TxDOT contract A00195501 bid tabulation
Rehabilitate Existing Roadway, US 82 (Kemp Blvd to US 287 (Frontage roads only)). Let by Texas DOT on May 7, 2026, Wichita, Wichita Falls District. 5 bids received; low bid $3,670,513 by O. Trevino Construction, LLC, -8.2% against the engineer's estimate of $3,996,579.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 31
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $3,670,513 | Low | -8.0% |
| 2 | Overland Corporation | $3,934,949 | +7.0% | -2.0% |
| 3 | Austin Bridge & Road Services, LP | $4,178,600 | +14% | +5.0% |
| 4 | Jagoe-Public Company | $4,387,459 | +20% | +10% |
| 5 | A. L. Helmcamp, Inc. | $4,509,025 | +23% | +13% |
Engineer's estimate: $3,996,579.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Overland Corporation | 3. Austin Bridge & Road Services, LP | 4. Jagoe-Public Company | 5. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 77 | $9.00 | $29.00 | $10.00 | $63.38 | $155.00 | $60.00 |
| 2 | Removing concrete (curb & gutter) (104-7017) | LF | 97 | $15.00 | $33.00 | $7.00 | $33.88 | $50.00 | $40.00 |
| 3 | D-GR HMA type D sac-B PG76-22 (341-7058) | TON | 5,953 | $105.00 | $158.00 | $130.10 | $160.00 | $130.75 | $154.00 |
| 4 | Tom-F PG76-22 sac-B (347-7007) | TON | 4,449 | $100.00 | $170.00 | $190.50 | $245.00 | $195.00 | $244.00 |
| 5 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 56,903 | $2.25 | $4.32 | $3.90 | $2.00 | $5.50 | $4.20 |
| 6 | Full - depth repair CRCP (8") (361-7049) | SY | 1,400 | $205.00 | $143.00 | $163.00 | $142.65 | $180.00 | $174.00 |
| 7 | Full-depth repair CPCD (8") (361-7059) | SY | 7,300 | $230.00 | $123.50 | $143.00 | $132.90 | $150.00 | $164.00 |
| 8 | Riprap (concrete)(4 in) (432-7001) | CY | 29 | $500.00 | $870.00 | $750.00 | $460.46 | $700.00 | $820.00 |
| 9 | Adjusting manholes (479-7001) | EACH | 7 | $850.00 | $1,075.00 | $1,750.00 | $2,000.00 | $2,400.00 | $2,500.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $356,306 | $225,000 | $400,155 | $417,860 | $482,000 | $430,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,500 | $6,550.00 | $30,545 | $31,648 | $35,000 | $15,000 |
| 12 | TMA (stationary) (505-7001) | DAY | 124 | $260.00 | $175.00 | $5.00 | $1.00 | $550.00 | $200.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 8 | $275.00 | $825.00 | $5.00 | $1.00 | $275.00 | $600.00 |
| 14 | Concrete curb (type II) (529-7002) | LF | 306 | $35.00 | $29.00 | $50.00 | $29.45 | $130.00 | $82.00 |
| 15 | Concrete sidewalks (5") (531-7002) | SY | 354 | $78.00 | $137.00 | $90.00 | $134.28 | $110.00 | $120.00 |
| 16 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 3,086 | $1.25 | $1.05 | $0.84 | $0.50 | $2.17 | $1.00 |
| 17 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 3,868 | $1.00 | $0.62 | $0.59 | $0.59 | $0.66 | $0.63 |
| 18 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,250 | $0.85 | $0.80 | $0.84 | $0.84 | $0.93 | $0.82 |
| 19 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 2,738 | $3.25 | $3.15 | $2.90 | $2.90 | $3.22 | $3.15 |
| 20 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 12,752 | $0.60 | $0.55 | $0.51 | $0.51 | $0.57 | $0.56 |
| 21 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 33,658 | $0.60 | $0.50 | $0.51 | $0.51 | $0.57 | $0.51 |
| 22 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 35,882 | $0.60 | $0.50 | $0.51 | $0.51 | $0.57 | $0.51 |
| 23 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 37 | $4.75 | $4.25 | $4.00 | $4.00 | $4.44 | $4.20 |
| 24 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 938 | $12.25 | $13.65 | $11.59 | $1.59 | $12.87 | $13.65 |
| 25 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 65 | $200.00 | $210.00 | $200.00 | $200.00 | $222.14 | $210.00 |
| 26 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 14 | $225.00 | $250.00 | $270.00 | $270.00 | $299.89 | $252.00 |
| 27 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 866 | $3.75 | $3.75 | $4.00 | $4.00 | $4.44 | $3.80 |
| 28 | Vehicle LP detect (sawcut)(14 AWG)(BLK) (688-7005) | LF | 1,300 | $10.00 | $57.50 | $25.00 | $30.00 | $44.43 | $12.00 |
| 29 | Spot tree trimming / brush removal (752-7002) | LF | 1,450 | $120.00 | $11.50 | $11.00 | $15.00 | $12.22 | $9.00 |
| 30 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 1 | $30.00 | $1,600.00 | $1,500.00 | $1,500.00 | $1,666.05 | $2,000.00 |
| 31 | Bonding course (3007-7001) | GAL | 9,965 | $4.00 | $5.80 | $4.25 | $4.20 | $4.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.