Widen Road - Add Lanes, FM 494 (FM 676 (MILE 5) to FM 1924 (MILE 3)). Let by Texas DOT on April 3, 2025, Hidalgo, Pharr District. 3 bids received; low bid $15,739,166 by Reim Construction, Inc., -6.4% against the engineer's estimate of $16,823,453.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 173
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Reim Construction, Inc. | $15,739,166 | Low | -6.0% |
| 2 | Texas Cordia Construction, LLC | $16,138,156 | +3.0% | -4.0% |
| 3 | Foremost Paving, Inc. | $19,596,885 | +25% | +16% |
Engineer's estimate: $16,823,453.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Reim Construction, Inc. | 2. Texas Cordia Construction, LLC | 3. Foremost Paving, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 111 | $3,000.00 | $2,700.00 | $2,500.00 | $5,000.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 113 | $7.70 | $6.35 | $20.00 | $25.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 469 | $17.73 | $7.85 | $5.00 | $10.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 1,992 | $17.25 | $9.75 | $5.00 | $20.50 |
| 5 | Removing concrete (curb & gutter) (104-7017) | LF | 520 | $7.50 | $3.30 | $3.00 | $8.50 |
| 6 | Remove (10") TRT/untrt base & asphalt pavement (105-7089) | CY | 1,000 | $15.36 | $11.90 | $20.00 | $8.00 |
| 7 | Excavation (roadway) (110-7001) | CY | 44,651 | $7.50 | $5.30 | $7.00 | $7.50 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 6,878 | $20.00 | $5.40 | $3.00 | $10.00 |
| 9 | Backfill (type A) (134-7001) | STA | 20 | $122.37 | $232.00 | $200.00 | $455.00 |
| 10 | Furn & place topsoil (vehicle) (160-7007) | CY | 100 | $40.50 | $38.25 | $40.00 | $16.00 |
| 11 | Hydro mulch seed (permanent_urban_sandy) (164-7019) | SY | 23,259 | $0.65 | $0.69 | $0.50 | $0.70 |
| 12 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 23,259 | $0.45 | $0.35 | $0.50 | $0.33 |
| 13 | Vegetative watering (168-7001) | TGL | 395 | $21.50 | $29.25 | $30.00 | $65.00 |
| 14 | Sprinkling (dust control) (204-7001) | TGL | 444 | $13.29 | $29.25 | $20.00 | $1.00 |
| 15 | Proof rolling (216-7001) | HR | 200 | $117.74 | $40.25 | $60.00 | $80.00 |
| 16 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 14,422 | $35.98 | $34.50 | $38.00 | $32.00 |
| 17 | Geogrid base reinforcement (type 2) (250-7002) | SY | 106,046 | $1.35 | $1.10 | $2.00 | $1.40 |
| 18 | Rework BS metal (type B)(5")(DC)(org pos) (251-7090) | CY | 14,422 | $22.00 | $4.10 | $4.00 | $8.50 |
| 19 | Cement (275-7001) | TON | 2,548 | $226.45 | $216.00 | $210.00 | $190.00 |
| 20 | Cement TRT (existing material & new base)(10") (275-7008) | SY | 103,824 | $3.00 | $1.75 | $2.00 | $2.20 |
| 21 | Cement TRT (subgrade)(12") (275-7015) | SY | 106,046 | $2.00 | $1.90 | $2.00 | $2.60 |
| 22 | Salvage,haul & stockpile reclaimed asphalt PV(3"to 6") (305-7050) | SY | 46,835 | $2.50 | $3.25 | $3.00 | $3.65 |
| 23 | Prime coat (MC-30) (310-7004) | GAL | 21,209 | $5.92 | $4.40 | $5.00 | $4.50 |
| 24 | SP mixes SP-B sac-B PG76-22 (344-7008) | TON | 19,263 | $130.00 | $112.00 | $120.00 | $108.00 |
| 25 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 11,007 | $107.98 | $115.00 | $120.00 | $110.00 |
| 26 | Struct excavation (special) (400-7005) | CY | 2,983 | $77.96 | $73.50 | $100.00 | $75.00 |
| 27 | Cut & restoring pavement (400-7006) | SY | 608 | $90.00 | $61.50 | $85.00 | $100.00 |
| 28 | Cem stabil BKFL (400-7010) | CY | 7,186 | $78.64 | $97.50 | $60.00 | $120.00 |
| 29 | Trench excavation protection (402-7001) | LF | 11,753 | $2.91 | $1.80 | $3.00 | $1.00 |
| 30 | Temporary special shoring (403-7001) | SF | 3,906 | $28.00 | $20.75 | $30.00 | $28.00 |
| 31 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 36 | $203.04 | $155.00 | $150.00 | $140.00 |
| 32 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 84 | $311.74 | $426.00 | $420.00 | $385.00 |
| 33 | Class C concrete (collar) (420-7061) | EACH | 14 | $1,600.00 | $898.00 | $5,340.00 | $6,000.00 |
| 34 | Retaining wall (MSE) (423-7001) | SF | 17,033 | $44.00 | $72.50 | $100.00 | $105.00 |
| 35 | Riprap (concrete)(4 in) (432-7001) | CY | 53 | $651.44 | $437.00 | $630.00 | $450.00 |
| 36 | Rail (type T551) (450-7016) | LF | 2,047 | $131.41 | $211.00 | $50.00 | $95.00 |
| 37 | Rail (type PR11) (450-7044) | LF | 865 | $232.40 | $122.00 | $120.00 | $100.00 |
| 38 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,223 | $70.12 | $77.00 | $80.00 | $150.00 |
| 39 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,351 | $94.19 | $89.00 | $90.00 | $152.00 |
| 40 | RC pipe (CL III)(30 in) (464-7007) | LF | 1,441 | $120.00 | $119.00 | $118.00 | $158.00 |
| 41 | RC pipe (CL III)(36 in) (464-7009) | LF | 371 | $156.00 | $175.00 | $175.00 | $175.00 |
| 42 | RC pipe (CL III)(42 in) (464-7010) | LF | 1,855 | $180.00 | $232.00 | $230.00 | $210.00 |
| 43 | RC pipe (CL III)(48 in) (464-7011) | LF | 2,524 | $200.00 | $273.00 | $270.00 | $260.00 |
| 44 | RC pipe (CL III)(54 in) (464-7012) | LF | 1,991 | $215.00 | $308.00 | $310.00 | $337.00 |
| 45 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 5 | $5,500.00 | $4,700.00 | $5,000.00 | $6,600.00 |
| 46 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 18 | $5,200.00 | $4,930.00 | $5,270.00 | $6,600.00 |
| 47 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 4 | $6,000.00 | $5,640.00 | $5,970.00 | $7,300.00 |
| 48 | Inlet (complete)(pco)(4FT)(left) (465-7018) | EACH | 2 | $5,800.00 | $6,040.00 | $6,600.00 | $8,400.00 |
| 49 | Inlet (complete)(pco)(4FT)(right) (465-7019) | EACH | 4 | $10,604 | $5,720.00 | $6,200.00 | $8,600.00 |
| 50 | Inlet (complete)(pco)(4FT)(both) (465-7020) | EACH | 1 | $8,863.42 | $6,060.00 | $6,400.00 | $7,600.00 |
| 51 | Inlet (complete)(pco)(5FT)(none) (465-7021) | EACH | 1 | $5,548.00 | $6,080.00 | $6,800.00 | $10,500 |
| 52 | Inlet (complete)(pco)(5FT)(left) (465-7022) | EACH | 5 | $12,838 | $6,110.00 | $6,400.00 | $9,000.00 |
| 53 | Inlet (complete)(pco)(5FT)(both) (465-7024) | EACH | 1 | $12,269 | $6,970.00 | $7,000.00 | $9,400.00 |
| 54 | Inlet (complete)(pco)(6FT)(left) (465-7026) | EACH | 8 | $12,542 | $7,330.00 | $8,900.00 | $12,200 |
| 55 | Inlet (complete)(pco)(6FT)(both) (465-7028) | EACH | 5 | $8,223.89 | $7,850.00 | $9,500.00 | $11,300 |
| 56 | Inlet (complete)(pcu)(3FT)(none) (465-7029) | EACH | 4 | $5,328.00 | $3,750.00 | $4,300.00 | $5,900.00 |
| 57 | Inlet (complete)(PSL)(RC)(6FTX6FT) (465-7076) | EACH | 5 | $8,731.00 | $7,380.00 | $11,600 | $10,000 |
| 58 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 5 | $4,600.00 | $3,620.00 | $4,780.00 | $8,300.00 |
| 59 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,506.67 | $652.00 | $700.00 | $600.00 |
| 60 | Removing structure (set) (496-7004) | EACH | 16 | $620.92 | $294.00 | $300.00 | $600.00 |
| 61 | Removing structure (pipe) (496-7007) | LF | 302 | $12.91 | $11.00 | $10.00 | $50.00 |
| 62 | Mobilization (500-7001) | LS | 1 | $1,530,768 | $1,300,000 | $834,900 | $1,750,000 |
| 63 | Barricades, signs and traffic handling (502-7001) | MO | 20 | $7,580.33 | $2,380.00 | $500.00 | $8,500.00 |
| 64 | Portable changeable message sign (503-7001) | DAY | 100 | $106.68 | $56.00 | $30.00 | $65.00 |
| 65 | Portable changeable message sign (503-7002) | EACH | 2 | $3,277.76 | $2,810.00 | $300.00 | $13,000 |
| 66 | TMA (stationary) (505-7001) | DAY | 720 | $72.62 | $28.00 | $15.00 | $40.00 |
| 67 | TMA (mobile operation) (505-7003) | DAY | 480 | $115.18 | $56.00 | $25.00 | $0.01 |
| 68 | Construction exits (install) (type 2) (506-7021) | SY | 480 | $25.61 | $9.85 | $10.00 | $30.00 |
| 69 | Construction exits (remove) (506-7024) | SY | 480 | $7.73 | $8.25 | $8.00 | $15.00 |
| 70 | Temporary sediment control fence (install) (506-7039) | LF | 100 | $3.77 | $4.50 | $6.00 | $9.00 |
| 71 | Temporary sediment control fence (remove) (506-7041) | LF | 100 | $1.15 | $1.95 | $3.00 | $3.00 |
| 72 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 930 | $3.81 | $2.45 | $5.00 | $6.00 |
| 73 | Biodegradable erosion control logs (remove) (506-7046) | LF | 930 | $1.10 | $1.00 | $1.00 | $2.00 |
| 74 | Constructing detours (508-7001) | SY | 6,943 | $42.04 | $41.50 | $38.00 | $50.00 |
| 75 | PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089) | LF | 3,720 | $51.94 | $8.65 | $30.00 | $30.00 |
| 76 | PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090) | LF | 3,720 | $6.46 | $6.75 | $6.00 | $11.00 |
| 77 | PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092) | LF | 3,720 | $10.50 | $4.25 | $10.00 | $9.00 |
| 78 | Concrete C&G (valley gutter) (529-7019) | LF | 456 | $58.95 | $41.50 | $78.00 | $52.00 |
| 79 | Concrete curb (type F3) (529-7022) | LF | 865 | $221.89 | $163.00 | $210.00 | $420.00 |
| 80 | Concrete curb & gutter (type B) (mountable) (529-7024) | LF | 16,907 | $15.63 | $15.00 | $19.00 | $15.00 |
| 81 | Driveways (concrete) (530-7006) | SY | 1,166 | $78.97 | $61.00 | $90.00 | $64.20 |
| 82 | Driveways (ACP) (530-7010) | SY | 2,466 | $39.44 | $36.25 | $30.00 | $48.00 |
| 83 | Concrete sidewalks (4") (531-7001) | SY | 12,433 | $47.25 | $41.00 | $50.00 | $57.00 |
| 84 | Curb ramps (type 1) (531-7005) | EACH | 12 | $1,800.00 | $1,570.00 | $1,760.00 | $2,100.00 |
| 85 | Curb ramps (type 10) (531-7011) | EACH | 10 | $1,634.91 | $1,780.00 | $1,775.00 | $2,100.00 |
| 86 | Metal W-beam guard fence (timber post) (540-7001) | LF | 50 | $26.00 | $28.50 | $30.00 | $25.85 |
| 87 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,200.00 | $2,350.00 | $2,800.00 | $2,125.00 |
| 88 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,600.00 | $1,320.00 | $3,000.00 | $1,190.00 |
| 89 | Remove metal beam guard fence (542-7001) | LF | 2,175 | $3.56 | $2.90 | $8.00 | $2.00 |
| 90 | Remove downstream anchor terminal (542-7003) | EACH | 6 | $201.93 | $453.00 | $380.00 | $225.00 |
| 91 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,300.00 | $3,210.00 | $4,000.00 | $2,900.00 |
| 92 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 6 | $1,511.67 | $1,650.00 | $3,000.00 | $1,490.00 |
| 93 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $1,035.39 | $534.00 | $1,550.00 | $800.00 |
| 94 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 4 | $25,000 | $8,770.00 | $5,600.00 | $7,800.00 |
| 95 | Mailbox install-S (TWG-post) type 4 (560-7013) | EACH | 23 | $412.97 | $249.00 | $460.00 | $225.00 |
| 96 | Conduit (PVC) (schedule 40) (1") (618-7021) | LF | 160 | $19.92 | $24.25 | $20.00 | $22.00 |
| 97 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,870 | $12.64 | $15.50 | $19.00 | $14.00 |
| 98 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 205 | $28.79 | $31.00 | $30.00 | $28.00 |
| 99 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 480 | $36.58 | $44.25 | $40.00 | $40.00 |
| 100 | Electrical conductor (no.8) bare (620-7007) | LF | 1,050 | $1.55 | $2.10 | $2.00 | $1.90 |
| 101 | Electrical conductor (no.6) bare (620-7009) | LF | 115 | $1.81 | $2.50 | $2.00 | $2.25 |
| 102 | Electrical conductor (no.6) insulated (620-7010) | LF | 155 | $2.57 | $2.55 | $2.00 | $2.30 |
| 103 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 785 | $2.50 | $2.75 | $3.00 | $2.50 |
| 104 | Ground box type A (122311)W/apron (624-7002) | EACH | 25 | $1,100.00 | $1,090.00 | $1,070.00 | $990.00 |
| 105 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $1,461.77 | $1,270.00 | $1,250.00 | $1,150.00 |
| 106 | Remove ground box (624-7013) | EACH | 8 | $293.16 | $404.00 | $400.00 | $365.00 |
| 107 | Zinc-coat steel wire strand (3/8") (625-7004) | LF | 1,850 | $2.76 | $3.10 | $3.00 | $2.80 |
| 108 | Remove electrical services (628-7002) | EACH | 3 | $665.79 | $608.00 | $600.00 | $560.00 |
| 109 | Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322) | EACH | 3 | $2,524.45 | $3,150.00 | $3,090.00 | $2,850.00 |
| 110 | Aluminum signs (type A) (636-7001) | SF | 92 | $30.60 | $25.25 | $20.00 | $75.00 |
| 111 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 22 | $778.20 | $796.07 | $740.00 | $720.00 |
| 112 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 6 | $830.25 | $995.00 | $1,320.00 | $900.00 |
| 113 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 2 | $639.08 | $254.00 | $1,540.00 | $700.00 |
| 114 | Remove SM RD SN sup&AM (644-7073) | EACH | 18 | $90.00 | $122.00 | $270.00 | $100.00 |
| 115 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 18,550 | $0.54 | $0.64 | $0.50 | $0.60 |
| 116 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 426 | $9.25 | $9.95 | $9.00 | $9.00 |
| 117 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 22,384 | $0.54 | $0.64 | $0.50 | $0.60 |
| 118 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 1,247 | $3.00 | $8.30 | $8.00 | $7.50 |
| 119 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 159 | $1.75 | $3.30 | $3.00 | $3.00 |
| 120 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 21,620 | $0.76 | $0.46 | $0.50 | $0.50 |
| 121 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 100 | $1.41 | $3.30 | $3.00 | $3.00 |
| 122 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 33,417 | $0.85 | $0.46 | $0.50 | $0.50 |
| 123 | Work zone pavement marking removing (Y)12"(solid) (662-7103) | LF | 398 | $1.90 | $3.30 | $3.00 | $3.00 |
| 124 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,500 | $1.28 | $1.45 | $2.00 | $1.00 |
| 125 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 3,000 | $1.73 | $1.05 | $2.00 | $1.00 |
| 126 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,009 | $1.18 | $0.97 | $1.00 | $1.00 |
| 127 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,171 | $8.77 | $9.95 | $9.00 | $9.00 |
| 128 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 10 | $161.48 | $221.00 | $200.00 | $200.00 |
| 129 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 10 | $200.23 | $332.00 | $300.00 | $305.00 |
| 130 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 252 | $4.87 | $2.20 | $2.00 | $2.00 |
| 131 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,040 | $0.75 | $0.97 | $1.00 | $0.90 |
| 132 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 21,828 | $0.73 | $0.82 | $0.50 | $0.80 |
| 133 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,340 | $0.75 | $0.97 | $1.00 | $0.90 |
| 134 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 21,749 | $0.67 | $0.82 | $0.50 | $0.80 |
| 135 | Reflectorized pavement marker type I-C (672-7002) | EACH | 310 | $4.69 | $8.30 | $8.00 | $7.50 |
| 136 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 605 | $3.85 | $8.30 | $8.00 | $7.50 |
| 137 | Eliminating existing PM & markers (4") (677-7001) | LF | 15,440 | $0.40 | $0.55 | $0.50 | $0.50 |
| 138 | Eliminating existing PM & markers (24") (677-7008) | LF | 80 | $3.00 | $11.00 | $10.00 | $10.00 |
| 139 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $18,500 | $20,500 | $21,100 | $18,500 |
| 140 | Removing traffic signals (680-7004) | EACH | 2 | $2,900.00 | $3,040.00 | $2,980.00 | $2,750.00 |
| 141 | Temporary traffic signals (681-7001) | EACH | 3 | $40,000 | $11,300 | $11,600 | $10,250 |
| 142 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $275.55 | $348.00 | $340.00 | $315.00 |
| 143 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $280.15 | $348.00 | $340.00 | $315.00 |
| 144 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 12 | $281.33 | $348.00 | $340.00 | $315.00 |
| 145 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 8 | $284.63 | $348.00 | $340.00 | $315.00 |
| 146 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $280.74 | $348.00 | $340.00 | $315.00 |
| 147 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $283.82 | $348.00 | $340.00 | $315.00 |
| 148 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 12 | $597.00 | $691.00 | $680.00 | $625.00 |
| 149 | Back plate (12")(3 sect) (682-7052) | EACH | 8 | $85.95 | $105.00 | $100.00 | $95.00 |
| 150 | Back plate (12")(4 sect) (682-7053) | EACH | 4 | $170.00 | $127.00 | $120.00 | $115.00 |
| 151 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 2,375 | $2.01 | $1.95 | $2.00 | $1.75 |
| 152 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 4,000 | $2.54 | $2.45 | $2.00 | $2.20 |
| 153 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 2,705 | $2.80 | $2.75 | $3.00 | $2.50 |
| 154 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 5,635 | $1.86 | $1.95 | $2.00 | $1.75 |
| 155 | Install RDSD flash beacon assembly (685-7001) | EACH | 2 | $5,306.14 | $6,360.00 | $6,410.00 | $5,750.00 |
| 156 | Remove RDSD flash beacon assembly (685-7003) | EACH | 3 | $500.00 | $1,220.00 | $1,190.00 | $1,100.00 |
| 157 | Ins traffic signal PL AM (S)STR(type B) (686-7007) | EACH | 3 | $6,280.93 | $9,180.00 | $8,990.00 | $5,300.00 |
| 158 | Ins traffic signal PL AM (S)STR(type B)lum (686-7008) | EACH | 3 | $7,357.85 | $9,840.00 | $9,640.00 | $8,900.00 |
| 159 | Pedestrian pole assembly (687-7001) | EACH | 6 | $2,069.33 | $1,310.00 | $1,280.00 | $1,185.00 |
| 160 | Pedestrian detect push button (APS) (688-7001) | EACH | 12 | $846.42 | $912.00 | $890.00 | $825.00 |
| 161 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $3,200.00 | $4,020.00 | $3,940.00 | $3,640.00 |
| 162 | Vehicle LP detect (sawcut) (688-7004) | LF | 2,047 | $12.43 | $18.25 | $20.00 | $16.50 |
| 163 | Removal of control cabinet(GRND MNT) (690-7038) | EACH | 1 | $451.43 | $332.00 | $920.00 | $850.00 |
| 164 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 329 | $375.13 | $70.00 | $20.00 | $400.00 |
| 165 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 177 | $431.19 | $129.00 | $140.00 | $725.00 |
| 166 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 5 | $675.00 | $226.00 | $2,570.00 | $1,925.00 |
| 167 | PRSSR irrig PVC pipe (18") (1000-7001) | LF | 380 | $220.00 | $93.00 | $90.00 | $160.00 |
| 168 | PRSSR irrig PVC pipe (24") (1000-7002) | LF | 573 | $237.39 | $142.00 | $140.00 | $180.00 |
| 169 | Irrigation well (48") (1004-7001) | EACH | 4 | $12,000 | $23,400 | $21,300 | $65,000 |
| 170 | Irrigation well (60") (1004-7002) | EACH | 9 | $18,500 | $24,800 | $26,000 | $81,000 |
| 171 | Bonding course (3007-7001) | GAL | 6,857 | $4.75 | $4.50 | $1.00 | $2.80 |
| 172 | Welded steel casing pipe (open cut)(24") (7003-7001) | LF | 316 | $200.00 | $173.00 | $241.00 | $500.00 |
| 173 | Welded steel casing pipe (open cut)(30") (7003-7002) | LF | 458 | $200.00 | $225.00 | $296.00 | $580.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.