Preventive Maintenance, IH 35 (FM 133 (NB/SBML) to 0.287 MI SOUTH OF FM 3408). Let by Texas DOT on May 7, 2026, La Salle, Laredo District. 4 bids received; low bid $24,814,865 by Hunter Industries, LTD., -10% against the engineer's estimate of $27,692,721.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 77
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $24,814,865 | Low | -10% |
| 2 | Texas Materials Group, Inc. | $25,131,233 | +1.0% | -9.0% |
| 3 | Anderson Columbia Co., Inc. | $25,689,921 | +4.0% | -7.0% |
| 4 | CK Newberry, LLC | $27,483,463 | +11% | -1.0% |
Engineer's estimate: $27,692,721.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. Texas Materials Group, Inc. | 3. Anderson Columbia Co., Inc. | 4. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7003) | SY | 89 | $16.45 | $40.00 | $50.00 | $50.00 | |
| 2 | Backfill (type A) (134-7001) | STA | 626 | $170.00 | $104.25 | $100.00 | $125.00 | $175.00 |
| 3 | Fog seal (CSS-1H) (315-7004) | GAL | 37,846 | $3.50 | $1.75 | $2.12 | $2.80 | $2.50 |
| 4 | D-GR HMA type-C sac-A PG76-22 (341-7031) | TON | 53,222 | $111.27 | $127.50 | $116.00 | $125.00 | |
| 5 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 27,114 | $145.00 | $144.22 | $152.00 | $160.00 | $150.00 |
| 6 | Tom-C PG76-22 sac-A (347-7001) | TON | 19,816 | $130.00 | $120.65 | $148.50 | $140.00 | $152.00 |
| 7 | Flexible pavement structure repair(5") (351-7004) | SY | 174,425.99 | $37.00 | $35.57 | $35.00 | $35.00 | $39.75 |
| 8 | Flexible pavement structure repair(8") (351-7007) | SY | 18,750.20 | $65.00 | $59.14 | $62.65 | $55.00 | $66.00 |
| 9 | Flexible pavement structure repair 2.5" (351-7031) | SY | 17,177.60 | $27.00 | $18.66 | $25.40 | $25.00 | $27.00 |
| 10 | Planing asphalt concrete pavement(0" to 1") (354-7031) | SY | 34,604 | $1.50 | $1.09 | $1.05 | $1.15 | $1.00 |
| 11 | Planing asphalt concrete pavement(1") (354-7050) | SY | 210,829 | $2.00 | $1.09 | $1.05 | $1.00 | $1.00 |
| 12 | Planing asphalt concrete pavement(2") (354-7051) | SY | 302,947 | $1.47 | $1.70 | $2.00 | $1.00 | |
| 13 | Planing asphalt concrete pavement (2.5") (354-7082) | SY | 108,816 | $2.75 | $1.80 | $2.60 | $3.25 | $3.00 |
| 14 | Planing asphalt concrete pavement (0" to 2-1/2") (354-7083) | SY | 5,823 | $1.47 | $2.60 | $3.25 | $3.00 | |
| 15 | Concrete pavement(transition slab) (6") (360-7029) | SY | 27 | $650.00 | $250.00 | $250.00 | $350.00 | |
| 16 | Riprap (mow strip)(4 in) (432-7013) | CY | 249 | $685.00 | $540.00 | $485.00 | $700.00 | $550.00 |
| 17 | Cleaning and sealing existing joints (438-7001) | LF | 4,129 | $55.00 | $34.00 | $32.00 | $33.00 | $32.00 |
| 18 | Retrofit rail (add HSS) (451-7052) | LF | 52 | $100.00 | $186.82 | $175.00 | $170.00 | $160.00 |
| 19 | Mobilization (500-7001) | LS | 1 | $2,501,237 | $1,653,505 | $920,000 | $1,185,000 | $1,750,000 |
| 20 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $5,000.00 | $6,782.37 | $6,900.00 | $2,000.00 | $5,000.00 |
| 21 | Portable changeable message sign (503-7002) | EACH | 4 | $10,500 | $2,814.50 | $2,500.00 | $18,000 | $5,000.00 |
| 22 | TMA (stationary) (505-7001) | DAY | 514 | $220.00 | $81.19 | $25.00 | $325.00 | $200.00 |
| 23 | TMA (mobile operation) (505-7002) | HR | 1,128 | $170.00 | $108.25 | $25.00 | $75.00 | $15.00 |
| 24 | One-way traffic control (flagger cont) (510-7001) | HR | 729 | $99.00 | $50.00 | $90.00 | $50.00 | |
| 25 | One-way traffic control (pilot car) (510-7002) | HR | 1,111 | $132.00 | $148.00 | $180.00 | $125.00 | |
| 26 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 235,793 | $0.17 | $0.21 | $0.11 | $0.16 | $0.11 |
| 27 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 42,458 | $0.28 | $0.18 | $0.16 | $0.20 | |
| 28 | Metal W-beam guard fence (timber post) (540-7001) | LF | 5,100 | $26.00 | $27.00 | $25.50 | $29.00 | $28.00 |
| 29 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 10 | $2,560.00 | $2,500.00 | $2,600.00 | $4,000.00 | $3,000.00 |
| 30 | Downstream anchor terminal section (540-7015) | EACH | 11 | $1,460.00 | $1,300.00 | $1,190.00 | $1,700.00 | $1,700.00 |
| 31 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 1 | $1,000.00 | $1,050.00 | $1,400.00 | $1,500.00 | |
| 32 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 4 | $800.00 | $950.00 | $980.00 | $1,000.00 | $1,000.00 |
| 33 | Remove metal beam guard fence (542-7001) | LF | 4,887.50 | $2.85 | $2.60 | $2.00 | $2.00 | $2.00 |
| 34 | Remove terminal anchor section (542-7002) | EACH | 9 | $280.00 | $200.00 | $200.00 | $215.00 | |
| 35 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $300.00 | $100.00 | $100.00 | $105.00 | |
| 36 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 1 | $300.00 | $250.00 | $320.00 | $315.00 | |
| 37 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,500.00 | $3,600.00 | $3,300.00 | $3,200.00 | $3,200.00 |
| 38 | Guardrail end treatment (remove) (544-7003) | EACH | 7 | $650.00 | $300.00 | $150.00 | $200.00 | $210.00 |
| 39 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 45 | $34.50 | $55.00 | $40.00 | $50.00 | $50.00 |
| 40 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 10 | $42.00 | $55.00 | $40.00 | $50.00 | $50.00 |
| 41 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 26,404 | $1.50 | $1.07 | $1.20 | $2.00 | $1.00 |
| 42 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 14,648 | $1.07 | $1.20 | $2.00 | $1.00 | |
| 43 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 24,175 | $1.00 | $0.82 | $0.82 | $0.86 | $0.85 |
| 44 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 2,425 | $1.80 | $1.20 | $1.20 | $1.25 | $1.20 |
| 45 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 654 | $8.00 | $8.00 | $8.50 | $8.00 | |
| 46 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 67 | $150.00 | $110.00 | $110.00 | $115.00 | $110.00 |
| 47 | Reflectorized pavement marking type I (W)(number)(100MIL) (666-7063) | EACH | 11 | $180.00 | $350.00 | $350.00 | $370.00 | $350.00 |
| 48 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 45 | $195.00 | $160.00 | $160.00 | $170.00 | $160.00 |
| 49 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 18 | $31.50 | $25.00 | $25.00 | $25.00 | $25.00 |
| 50 | Pavement sler 6" (666-7347) | LF | 177,868 | $0.28 | $0.28 | $0.28 | $0.30 | $0.30 |
| 51 | Pavement sler 8" (666-7348) | LF | 4,729 | $0.53 | $0.48 | $0.48 | $0.50 | $0.50 |
| 52 | Pavement sler 12" (666-7350) | LF | 790 | $0.85 | $0.88 | $0.88 | $0.92 | $0.90 |
| 53 | Pavement sler (arrow) (666-7353) | EACH | 21 | $26.00 | $15.00 | $15.00 | $16.00 | $15.00 |
| 54 | Pavement sler (word) (666-7354) | EACH | 13 | $28.80 | $25.00 | $25.00 | $26.00 | $25.00 |
| 55 | Pavement sler (number) (666-7367) | EACH | 2 | $27.50 | $50.00 | $50.00 | $52.00 | $50.00 |
| 56 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 45,265 | $0.75 | $0.65 | $0.65 | $0.68 | $0.65 |
| 57 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 353,847 | $0.65 | $0.44 | $0.44 | $0.46 | $0.45 |
| 58 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 24,351 | $0.74 | $0.74 | $0.78 | $0.75 | |
| 59 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 305,137 | $0.65 | $0.44 | $0.44 | $0.46 | $0.45 |
| 60 | Reflectorized pavement marker type I-C (672-7002) | EACH | 2,776 | $4.60 | $4.00 | $4.00 | $4.00 | $4.00 |
| 61 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,489 | $4.00 | $4.00 | $4.00 | $4.00 | |
| 62 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 938 | $4.50 | $7.50 | $7.50 | $8.00 | $7.50 |
| 63 | Eliminating existing PM & markers (4") (677-7001) | LF | 6,390 | $0.58 | $0.45 | $0.45 | $0.48 | $0.45 |
| 64 | Eliminating existing PM & markers (8") (677-7004) | LF | 3,140 | $0.90 | $0.60 | $0.60 | $0.64 | $0.60 |
| 65 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,140 | $1.20 | $0.75 | $0.75 | $0.78 | $0.75 |
| 66 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 3 | $62.00 | $65.00 | $65.00 | $70.00 | $65.00 |
| 67 | Eliminating existing PM & markers (number) (677-7014) | EACH | 1 | $30.00 | $95.00 | $95.00 | $100.00 | $95.00 |
| 68 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $30.00 | $65.00 | $65.00 | $70.00 | $65.00 |
| 69 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,990 | $0.20 | $0.05 | $0.05 | $0.05 | $0.05 |
| 70 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,585 | $0.26 | $0.10 | $0.10 | $0.10 | $0.10 |
| 71 | Pavement surface preparation for marking (12") (678-7006) | LF | 605 | $0.50 | $0.20 | $0.20 | $0.20 | $0.20 |
| 72 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 3 | $13.50 | $15.00 | $15.00 | $16.00 | $15.00 |
| 73 | Pavement surface preparation for marking (number) (678-7015) | EACH | 2 | $15.50 | $15.00 | $15.00 | $16.00 | $15.00 |
| 74 | Pavement surface preparation for marking (word) (678-7016) | EACH | 3 | $16.20 | $15.00 | $15.00 | $16.00 | $15.00 |
| 75 | Concrete rail repair (in-kind) (778-7001) | LF | 6 | $2,100.00 | $2,000.00 | $1,000.00 | $2,100.00 | |
| 76 | Bonding course (3007-7001) | GAL | 192,365 | $3.20 | $3.24 | $0.05 | $2.00 | $4.00 |
| 77 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $8,500.00 | $5,683.13 | $5,500.00 | $14,000 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.