TxDOT contract A00184443 bid tabulation
Intersection Improvement, SH 75 (0.5 miles north of FM 2296 to 0.5 miles south of FM 2296). Let by Texas DOT on May 7, 2026, Walker, Bryan District. 5 bids received; low bid $2,980,129 by Big Creek Construction, LTD., +13% against the engineer's estimate of $2,628,065.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 88
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $2,980,129 | Low | +13% |
| 2 | Larry Young Paving, Inc. | $3,123,380 | +5.0% | +19% |
| 3 | Knife River Corporation - South | $3,343,418 | +12% | +27% |
| 4 | Texas Materials Group, Inc. | $3,481,776 | +17% | +32% |
| 5 | A. L. Helmcamp, Inc. | $3,711,878 | +25% | +41% |
Engineer's estimate: $2,628,065.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Larry Young Paving, Inc. | 3. Knife River Corporation - South | 4. Texas Materials Group, Inc. | 5. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 48 | $1,000.00 | $1,500.00 | $1,600.00 | $1,660.00 | $1,550.00 | $3,000.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 53 | $18.00 | $25.00 | $22.00 | $23.50 | $29.00 | $21.00 |
| 3 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 189 | $15.00 | $28.00 | $10.00 | $14.00 | $26.00 | $20.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 4,374 | $15.00 | $16.00 | $21.00 | $12.50 | $20.00 | $10.00 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 2,056 | $25.00 | $16.00 | $14.00 | $25.00 | $19.00 | $30.00 |
| 6 | Backfill (type A or B) (134-7004) | STA | 46 | $150.00 | $260.00 | $250.00 | $171.00 | $629.00 | $425.00 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 10,398 | $1.50 | $0.75 | $1.00 | $0.50 | $1.80 | $0.65 |
| 8 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 10,898 | $0.25 | $0.38 | $0.50 | $0.45 | $0.41 | $0.40 |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 5,399 | $0.20 | $0.38 | $0.50 | $0.41 | $0.38 | $0.37 |
| 10 | Broadcast seed (temporary_cool) (164-7006) | SY | 5,399 | $0.20 | $0.38 | $0.50 | $0.41 | $0.38 | $0.37 |
| 11 | Vegetative watering (168-7001) | TGL | 317 | $9.55 | $32.00 | $40.00 | $28.50 | $21.00 | $5.00 |
| 12 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 7,715 | $14.00 | $20.00 | $23.00 | $18.59 | $27.00 | $22.00 |
| 13 | Cement (275-7001) | TON | 77 | $240.00 | $205.00 | $230.00 | $243.50 | $232.00 | $225.00 |
| 14 | Cement treat (subgrade) (8") (275-7017) | SY | 7,715 | $2.00 | $3.25 | $4.50 | $1.66 | $4.20 | $5.00 |
| 15 | Prime coat (MC-30) (310-7004) | GAL | 1,543 | $8.00 | $6.00 | $6.25 | $6.00 | $7.00 | $5.00 |
| 16 | SP mixes SP-B PG64-22 (344-7001) | TON | 1,532 | $100.00 | $115.00 | $140.00 | $144.00 | $151.00 | $170.00 |
| 17 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 2,767 | $110.00 | $135.00 | $160.00 | $163.50 | $157.00 | $185.00 |
| 18 | Tack coat (344-7077) | GAL | 2,012 | $4.00 | $4.00 | $5.75 | $4.00 | $4.50 | $5.00 |
| 19 | Plane & text asphalt concrete pavement(0.5") (354-7016) | SY | 12,031 | $1.50 | $2.50 | $2.00 | $1.46 | $2.00 | $1.30 |
| 20 | Planing asphalt concrete pavement (0" to 2-1/2") (354-7083) | SY | 1,814 | $1.50 | $3.50 | $6.25 | $5.90 | $15.75 | $4.25 |
| 21 | Cut & restoring pavement (400-7006) | SY | 13 | $85.00 | $350.00 | $120.00 | $211.00 | $698.00 | $189.00 |
| 22 | Cem stabil BKFL (400-7010) | CY | 5 | $160.00 | $400.00 | $120.00 | $176.00 | $206.50 | $158.00 |
| 23 | Temporary special shoring (403-7001) | SF | 4,002 | $20.00 | $40.00 | $45.00 | $52.30 | $53.00 | $32.00 |
| 24 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 160 | $300.00 | $225.00 | $250.00 | $232.00 | $212.00 | $207.00 |
| 25 | Retaining wall (spread footing) (423-7015) | SF | 3,675 | $107.00 | $135.00 | $140.00 | $125.00 | $168.00 | $193.00 |
| 26 | Riprap (concrete)(4 in) (432-7001) | CY | 313 | $600.00 | $685.00 | $350.00 | $822.50 | $715.00 | $735.00 |
| 27 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 9.60 | $600.00 | $1,000.00 | $960.00 | $823.00 | $710.00 | $735.00 |
| 28 | Riprap (mow strip)(4 in) (432-7013) | CY | 94 | $600.00 | $685.00 | $600.00 | $881.00 | $669.00 | $788.00 |
| 29 | Riprap (stone protection)(18 in) (432-7043) | CY | 9 | $200.00 | $400.00 | $210.00 | $235.00 | $421.00 | $210.00 |
| 30 | RC pipe (CL III)(18 in) (464-7003) | LF | 228 | $70.00 | $87.00 | $61.00 | $64.60 | $148.00 | $58.00 |
| 31 | RC pipe (CL III)(24 in) (464-7005) | LF | 26 | $100.00 | $109.00 | $92.00 | $117.50 | $217.00 | $105.00 |
| 32 | RC pipe (CL III)(30 in) (464-7007) | LF | 4 | $130.00 | $388.00 | $180.00 | $235.00 | $451.00 | $210.00 |
| 33 | RC pipe (CL IV)(18 in) (464-7019) | LF | 40 | $90.00 | $100.00 | $93.00 | $70.50 | $207.00 | $63.00 |
| 34 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 16 | $1,200.00 | $1,580.00 | $1,500.00 | $1,057.00 | $2,810.00 | $945.00 |
| 35 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 2 | $1,800.00 | $2,420.00 | $2,100.00 | $2,900.00 | $3,224.00 | $2,625.00 |
| 36 | Clean existing culverts (480-7001) | EACH | 2 | $3,000.00 | $2,200.00 | $4,600.00 | $1,410.00 | $3,705.00 | $1,260.00 |
| 37 | Removing structure (set) (496-7004) | EACH | 2 | $400.00 | $450.00 | $480.00 | $760.00 | $615.00 | $683.00 |
| 38 | Removing structure (wingwall) (496-7005) | EACH | 1 | $2,500.00 | $2,200.00 | $470.00 | $880.00 | $3,389.00 | $788.00 |
| 39 | Removing structure (pipe) (496-7007) | LF | 47 | $20.00 | $35.00 | $33.00 | $35.25 | $72.00 | $32.00 |
| 40 | Mobilization (500-7001) | LS | 1 | $243,500 | $240,000 | $292,000 | $243,000 | $266,774 | $350,000 |
| 41 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $3,000.00 | $5,000.00 | $5,000.00 | $11,500 | $846.00 | $10,000 |
| 42 | Portable changeable message sign (503-7002) | EACH | 7 | $7,500.00 | $9,300.00 | $4,300.00 | $9,445.00 | $9,458.00 | $13,500 |
| 43 | TMA (stationary) (505-7001) | DAY | 135 | $250.00 | $225.00 | $250.00 | $500.00 | $413.00 | $250.00 |
| 44 | TMA (mobile operation) (505-7003) | DAY | 18 | $250.00 | $400.00 | $850.00 | $1,000.00 | $413.00 | $600.00 |
| 45 | Rock filter dams (install) (type 2) (506-7002) | LF | 100 | $40.00 | $38.00 | $43.00 | $41.00 | $38.00 | $37.00 |
| 46 | Rock filter dams (remove) (506-7011) | LF | 100 | $12.00 | $11.00 | $12.00 | $11.75 | $10.75 | $10.00 |
| 47 | Temporary sediment control fence (install) (506-7039) | LF | 6,938 | $4.00 | $3.25 | $4.00 | $3.70 | $3.39 | $3.30 |
| 48 | Temporary sediment control fence (remove) (506-7041) | LF | 6,938 | $1.00 | $1.10 | $1.25 | $1.15 | $1.08 | $1.05 |
| 49 | Constructing detours (508-7001) | SY | 200 | $80.00 | $125.00 | $150.00 | $108.00 | $193.00 | $125.00 |
| 50 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 390 | $30.00 | $44.00 | $15.00 | $81.00 | $45.00 | $99.00 |
| 51 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 390 | $15.00 | $20.00 | $15.00 | $23.00 | $45.00 | $21.00 |
| 52 | Driveways (concrete) (530-7006) | SY | 39 | $110.00 | $155.00 | $120.00 | $250.00 | $123.00 | $210.00 |
| 53 | Driveways (ACP) (530-7010) | SY | 415 | $55.00 | $54.00 | $59.00 | $109.00 | $102.00 | $74.00 |
| 54 | Turnouts (ACP) (530-7018) | SY | 70 | $70.00 | $40.00 | $60.00 | $182.00 | $180.00 | $170.00 |
| 55 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 6,622 | $0.50 | $0.90 | $0.75 | $1.00 | $0.24 | $0.85 |
| 56 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 5,708 | $0.50 | $0.90 | $0.75 | $1.00 | $0.28 | $0.85 |
| 57 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,075 | $25.00 | $28.00 | $28.00 | $26.44 | $24.00 | $23.00 |
| 58 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,400.00 | $3,500.00 | $3,800.00 | $3,625.00 | $3,318.00 | $3,255.00 |
| 59 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $800.00 | $1,150.00 | $490.00 | $1,120.00 | $1,153.00 | $1,300.00 |
| 60 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $8,000.00 | $8,700.00 | $8,600.00 | $7,600.00 | $1,927.00 | $9,000.00 |
| 61 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 3 | $250.00 | $345.00 | $390.00 | $370.00 | $339.00 | $489.00 |
| 62 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 1 | $300.00 | $400.00 | $450.00 | $429.00 | $383.00 | $588.00 |
| 63 | In RD IL (U/P) (type 2) (150W EQ) LED (610-7016) | EACH | 6 | $1,250.00 | $2,000.00 | $1,386.00 | $1,269.00 | $1,240.00 | |
| 64 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 20 | $5,500.00 | $5,700.00 | $5,400.00 | $6,082.00 | $5,566.00 | $5,435.00 |
| 65 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,795 | $13.75 | $5.50 | $9.00 | $5.80 | $5.30 | $5.20 |
| 66 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 1,270 | $28.00 | $12.50 | $17.00 | $13.70 | $12.50 | $12.25 |
| 67 | Conduit (RM) (2") (618-7078) | LF | 180 | $38.00 | $24.00 | $41.00 | $37.00 | $37.00 | |
| 68 | Electrical conductor (no.8) insulated (620-7008) | LF | 20,810 | $3.00 | $1.50 | $1.50 | $1.69 | $1.54 | $1.50 |
| 69 | Ground box type D (162922)W/apron (624-7008) | EACH | 25 | $1,500.00 | $1,300.00 | $1,900.00 | $1,420.00 | $1,293.00 | $1,265.00 |
| 70 | Elc SRV type A 120/240 060(NS)SS(E)SP(U) (628-7010) | EACH | 3 | $7,950.00 | $6,600.00 | $8,515.00 | $7,791.00 | $7,610.00 | |
| 71 | Elc SRV type D 120/240 100(NS)SS(E)SP(O) (628-7248) | EACH | 1 | $8,500.00 | $8,950.00 | $7,400.00 | $9,564.00 | $8,754.00 | $8,550.00 |
| 72 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 13 | $750.00 | $500.00 | $560.00 | $535.00 | $489.00 | $795.00 |
| 73 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $800.00 | $850.00 | $970.00 | $923.00 | $844.00 | $1,170.00 |
| 74 | Remove SM RD SN sup&AM (644-7073) | EACH | 16 | $125.00 | $145.00 | $170.00 | $160.00 | $125.00 | $210.00 |
| 75 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 11 | $40.00 | $35.00 | $39.00 | $37.00 | $34.00 | $42.00 |
| 76 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 6 | $100.00 | $90.00 | $100.00 | $100.00 | $91.00 | $81.00 |
| 77 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 2 | $40.00 | $30.00 | $35.00 | $34.00 | $30.65 | $6.00 |
| 78 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 328 | $3.00 | $1.50 | $0.50 | $1.50 | $1.08 | $1.13 |
| 79 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,398 | $3.00 | $1.50 | $0.50 | $1.50 | $1.08 | $1.13 |
| 80 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 162 | $1.80 | $1.10 | $1.25 | $1.30 | $1.18 | $1.16 |
| 81 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 2,326 | $1.50 | $1.00 | $1.00 | $1.00 | $0.91 | $0.89 |
| 82 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 33 | $12.00 | $11.50 | $14.00 | $17.00 | $15.06 | $14.70 |
| 83 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 8,537 | $0.80 | $0.65 | $0.75 | $0.80 | $0.73 | $0.71 |
| 84 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 12,955 | $0.80 | $0.65 | $0.75 | $0.80 | $0.73 | $0.71 |
| 85 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 7 | $225.00 | $220.00 | $250.00 | $260.00 | $237.00 | $231.00 |
| 86 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 10 | $250.00 | $300.00 | $340.00 | $410.00 | $376.00 | $368.00 |
| 87 | Reflectorized pavement marker type I-C (672-7002) | EACH | 120 | $4.50 | $4.25 | $5.00 | $5.00 | $4.52 | $4.40 |
| 88 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 548 | $4.00 | $4.25 | $5.00 | $5.00 | $4.52 | $4.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.