TxDOT contract A00206487 bid tabulation
Hazard Elimination & Safety, FM 521 (FM 2540 to FM 457). Let by Texas DOT on May 7, 2026, Matagorda, Yoakum District. 5 bids received; low bid $5,637,915 by Matagorda Construction & Materials, +26% against the engineer's estimate of $4,482,046.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 101
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Matagorda Construction & Materials | $5,637,915 | Low | +26% |
| 2 | Hunter Industries, LTD. | $6,049,442 | +7.0% | +35% |
| 3 | Clark Construction of Texas, Inc. | $6,152,057 | +9.0% | +37% |
| 4 | STX Civil | $6,339,201 | +12% | +41% |
| 5 | E-Z Bel Construction, LLC | $7,094,599 | +26% | +58% |
Engineer's estimate: $4,482,046.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Matagorda Construction & Materials | 2. Hunter Industries, LTD. | 3. Clark Construction of Texas, Inc. | 4. STX Civil | 5. E-Z Bel Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 104 | $1,000.00 | $300.00 | $854.70 | $410.09 | $478.23 | $2,820.00 |
| 2 | Subgr widen (OC) (112-7001) | STA | 275.60 | $320.00 | $400.00 | $854.70 | $413.81 | $302.63 | $210.00 |
| 3 | Embankment (final)(OC)(type C) (132-7005) | CY | 2,205 | $24.00 | $23.00 | $19.80 | $18.98 | $35.49 | $20.00 |
| 4 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 387 | $30.00 | $26.00 | $24.20 | $22.43 | $45.07 | $20.00 |
| 5 | Blading (150-7002) | HR | 20 | $110.00 | $150.00 | $99.00 | $102.50 | $52.83 | $194.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 360 | $0.75 | $0.50 | $1.00 | $1.00 | $0.31 | $1.00 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 360 | $0.75 | $0.50 | $1.00 | $1.00 | $0.35 | $1.00 |
| 8 | Drill seed (permanent_rural_clay) (164-7010) | SY | 91,867 | $0.15 | $0.36 | $0.23 | $0.23 | $0.22 | $0.25 |
| 9 | Drill seed (temporary_warm) (164-7013) | SY | 22,967 | $0.20 | $0.36 | $0.19 | $0.19 | $0.22 | $0.25 |
| 10 | Drill seed (temporary_cool) (164-7014) | SY | 22,967 | $0.20 | $0.36 | $0.19 | $0.19 | $0.22 | $0.20 |
| 11 | Vegetative watering (168-7001) | TGL | 776.31 | $30.00 | $26.00 | $26.40 | $30.00 | $47.00 | $50.00 |
| 12 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 17,176 | $65.00 | $112.00 | $116.65 | $120.34 | $121.28 | $139.25 |
| 13 | Cement (275-7001) | TON | 1,222 | $180.00 | $175.00 | $209.00 | $201.38 | $221.08 | $255.00 |
| 14 | Cement TRT (existing material)(8") (275-7003) | SY | 60,351 | $2.00 | $4.30 | $1.87 | $2.89 | $3.87 | $2.10 |
| 15 | Asphalt (RC-250) (316-7016) | GAL | 8,396 | $5.00 | $4.80 | $4.84 | $10.26 | $6.04 | $6.50 |
| 16 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 300 | $160.00 | $170.00 | $116.88 | $216.33 | $183.44 | $245.00 |
| 17 | Aggregate (type-PE, GR-3)(sac-B) (316-7229) | CY | 566 | $140.00 | $156.00 | $155.27 | $188.34 | $182.04 | $205.00 |
| 18 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 861 | $140.00 | $138.00 | $155.34 | $186.14 | $217.08 | $200.00 |
| 19 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 57,294 | $4.00 | $4.50 | $4.40 | $5.18 | $5.22 | $5.50 |
| 20 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 4,292 | $99.00 | $198.00 | $129.80 | $168.10 | $168.67 | $175.00 |
| 21 | Tack coat (341-7082) | GAL | 6,895 | $5.50 | $4.85 | $3.63 | $4.47 | $5.44 | $4.50 |
| 22 | Flexible pavement structure repair(8") (351-7007) | SY | 1,000 | $69.00 | $53.00 | $68.73 | $91.92 | $57.67 | $67.00 |
| 23 | Planing asphalt concrete pavement(1") (354-7050) | SY | 5,842 | $1.00 | $1.85 | $1.65 | $2.43 | $3.47 | $1.50 |
| 24 | Cut & restoring pavement (400-7006) | SY | 181 | $185.00 | $119.00 | $210.00 | $227.20 | $243.25 | $225.00 |
| 25 | Cut and restore pavement (flex base) (400-7009) | SY | 39 | $100.00 | $33.00 | $84.00 | $111.57 | $234.69 | $91.00 |
| 26 | Cem stabil BKFL (400-7010) | CY | 305 | $160.00 | $64.00 | $194.25 | $185.00 | $156.85 | $325.00 |
| 27 | Trench excavation protection (402-7001) | LF | 220 | $60.00 | $1.00 | $10.50 | $10.00 | $4.50 | $21.00 |
| 28 | Temporary special shoring (403-7001) | SF | 1,882 | $18.00 | $5.00 | $26.25 | $25.00 | $14.84 | $28.00 |
| 29 | Riprap (concrete)(5 in) (432-7002) | CY | 18 | $350.00 | $800.00 | $840.00 | $800.00 | $554.40 | $425.00 |
| 30 | Riprap (stone protection)(12 in) (432-7041) | CY | 26 | $275.00 | $161.00 | $168.08 | $150.00 | $282.44 | $285.00 |
| 31 | Retrofit rail (type T131RC) (451-7049) | LF | 680 | $200.00 | $245.00 | $262.14 | $235.30 | $176.56 | $257.00 |
| 32 | CMP (gal steel 24 in) (460-7005) | LF | 24 | $162.00 | $78.00 | $105.00 | $100.00 | $85.47 | $28.00 |
| 33 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 54 | $650.00 | $720.00 | $735.00 | $700.00 | $661.40 | $700.00 |
| 34 | Concrete box culvert (8 FT X 3 FT) (462-7020) | LF | 60 | $700.00 | $835.00 | $840.00 | $800.00 | $873.84 | $850.00 |
| 35 | Concrete box culvert (9 FT X 4 FT) (462-7026) | LF | 106 | $800.00 | $1,000.00 | $945.00 | $900.00 | $1,300.52 | $1,200.00 |
| 36 | RC pipe (CL III)(15 in) (464-7002) | LF | 128 | $90.00 | $53.00 | $56.70 | $54.00 | $94.29 | $92.00 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 40 | $80.00 | $62.00 | $60.90 | $58.00 | $107.43 | $255.00 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 292 | $115.00 | $139.00 | $131.25 | $125.00 | $125.80 | $160.00 |
| 39 | RC pipe (CL III)(27 in) (464-7006) | LF | 16 | $120.00 | $161.00 | $157.50 | $150.00 | $150.22 | $310.00 |
| 40 | RC pipe (CL III)(30 in) (464-7007) | LF | 140 | $160.00 | $193.00 | $210.00 | $200.00 | $164.55 | $145.00 |
| 41 | RC pipe (CL III)(36 in) (464-7009) | LF | 76 | $200.00 | $284.00 | $278.25 | $265.00 | $174.42 | $168.00 |
| 42 | Set (type I) (36 in) (3: 1) (C) (467-7017) | EACH | 2 | $8,000.00 | $7,000.00 | $8,925.02 | $8,500.00 | $14,950 | $6,500.00 |
| 43 | Set (type I)(S= 6 FT)(HW= 4 FT)(3:1)(C) (467-7128) | EACH | 2 | $10,000 | $9,000.00 | $12,600 | $12,000 | $12,796 | $6,500.00 |
| 44 | Set (type I)(S= 8 FT)(HW= 4 FT)(4:1)(C) (467-7180) | EACH | 2 | $12,000 | $13,000 | $18,900 | $18,000 | $14,599 | $11,000 |
| 45 | Set (type I)(S= 9 FT)(HW= 5 FT)(3:1)(C) (467-7205) | EACH | 4 | $14,000 | $18,000 | $23,100 | $22,000 | $20,494 | $13,100 |
| 46 | Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300) | EACH | 16 | $1,200.00 | $850.00 | $840.00 | $800.00 | $1,490.32 | $1,100.00 |
| 47 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 10 | $1,300.00 | $1,000.00 | $997.50 | $950.00 | $1,939.32 | $1,525.00 |
| 48 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 4 | $1,000.00 | $1,000.00 | $997.50 | $950.00 | $1,468.25 | $850.00 |
| 49 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 6 | $2,500.00 | $2,100.00 | $2,625.01 | $2,500.00 | $1,911.21 | $850.00 |
| 50 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 6 | $1,600.00 | $2,100.00 | $2,100.01 | $2,000.00 | $1,995.54 | $850.00 |
| 51 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 4 | $1,800.00 | $1,900.00 | $2,362.51 | $2,250.00 | $2,209.43 | $1,250.00 |
| 52 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 34 | $1,700.00 | $2,100.00 | $2,625.01 | $2,500.00 | $2,368.88 | $1,425.00 |
| 53 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 2 | $2,200.00 | $2,100.00 | $2,625.01 | $2,500.00 | $1,977.39 | $1,050.00 |
| 54 | Set (type II) (27 in) (RCP) (6: 1) (P) (467-7340) | EACH | 4 | $2,600.00 | $3,200.00 | $3,150.01 | $3,000.00 | $1,933.81 | $2,900.00 |
| 55 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 2 | $3,000.00 | $3,200.00 | $3,150.01 | $3,000.00 | $3,289.27 | $2,150.00 |
| 56 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 8 | $2,500.00 | $3,700.00 | $3,360.01 | $3,200.00 | $3,379.43 | $3,000.00 |
| 57 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 8 | $3,000.00 | $3,500.00 | $3,675.01 | $3,500.00 | $4,335.98 | $3,850.00 |
| 58 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 6 | $3,000.00 | $4,500.00 | $4,725.01 | $4,500.00 | $4,785.98 | $4,400.00 |
| 59 | Set (type II) (15 in) (TP) (6:1) (P) (467-7486) | EACH | 4 | $1,400.00 | $950.00 | $945.00 | $900.00 | $1,473.87 | $800.00 |
| 60 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 16 | $20.00 | $44.00 | $57.75 | $55.00 | $75.15 | $68.00 |
| 61 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 8 | $50.00 | $90.00 | $105.00 | $100.00 | $90.24 | $100.00 |
| 62 | Thermoplastic pipe (PP) (15") (468-7015) | LF | 16 | $40.00 | $60.00 | $52.50 | $50.00 | $73.72 | $52.00 |
| 63 | Removing structure (small) (496-7036) | EACH | 11 | $1,000.00 | $550.00 | $577.50 | $550.00 | $602.81 | $775.00 |
| 64 | Mobilization (500-7001) | LS | 1 | $400,000 | $25,000 | $497,053 | $294,500 | $473,417 | $680,000 |
| 65 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $3,225.00 | $10,000 | $4,615.79 | $5,009.75 | $3,632.54 | $2,500.00 |
| 66 | Portable changeable message sign (503-7002) | EACH | 2 | $5,000.00 | $9,000.00 | $5,173.64 | $7,500.00 | $6,797.02 | $28,856 |
| 67 | TMA (stationary) (505-7001) | DAY | 20 | $250.00 | $300.00 | $310.42 | $265.00 | $167.64 | $325.00 |
| 68 | TMA (mobile operation) (505-7003) | DAY | 20 | $300.00 | $1,500.00 | $517.36 | $500.00 | $54.67 | $550.00 |
| 69 | Rock filter dams (install) (type 1) (506-7001) | LF | 170 | $50.00 | $32.00 | $42.00 | $42.00 | $40.72 | $42.00 |
| 70 | Rock filter dams (remove) (506-7011) | LF | 170 | $20.00 | $7.00 | $20.00 | $20.00 | $19.02 | $20.00 |
| 71 | Temporary sediment control fence (install) (506-7039) | LF | 1,380 | $4.50 | $3.50 | $5.00 | $5.00 | $5.40 | $5.00 |
| 72 | Temporary sediment control fence (remove) (506-7041) | LF | 1,380 | $1.50 | $1.50 | $1.00 | $1.00 | $1.14 | $1.00 |
| 73 | Driveways (ACP) (530-7010) | SY | 27 | $60.00 | $100.00 | $39.60 | $72.78 | $200.09 | $423.00 |
| 74 | Driveways (surface treat) (530-7016) | SY | 1,766 | $22.00 | $16.00 | $30.80 | $47.91 | $13.97 | $34.00 |
| 75 | Turnouts (surface treat) (530-7019) | SY | 79 | $40.00 | $16.00 | $30.80 | $102.81 | $76.67 | $124.00 |
| 76 | Metal W-beam guard fence (timber post) (540-7001) | LF | 900 | $36.00 | $28.00 | $31.46 | $29.65 | $32.39 | $26.00 |
| 77 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $1,850.00 | $2,250.00 | $2,758.62 | $2,100.00 | $3,596.10 | $2,124.00 |
| 78 | Short radius (28") (540-7013) | LF | 12.50 | $40.00 | $40.00 | $44.99 | $42.40 | $83.00 | $44.00 |
| 79 | Driveway terminal anchor section (540-7014) | EACH | 1 | $1,100.00 | $1,350.00 | $1,352.79 | $1,275.00 | $2,634.02 | $1,508.00 |
| 80 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,000.00 | $3,700.00 | $3,787.80 | $3,570.00 | $3,654.23 | $3,992.00 |
| 81 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $30,000 | $20,000 | $32,923 | $31,030 | $30,913 | $37,160 |
| 82 | Remove and install existing gate (550-7017) | EACH | 2 | $2,000.00 | $2,000.00 | $1,092.84 | $1,030.00 | $1,003.02 | $3,500.00 |
| 83 | Wire fence (type A) (552-7001) | LF | 140 | $25.00 | $10.00 | $30.82 | $29.05 | $25.02 | $25.00 |
| 84 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 8 | $250.00 | $350.00 | $190.98 | $150.00 | $465.43 | $400.00 |
| 85 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $1,000.00 | $1,200.00 | $949.60 | $775.00 | $936.60 | $850.00 |
| 86 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,000.00 | $1,200.00 | $1,241.38 | $1,100.00 | $1,213.79 | $850.00 |
| 87 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 30 | $500.00 | $635.00 | $578.25 | $525.00 | $338.24 | $438.00 |
| 88 | Remove SM RD SN sup&AM (644-7073) | EACH | 32 | $100.00 | $100.00 | $116.71 | $100.00 | $131.11 | $90.00 |
| 89 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 16 | $25.00 | $160.00 | $37.14 | $20.00 | $20.50 | $23.00 |
| 90 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 26 | $30.00 | $20.00 | $43.50 | $30.00 | $25.15 | $33.00 |
| 91 | Remove delin & object marker assms (658-7078) | EACH | 24 | $30.00 | $20.00 | $19.63 | $15.00 | $7.34 | $17.00 |
| 92 | Install object marker assembly (OM-2Z)(yflx)GNDHH(BI) (658-7255) | EACH | 24 | $120.00 | $75.00 | $76.39 | $70.00 | $93.05 | $79.00 |
| 93 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 172,540 | $0.25 | $0.27 | $0.25 | $0.25 | $0.31 | $0.25 |
| 94 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 20,092 | $0.25 | $0.40 | $0.25 | $0.25 | $0.31 | $0.25 |
| 95 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 25,200 | $0.25 | $0.40 | $0.25 | $0.25 | $0.31 | $0.25 |
| 96 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 7,291 | $2.00 | $1.60 | $1.72 | $2.00 | $0.29 | $1.50 |
| 97 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 58,860 | $0.60 | $1.05 | $0.90 | $1.10 | $0.83 | $0.90 |
| 98 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 8,180 | $0.60 | $1.05 | $0.90 | $1.10 | $0.83 | $0.90 |
| 99 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 6,473 | $0.60 | $1.05 | $0.90 | $1.10 | $0.84 | $1.00 |
| 100 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 779 | $17.00 | $23.00 | $12.00 | $15.00 | $17.45 | $12.00 |
| 101 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 426 | $6.00 | $8.00 | $5.25 | $5.00 | $6.98 | $5.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.