temporary traffic signals (681-7001)EACH3$40,000$11,300$11,600$10,250
142Vehicle signal section (12")LED(green) (682-7001)EACH8$275.55$348.00$340.00$315.00
143Vehicle signal section (12")LED(green arrow) (682-7002)EACH4$280.15$348.00$340.00$315.00
144Vehicle signal section (12")LED(yel) (682-7003)EACH12$281.33$348.00$340.00$315.00
145Vehicle signal section (12")LED(yel arrow) (682-7004)EACH8$284.63$348.00$340.00$315.00
146Vehicle signal section (12")LED(red) (682-7005)EACH8$280.74$348.00$340.00$315.00
147Vehicle signal section (12")LED(red arrow) (682-7006)EACH4$283.82$348.00$340.00$315.00
148Pedestrian signal section (LED)(countdown) (682-7018)EACH12$597.00$691.00$680.00$625.00
149Back plate (12")(3 sect) (682-7052)EACH8$85.95$105.00$100.00$95.00
150Back plate (12")(4 sect) (682-7053)EACH4$170.00$127.00$120.00$115.00
151Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF2,375$2.01$1.95$2.00$1.75
152Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010)LF4,000$2.54$2.45$2.00$2.20
153Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF2,705$2.80$2.75$3.00$2.50
154Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080)LF5,635$1.86$1.95$2.00$1.75
155Install RDSD flash beacon assembly (685-7001)EACH2$5,306.14$6,360.00$6,410.00$5,750.00
156Remove RDSD flash beacon assembly (685-7003)EACH3$500.00$1,220.00$1,190.00$1,100.00
157Ins traffic signal PL AM (S)STR(type B) (686-7007)EACH3$6,280.93$9,180.00$8,990.00$5,300.00
158Ins traffic signal PL AM (S)STR(type B)lum (686-7008)EACH3$7,357.85$9,840.00$9,640.00$8,900.00
159Pedestrian pole assembly (687-7001)EACH6$2,069.33$1,310.00$1,280.00$1,185.00
160Pedestrian detect push button (APS) (688-7001)EACH12$846.42$912.00$890.00$825.00
161Pedestrian detector controller unit (688-7003)EACH2$3,200.00$4,020.00$3,940.00$3,640.00
162Vehicle LP detect (sawcut) (688-7004)LF2,047$12.43$18.25$20.00$16.50
163Removal of control cabinet(GRND MNT) (690-7038)EACH1$451.43$332.00$920.00$850.00
164Tree removal (4" - 12" diameter) (752-7005)EACH329$375.13$70.00$20.00$400.00
165Tree removal (12" - 18" diameter) (752-7006)EACH177$431.19$129.00$140.00$725.00
166Tree removal (18" - 24" diameter) (752-7007)EACH5$675.00$226.00$2,570.00$1,925.00
167PRSSR irrig PVC pipe (18") (1000-7001)LF380$220.00$93.00$90.00$160.00
168PRSSR irrig PVC pipe (24") (1000-7002)LF573$237.39$142.00$140.00$180.00
169Irrigation well (48") (1004-7001)EACH4$12,000$23,400$21,300$65,000
170Irrigation well (60") (1004-7002)EACH9$18,500$24,800$26,000$81,000
171Bonding course (3007-7001)GAL6,857$4.75$4.50$1.00$2.80
172Welded steel casing pipe (open cut)(24") (7003-7001)LF316$200.00$173.00$241.00$500.00
173Welded steel casing pipe (open cut)(30") (7003-7002)LF458$200.00$225.00$296.00$580.00
TxDOT contract A00096030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy