TxDOT contract A00184586 bid tabulation

Hazard Elimination & Safety, FM 490 (Hidalgo/Willacy County Line to FM 88). Let by Texas DOT on August 8, 2025, Willacy, Pharr District. 6 bids received; low bid $5,120,329 by Asago, LLC, -23% against the engineer's estimate of $6,632,831.

Owner
Texas DOT
Letting
08 AUG 2025
Pay items
85
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Asago, LLC$5,120,329Low-23%
2Texas Cordia Construction, LLC$5,877,493+15%-11%
3Foremost Paving, Inc.$5,923,767+16%-11%
4Posillico Civil, Inc.$5,970,922+17%-10%
5P & C Oil Field Service LLC$6,149,843+20%-7.0%
6Ioc Company LLC$6,413,925+25%-3.0%
TxDOT contract A00184586: bids by rank

Engineer's estimate: $6,632,831.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Asago, LLC2. Texas Cordia Construction, LLC3. Foremost Paving, Inc.4. Posillico Civil, Inc.5. P & C Oil Field Service LLC6. Ioc Company LLC
1Preparing row (100-7002)STA159$3,500.00$500.00$2,075.00$3,175.00$1,100.00$2,300.00$3,900.00
2Removing concrete (pavement) (104-7001)SY29,044$10.00$5.50$10.00$4.20$12.00$12.00$10.00
3Removing concrete (riprap) (104-7006)SY61$18.00$35.00$50.00$43.50$25.00$62.75$125.00
4Obliterating abandoned road (106-7002)SY3,100$11.00$4.00$7.00$2.30$2.25$14.50$10.00
5Excavation (roadway) (110-7001)CY23,241$12.00$4.00$4.00$9.90$7.50$15.15$5.00
6Embankment (final)(DC)(type C) (132-7006)CY10,683$16.00$5.00$3.00$10.20$6.50$14.15$15.00
7Backfill (type A) (134-7001)STA159$300.00$200.00$480.00$169.80$500.00$475.00$300.00
8Furn & place topsoil (vehicle) (160-7007)CY50$32.50$35.00$49.00$53.50$50.00$30.00$1.00
9Hydro mulch seed (permanent_rural_clay) (164-7018)SY99,315$0.45$0.56$0.50$0.50$0.65$0.56$0.49
10Hydro mulch seed (temporary_warm) (164-7021)SY99,315$0.40$0.39$0.40$0.40$0.50$0.45$0.32
11Vegetative watering (168-7001)TGL1,672$31.00$11.00$20.00$60.00$16.00$38.00$35.00
12Sprinkling (dust control) (204-7001)TGL636$12.00$1.00$30.00$1.00$8.00$7.75$1.00
13FL BS (roadway del)(type E GR 4)(final pos) (247-7277)CY13,602$38.00$37.00$37.00$26.80$42.00$42.00$30.00
14Rework BS metal (type B)(6")(DC)(org pos) (251-7034)CY2,590$3.00$8.00$19.00$9.00$6.00$15.00$15.00
15Rework BS metal (type B)(14")(DC)(org pos) (251-7087)CY1,190$5.00$9.00$22.00$11.00$8.00$18.25$15.00
16Cement (275-7001)TON1,543$205.00$200.00$200.00$199.90$230.00$210.00$200.00
17Cement TRT (existing material)(12") (275-7005)SY64,332$1.50$3.00$2.00$4.30$2.25$2.75$3.50
18Cement TRT (existing material & new base)(10") (275-7008)SY62,598$3.00$3.00$3.00$4.10$1.45$2.35$3.50
19Salvage,haul & stockpile reclaimed asphalt PV (0 to 3") (305-7023)SY39,493$7.50$2.25$4.00$3.80$2.75$2.50$2.00
20Prime coat (MC-30) (310-7004)GAL12,521$5.00$6.00$6.00$4.60$6.00$6.25$5.00
21Asphalt (tier II) (316-7266)GAL17,220$5.00$5.00$5.00$8.00$7.50$6.25$3.50
22Aggregate (type-D GR-4P) (sac B) (316-7280)CY461$140.00$135.00$181.00$77.10$93.00$275.00$150.00
23SP mixes SP-D sac-A PG76-22 (344-7064)TON10,141$145.00$130.00$125.00$120.30$140.00$130.00$134.00
24Plane & text asphalt concrete pavement(1.5") (354-7018)SY3,780$10.00$3.00$2.00$7.60$2.00$4.00$3.00
25Struct excavation (special) (400-7005)CY101$100.00$95.00$70.00$90.00$130.00$98.00$115.00
26Cut & restore asphalt paving (400-7008)SY840$175.00$80.00$75.00$80.00$95.00$100.00$125.00
27Cem stabil BKFL (400-7010)CY140$100.00$90.00$84.00$170.00$90.00$160.00$100.00
28Trench excavation protection (402-7001)LF760$5.50$4.75$7.00$1.00$5.00$4.00$0.10
29Riprap (concrete)(CL B)(5 in) (432-7008)CY15.50$550.00$600.00$1,010.00$900.00$425.00$1,700.00$415.00
30Concrete box culvert (3 FT X 2 FT) (462-7001)LF288$390.00$400.00$500.00$490.00$560.00$500.00$700.00
31Concrete box culvert (5 FT X 3 FT) (462-7007)LF88$450.00$700.00$1,840.00$1,820.00$1,170.00$1,175.00$1,000.00
32RC pipe (CL IV)(15 in) (464-7018)LF80$60.00$170.00$115.00$320.00$240.00$245.00$285.00
33RC pipe (CL IV)(18 in) (464-7019)LF84$150.00$175.00$116.00$250.00$245.00$235.00$235.00
34RC pipe (CL IV)(24 in) (464-7021)LF172$145.00$185.00$160.00$330.00$300.00$275.00$295.00
35Headwall (CH - PW - 0) (diameter= 18 in) (466-7099)EACH1$6,000.00$7,500.00$18,300$7,800.00$25,000$8,000.00$13,000
36Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH4$8,000.00$8,000.00$18,850$8,000.00$15,000$7,550.00$14,000
37Wingwall (FW - 0) (HW=3 FT) (466-7145)EACH12$10,000$15,000$25,580$11,000$15,000$9,250.00$17,000
38Wingwall (PW - 1) (HW=5 FT) (466-7175)EACH2$12,570$20,000$27,000$19,000$15,000$12,450$23,750
39Removing structure (wingwall) (496-7005)EACH19$2,000.00$1,500.00$2,080.00$900.00$570.00$1,500.00$500.00
40Removing structure (headwall) (496-7006)EACH2$3,000.00$1,500.00$2,930.00$1,500.00$570.00$2,600.00$500.00
41Removing structure (pipe) (496-7007)LF350$20.00$10.00$15.00$15.00$23.00$30.00$10.00
42Removing structure (box culvert) (496-7008)LF380$35.00$20.00$71.00$160.00$42.00$48.00$25.00
43Mobilization (500-7001)LS1$602,985$500,000$350,000$500,000$542,811$215,500$623,000
44Barricades, signs and traffic handling (502-7001)MO15$8,000.00$5,000.00$350.00$5,375.00$5,000.00$1,250.00$3,807.28
45Portable changeable message sign (503-7002)EACH4$10,000$15,000$250.00$8,466.30$20,000$7,900.00$23,293
46TMA (stationary) (505-7001)DAY342$100.00$10.00$75.00$32.00$85.00$160.00$100.00
47TMA (mobile operation) (505-7003)DAY23$200.00$100.00$150.00$0.01$800.00$325.00$150.00
48Construction exits (install) (type 2) (506-7021)SY624$30.00$20.00$23.00$23.30$25.00$35.00$25.00
49Construction exits (remove) (506-7024)SY624$5.00$10.00$10.00$13.80$15.00$11.00$10.00
50Temporary sediment control fence (install) (506-7039)LF280$5.00$10.00$8.00$8.50$5.00$11.00$8.50
51Temporary sediment control fence (remove) (506-7041)LF280$2.50$1.00$2.00$4.80$2.50$1.75$4.75
52Biodegradable erosion control logs (install) (12") (506-7044)LF840$5.00$10.00$13.00$8.00$5.00$8.00$8.00
53Biodegradable erosion control logs (remove) (506-7046)LF840$1.50$1.00$2.00$2.60$1.00$2.50$2.60
54Constructing detours (508-7001)SY2,500$100.00$55.00$100.00$41.40$48.00$75.00$50.00
55Driveways (ACP) (530-7010)SY1,381$60.00$47.00$33.00$44.60$38.00$90.00$75.00
56Mill rumble strips (asphalt) (shoulder) (533-7001)LF30,994$0.20$0.26$0.25$0.40$0.25$0.26$0.25
57Mill rumble strips (asphalt) (centerline) (533-7002)LF14,372$0.30$0.32$0.25$0.50$0.30$0.35$0.31
58Mailbox install-S (TWW-post) type 4 (560-7008)EACH2$290.00$345.39$860.00$400.00$375.00$390.00$375.00
59Aluminum signs (type A) (636-7001)SF89$32.00$12.38$15.00$26.00$26.00$26.00$26.00
60Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH30$800.00$663.91$950.00$875.00$875.00$925.00$875.00
61Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH13$850.00$740.14$1,050.00$950.00$1,025.00$1,050.00$1,025.00
62Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH10$980.00$780.51$1,100.00$1,050.00$1,200.00$1,200.00$1,200.00
63Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,200.00$838.01$1,500.00$1,300.00$1,550.00$1,600.00$1,550.00
64Remove SM RD SN sup&AM (644-7073)EACH37$100.00$92.65$250.00$175.00$80.00$90.00$80.00
65Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH20$100.00$104.37$325.00$50.00$85.00$85.00$85.00
66Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF33,576$0.45$0.53$1.00$0.60$0.52$0.54$0.52
67Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH6$100.00$255.00$250.00$250.00$250.00$260.00$250.00
68Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF33,576$0.45$0.53$1.00$0.60$0.52$0.54$0.52
69Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,736$1.00$1.00$6.00$1.30$2.50$0.50$2.00
70Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH1,594$1.00$1.00$6.00$1.30$2.50$0.50$2.21
71Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF266$1.10$2.04$2.00$2.00$2.00$2.00$2.00
72Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF36$8.00$16.32$16.00$16.00$16.00$16.00$16.00
73Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF716$5.00$2.24$2.00$2.20$2.20$2.25$2.20
74Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF30,722$0.60$0.67$1.00$0.70$0.66$0.69$0.66
75Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF3,400$0.65$1.12$1.00$1.10$1.10$1.00$1.10
76Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF8,690$0.60$1.00$1.00$1.00$0.98$1.00$0.98
77Prefabricated PM type C (W)(arrow) (668-7091)EACH3$220.00$255.00$250.00$250.00$250.00$260.00$250.00
78Prefabricated PM type C (W)(word) (668-7103)EACH3$275.00$306.00$300.00$300.00$300.00$300.00$300.00
79Reflectorized pavement marker type I-C (672-7002)EACH13$3.50$20.40$20.00$20.00$20.00$20.00$20.00
80Reflectorized pavement marker type II-A-A (672-7004)EACH280$3.50$7.65$8.00$7.50$7.50$8.00$7.50
81Eliminating existing PM & markers (4") (677-7001)LF17,943$0.25$0.58$1.00$0.60$0.57$0.65$0.57
82Eliminating existing PM & markers (24") (677-7008)LF16$3.30$5.10$5.00$5.00$5.00$5.23$5.00
83Bonding course (3007-7001)GAL4,284$4.20$5.20$7.00$2.90$8.48$6.00$4.00
84Removing structure (sluice gate) (4034-7001)EACH1$3,000.00$1,400.00$2,330.00$1,000.00$6,500.00$2,500.00$1,000.00
85Stainless steel sluice gate (4034-7002)EACH1$11,330$19,000$27,500$22,500$35,000$20,000$20,000
TxDOT contract A00184586: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy