TxDOT contract A00196904 bid tabulation
Hazard Elimination & Safety, FM 491 (West Uncle Peters Rd. to First St.). Let by Texas DOT on June 5, 2025, Hidalgo, Pharr District. 4 bids received; low bid $5,167,455 by Texas Cordia Construction, LLC, -12% against the engineer's estimate of $5,890,398.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 94
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Cordia Construction, LLC | $5,167,455 | Low | -12% |
| 2 | Ioc Company LLC | $5,500,924 | +6.0% | -7.0% |
| 3 | Foremost Paving, Inc. | $5,624,083 | +9.0% | -5.0% |
| 4 | Rovan Texas, L.L.C. | $5,625,686 | +9.0% | -4.0% |
Engineer's estimate: $5,890,398.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Cordia Construction, LLC | 2. Ioc Company LLC | 3. Foremost Paving, Inc. | 4. Rovan Texas, L.L.C. |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 192 | $1,200.00 | $1,500.00 | $1,875.00 | $2,500.00 | $704.74 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 157 | $17.50 | $10.00 | $15.00 | $31.17 | $52.90 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 65 | $25.00 | $25.00 | $40.00 | $36.83 | $53.48 |
| 4 | Excavation (roadway) (110-7001) | CY | 154 | $8.00 | $18.00 | $15.00 | $640.21 | $36.75 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,971 | $8.00 | $17.00 | $20.00 | $54.14 | $25.95 |
| 6 | Backfill (type A) (134-7001) | STA | 187 | $275.00 | $280.00 | $125.00 | $276.84 | $510.58 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 40,224 | $3.00 | $2.00 | $0.50 | $3.66 | $2.29 |
| 8 | Drill seed (permanent_rural_sand) (164-7009) | SY | 40,224 | $0.50 | $0.50 | $0.69 | $0.69 | $0.83 |
| 9 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 40,224 | $0.40 | $0.50 | $0.38 | $0.38 | $0.49 |
| 10 | Vegetative watering (168-7001) | TGL | 681 | $14.00 | $20.00 | $35.00 | $60.00 | $71.70 |
| 11 | Sprinkling (dust control) (204-7001) | TGL | 748 | $2.00 | $18.00 | $1.00 | $1.00 | $40.59 |
| 12 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 11,580 | $50.00 | $45.00 | $40.00 | $31.33 | $47.23 |
| 13 | Rework BS metal (type B)(6")(DC)(org pos) (251-7034) | CY | 7,912 | $10.00 | $5.00 | $18.00 | $7.54 | $19.26 |
| 14 | Lime (com or QK)(slurry) (260-7005) | TON | 1,470 | $220.00 | $325.00 | $275.00 | $267.71 | $349.18 |
| 15 | Lime TRT (existing material)(12") (260-7009) | SY | 74,144 | $2.50 | $2.00 | $3.00 | $3.12 | $3.02 |
| 16 | Cement (275-7001) | TON | 662 | $200.00 | $200.00 | $210.00 | $192.75 | $216.49 |
| 17 | Cement TRT (existing material & new base)(10") (275-7008) | SY | 70,330 | $2.40 | $2.00 | $2.00 | $3.54 | $3.77 |
| 18 | Salvage,haul & stockpile reclaimed asphalt PV (1 to 3") (305-7034) | SY | 53,830 | $5.00 | $3.00 | $1.00 | $1.56 | $1.87 |
| 19 | Prime coat (MC-30) (310-7004) | GAL | 13,720 | $5.00 | $6.00 | $4.00 | $4.57 | $4.75 |
| 20 | Aggregate (type-D, GR-4)(sac-B) (316-7185) | CY | 550 | $200.00 | $120.00 | $100.00 | $43.31 | $164.60 |
| 21 | Asphalt (tier II) (316-7266) | GAL | 20,580 | $4.00 | $5.00 | $3.00 | $6.46 | $3.52 |
| 22 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 11,375 | $155.00 | $120.00 | $140.00 | $116.68 | $133.80 |
| 23 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 2,128 | $2.00 | $3.00 | $2.00 | $6.84 | $3.75 |
| 24 | Struct excavation (special) (400-7005) | CY | 47 | $97.00 | $100.00 | $100.00 | $80.00 | $94.61 |
| 25 | Cem stabil BKFL (400-7010) | CY | 90 | $125.00 | $115.00 | $70.00 | $110.00 | $97.34 |
| 26 | Temporary special shoring (403-7001) | SF | 1,201 | $22.00 | $10.00 | $1.00 | $0.50 | $7.24 |
| 27 | Class A concrete (collar) (420-7008) | EACH | 5 | $2,000.00 | $6,000.00 | $1,750.00 | $4,400.00 | $1,366.26 |
| 28 | Riprap (mow strip)(4 in) (432-7013) | CY | 42 | $525.00 | $600.00 | $600.00 | $1,000.00 | $551.60 |
| 29 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 8 | $200.00 | $450.00 | $600.00 | $350.00 | $578.19 |
| 30 | Cleaning and sealing existing joints (438-7001) | LF | 137.30 | $90.00 | $160.00 | $50.00 | $37.22 | $72.38 |
| 31 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,084 | $100.00 | $85.00 | $155.00 | $140.00 | $117.52 |
| 32 | RC pipe (CL III)(21 in) (464-7004) | LF | 110 | $150.00 | $105.00 | $280.00 | $280.00 | $223.72 |
| 33 | RC pipe (CL III)(36 in) (464-7009) | LF | 36 | $300.00 | $245.00 | $375.00 | $500.00 | $228.12 |
| 34 | Headwall (CH - FW - 0) (diameter= 12 in) (466-7001) | EACH | 1 | $10,000 | $21,500 | $15,000 | $1,100.00 | $9,251.07 |
| 35 | Headwall (CH - FW - 0) (diameter= 30 in) (466-7007) | EACH | 2 | $13,000 | $17,250 | $15,500 | $5,000.00 | $13,877 |
| 36 | Headwall (CH - PW - 0) (diameter= 18 in) (466-7099) | EACH | 6 | $12,000 | $18,000 | $14,000 | $8,000.00 | $11,564 |
| 37 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 58 | $1,100.00 | $1,350.00 | $1,200.00 | $1,600.00 | $1,914.19 |
| 38 | Clean existing culverts (480-7001) | EACH | 3 | $3,500.00 | $1,500.00 | $2,000.00 | $3,000.00 | $1,478.66 |
| 39 | Removing structure (set) (496-7004) | EACH | 9 | $500.00 | $400.00 | $450.00 | $600.00 | $1,587.06 |
| 40 | Removing structure (pipe) (496-7007) | LF | 545 | $15.00 | $9.00 | $30.00 | $25.00 | $35.44 |
| 41 | Mobilization (500-7001) | LS | 1 | $531,482 | $356,400 | $481,257 | $471,000 | $95,907 |
| 42 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $5,000.00 | $500.00 | $4,500.00 | $6,950.00 | $3,912.43 |
| 43 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $65.00 | $20,000 | $8,378.48 | $13,877 |
| 44 | TMA (stationary) (505-7001) | DAY | 360 | $100.00 | $30.00 | $10.00 | $30.79 | $199.48 |
| 45 | TMA (mobile operation) (505-7003) | DAY | 10 | $150.00 | $50.00 | $100.00 | $0.01 | $647.87 |
| 46 | Rock filter dams (install) (type 2) (506-7002) | LF | 392 | $65.00 | $100.00 | $63.50 | $63.50 | $75.74 |
| 47 | Rock filter dams (remove) (506-7011) | LF | 392 | $35.00 | $25.00 | $36.00 | $36.00 | $46.20 |
| 48 | Construction exits (install) (type 2) (506-7021) | SY | 224 | $19.00 | $30.00 | $40.00 | $36.35 | $30.07 |
| 49 | Construction exits (remove) (506-7024) | SY | 224 | $4.50 | $15.00 | $10.00 | $18.06 | $12.75 |
| 50 | FRNT end loader work (ersn & sedm cont) (506-7031) | HR | 32 | $175.00 | $200.00 | $150.00 | $93.76 | $161.31 |
| 51 | Temporary sediment control fence (install) (506-7039) | LF | 15,446 | $4.15 | $5.00 | $3.10 | $3.10 | $3.76 |
| 52 | Temporary sediment control fence (remove) (506-7041) | LF | 15,446 | $1.20 | $1.00 | $1.30 | $1.30 | $1.56 |
| 53 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 868 | $5.15 | $10.00 | $5.95 | $5.95 | $7.17 |
| 54 | Biodegradable erosion control logs (remove) (506-7046) | LF | 868 | $1.40 | $2.00 | $1.40 | $1.40 | $1.73 |
| 55 | Constructing detours (508-7001) | SY | 217 | $60.00 | $80.00 | $100.00 | $134.35 | $98.29 |
| 56 | Driveways (concrete) (530-7006) | SY | 66 | $100.00 | $90.00 | $175.00 | $122.54 | $161.89 |
| 57 | Driveways (ACP) (530-7010) | SY | 2,024 | $52.00 | $35.00 | $60.00 | $48.79 | $90.54 |
| 58 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 36,625 | $0.50 | $0.30 | $0.24 | $0.22 | $0.28 |
| 59 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 18,093 | $0.50 | $0.30 | $0.24 | $0.50 | $0.28 |
| 60 | Metal W-beam guard fence (timber post) (540-7001) | LF | 312.50 | $28.00 | $30.00 | $28.44 | $28.44 | $33.82 |
| 61 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,500.00 | $2,500.00 | $2,501.00 | $2,501.00 | $2,584.52 |
| 62 | Remove metal beam guard fence (542-7001) | LF | 402 | $2.75 | $9.00 | $5.00 | $5.00 | $3.47 |
| 63 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $215.00 | $1,500.00 | $350.00 | $350.00 | $271.75 |
| 64 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,400.00 | $3,525.00 | $3,525.00 | $3,525.00 | $4,024.22 |
| 65 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $320.00 | $1,475.00 | $350.00 | $350.00 | $381.61 |
| 66 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 400 | $16.00 | $9.00 | $9.92 | $8.50 | $12.56 |
| 67 | Electrical conductor (no.8) bare (620-7007) | LF | 400 | $2.10 | $2.00 | $2.45 | $2.10 | $2.24 |
| 68 | Electrical conductor (no.8) insulated (620-7008) | LF | 800 | $1.72 | $2.00 | $2.57 | $2.20 | $2.31 |
| 69 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $1,600.00 | $1,250.00 | $1,284.36 | $1,100.00 | $1,175.12 |
| 70 | Remove ground box (624-7013) | EACH | 2 | $500.00 | $435.00 | $437.85 | $375.00 | $370.05 |
| 71 | Aluminum signs (type A) (636-7001) | SF | 18 | $24.00 | $16.00 | $35.00 | $75.00 | $26.31 |
| 72 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 22 | $830.00 | $850.00 | $875.00 | $730.00 | $844.16 |
| 73 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 2 | $925.00 | $950.00 | $985.00 | $815.00 | $942.46 |
| 74 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 15 | $930.00 | $980.00 | $1,125.00 | $915.00 | $1,058.09 |
| 75 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,275.00 | $1,350.00 | $1,375.00 | $1,300.00 | $1,503.30 |
| 76 | Remove SM RD SN sup&AM (644-7073) | EACH | 38 | $85.00 | $285.00 | $95.00 | $127.27 | $115.64 |
| 77 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $32.00 | $225.00 | $26.00 | $24.50 | $28.33 |
| 78 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 12 | $35.00 | $260.00 | $55.00 | $30.50 | $35.27 |
| 79 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 6 | $90.00 | $215.00 | $85.00 | $69.00 | $79.79 |
| 80 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 1,195 | $1.50 | $1.00 | $1.10 | $1.10 | $1.27 |
| 81 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 46 | $15.00 | $50.00 | $50.00 | $50.00 | $57.82 |
| 82 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 17 | $275.00 | $150.00 | $150.00 | $150.00 | $173.46 |
| 83 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 37,917 | $1.10 | $0.40 | $0.38 | $0.38 | $0.44 |
| 84 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,936 | $1.30 | $6.00 | $1.84 | $1.25 | $0.77 |
| 85 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 104 | $8.00 | $16.00 | $16.00 | $16.00 | $18.50 |
| 86 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 37,992 | $0.90 | $0.65 | $0.66 | $0.66 | $0.76 |
| 87 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,288 | $0.55 | $1.00 | $1.10 | $1.10 | $1.27 |
| 88 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 8,118 | $1.00 | $0.85 | $0.84 | $0.84 | $0.97 |
| 89 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 352 | $4.75 | $7.50 | $7.50 | $7.50 | $8.67 |
| 90 | Eliminating existing PM & markers (4") (677-7001) | LF | 12,140 | $0.35 | $0.35 | $0.35 | $0.35 | $0.40 |
| 91 | PRSSR irrig PVC pipe (30") (1000-7003) | LF | 66 | $150.00 | $235.00 | $225.00 | $500.00 | $236.87 |
| 92 | PRSSR irrig PVC pipe (12") (1000-7004) | LF | 66 | $200.00 | $120.00 | $200.00 | $150.00 | $100.14 |
| 93 | PRSSR irrig PVC pipe (15") (1000-7005) | LF | 150 | $250.00 | $100.00 | $130.00 | $90.00 | $93.50 |
| 94 | Bonding course (3007-7001) | GAL | 4,656 | $3.50 | $8.00 | $4.00 | $2.87 | $8.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.