TxDOT contract A00196770 bid tabulation
Hazard Elimination & Safety, US 90 (FM 1680 to Fayette C/L). Let by Texas DOT on April 4, 2025, Gonzales, Yoakum District. 7 bids received; low bid $5,381,996 by STX Civil, -1.6% against the engineer's estimate of $5,467,251.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 71
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | STX Civil | $5,381,996 | Low | -2.0% |
| 2 | Hunter Industries, LTD. | $5,691,555 | +6.0% | +4.0% |
| 3 | Bear Creek Contracting, LLC | $5,920,716 | +10% | +8.0% |
| 4 | MB Western Industrial Contracting Co. | $6,278,626 | +17% | +15% |
| 5 | Acme Bridge Company, Inc. | $6,434,579 | +20% | +18% |
| 6 | Icos Management, LLC | $6,565,010 | +22% | +20% |
| 7 | Scout 5 Construction LLC | $6,629,041 | +23% | +21% |
Engineer's estimate: $5,467,251.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. STX Civil | 2. Hunter Industries, LTD. | 3. Bear Creek Contracting, LLC | 4. MB Western Industrial Contracting Co. | 5. Acme Bridge Company, Inc. | 6. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 10 | $8,500.00 | $2,200.00 | $3,815.60 | $2,327.00 | $5,000.00 | $8,150.00 | $4,400.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 23 | $10.90 | $10.00 | $31.50 | $318.00 | $51.00 | $75.40 | $220.00 |
| 3 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 829 | $28.00 | $20.00 | $70.40 | $20.00 | $68.00 | $94.20 | $55.00 |
| 4 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 572 | $200.00 | $78.00 | $126.24 | $104.00 | $140.00 | $175.00 | $88.00 |
| 5 | D-GR HMA type-B PG64-22 (341-7001) | TON | 1,240 | $200.00 | $184.00 | $173.80 | $207.00 | $160.00 | $165.00 | $308.00 |
| 6 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 310 | $210.00 | $262.00 | $173.80 | $295.00 | $140.00 | $175.00 | $440.00 |
| 7 | Tack coat (341-7082) | GAL | 281 | $7.50 | $6.30 | $5.12 | $7.00 | $10.00 | $3.20 | $44.00 |
| 8 | Flexible pavement structure repair(10") (351-7009) | SY | 1,340 | $125.00 | $69.00 | $129.65 | $77.00 | $95.00 | $200.00 | $308.00 |
| 9 | Cut & restore asphalt paving (400-7008) | SY | 573 | $75.00 | $170.00 | $183.60 | $382.00 | $138.00 | $198.00 | $330.00 |
| 10 | Cem stabil BKFL (400-7010) | CY | 1,015 | $200.00 | $160.00 | $172.80 | $230.00 | $283.00 | $186.00 | $242.00 |
| 11 | Trench excavation protection (402-7001) | LF | 367 | $10.00 | $5.00 | $5.40 | $11.00 | $57.00 | $5.80 | $22.00 |
| 12 | Temporary special shoring (403-7001) | SF | 5,135 | $55.00 | $2.00 | $10.80 | $21.00 | $23.00 | $11.70 | $11.00 |
| 13 | Riprap (concrete)(5 in) (432-7002) | CY | 91 | $650.00 | $550.00 | $594.00 | $476.00 | $771.00 | $641.00 | $880.00 |
| 14 | Riprap (stone protection)(12 in) (432-7041) | CY | 145 | $220.00 | $130.00 | $170.56 | $277.00 | $250.00 | $334.00 | $330.00 |
| 15 | Retrofit rail (type C1W) (451-7030) | LF | 1,730 | $125.00 | $320.00 | $300.18 | $308.00 | $284.00 | $340.00 | $275.00 |
| 16 | Retrofit rail (type T131RC) (451-7049) | LF | 2,000 | $100.00 | $315.00 | $238.80 | $273.00 | $255.00 | $205.00 | $308.00 |
| 17 | CMP (gal steel 18 in) (460-7003) | LF | 6 | $110.00 | $85.00 | $91.80 | $299.00 | $108.00 | $99.10 | $440.00 |
| 18 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 189 | $400.00 | $335.00 | $361.80 | $389.00 | $670.00 | $390.00 | $1,210.00 |
| 19 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 68 | $475.00 | $365.00 | $394.20 | $402.00 | $670.00 | $425.00 | $1,320.00 |
| 20 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 89 | $525.00 | $410.00 | $442.80 | $438.00 | $730.00 | $478.00 | $1,320.00 |
| 21 | Concrete box culvert (6 FT X 5 FT) (462-7013) | LF | 110 | $850.00 | $700.00 | $755.99 | $849.00 | $1,167.00 | $816.00 | $1,430.00 |
| 22 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 83 | $1,200.00 | $1,150.00 | $1,241.99 | $1,080.00 | $1,500.00 | $1,340.00 | $1,540.00 |
| 23 | Concrete box culvert (8 FT X 8 FT) (462-7025) | LF | 74 | $1,750.00 | $1,360.00 | $1,468.79 | $1,425.00 | $1,750.00 | $1,590.00 | $1,540.00 |
| 24 | Concrete box culvert (10 FT X 7 FT) (462-7035) | LF | 292 | $1,875.00 | $1,475.00 | $1,592.99 | $1,524.00 | $1,540.00 | $1,720.00 | $1,540.00 |
| 25 | Concrete box culvert (12 FT X 5 FT) (462-7048) | LF | 316 | $1,900.00 | $1,730.00 | $1,868.39 | $1,812.00 | $1,900.00 | $2,020.00 | $1,760.00 |
| 26 | RC pipe (CL III)(18 in) (464-7003) | LF | 2 | $100.00 | $85.00 | $86.40 | $355.00 | $195.00 | $93.30 | $440.00 |
| 27 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 2 | $10,750 | $15,000 | $16,200 | $9,085.00 | $18,000 | $17,500 | $16,500 |
| 28 | Wingwall (FW - 0) (HW=8 FT) (466-7150) | EACH | 2 | $18,000 | $18,000 | $19,440 | $11,502 | $24,000 | $21,000 | $17,600 |
| 29 | Wingwall (FW - S) (HW=6 FT) (466-7162) | EACH | 2 | $21,000 | $26,000 | $28,080 | $9,590.00 | $53,000 | $30,300 | $17,600 |
| 30 | Set (type I)(S= 3 FT)(HW= 2 FT)(4:1)(C) (467-7037) | EACH | 6 | $5,500.00 | $10,000 | $10,800 | $10,497 | $12,000 | $11,700 | $8,800.00 |
| 31 | Set (type I)(S= 4 FT)(HW= 2 FT)(6:1)(P) (467-7066) | EACH | 2 | $6,500.00 | $12,000 | $12,960 | $10,313 | $11,000 | $14,000 | $13,200 |
| 32 | Set (type I)(S= 4 FT)(HW= 3 FT)(4:1)(C) (467-7068) | EACH | 4 | $8,000.00 | $13,500 | $14,580 | $12,437 | $14,000 | $15,700 | $13,200 |
| 33 | Set (type I)(S= 8 FT)(HW= 6 FT)(3:1)(C) (467-7187) | EACH | 2 | $17,250 | $18,000 | $19,440 | $17,482 | $25,000 | $21,000 | $16,500 |
| 34 | Set (type I)(S= 8 FT)(HW= 9 FT)(3:1)(C) (467-7196) | EACH | 2 | $23,000 | $30,000 | $32,400 | $25,978 | $37,000 | $35,000 | $19,800 |
| 35 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 14 | $1,400.00 | $1,350.00 | $1,457.99 | $2,053.00 | $1,300.00 | $1,570.00 | $2,750.00 |
| 36 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | $2,500.00 | $2,200.00 | $2,375.98 | $1,792.00 | $1,850.00 | $2,560.00 | $3,300.00 |
| 37 | Clean existing culverts (480-7001) | EACH | 11 | $1,000.00 | $2,300.00 | $2,483.98 | $1,223.00 | $3,200.00 | $2,680.00 | $8,800.00 |
| 38 | Removing structure (box culvert) (496-7001) | EACH | 10 | $11,950 | $10,000 | $10,800 | $1,910.00 | $5,400.00 | $11,700 | $5,500.00 |
| 39 | Mobilization (500-7001) | LS | 1 | $485,000 | $450,000 | $436,136 | $516,534 | $425,000 | $600,000 | $100,000 |
| 40 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $8,000.00 | $2,000.00 | $7,379.93 | $3,035.00 | $5,000.00 | $10,000 | $1.00 |
| 41 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $3,500.00 | $7,500.00 | $5,832.00 | $5,000.00 | $17,000 | $11,000 |
| 42 | TMA (stationary) (505-7001) | DAY | 190 | $400.00 | $5.00 | $125.00 | $275.00 | $275.00 | $391.00 | $275.00 |
| 43 | TMA (mobile operation) (505-7003) | DAY | 34 | $400.00 | $10.00 | $350.00 | $315.00 | $275.00 | $898.00 | $440.00 |
| 44 | Rock filter dams (install) (type 1) (506-7001) | LF | 380 | $50.00 | $40.00 | $48.00 | $58.00 | $52.00 | $49.50 | $10.00 |
| 45 | Rock filter dams (remove) (506-7011) | LF | 380 | $20.00 | $5.00 | $18.00 | $7.00 | $14.00 | $12.50 | $5.00 |
| 46 | Temporary sediment control fence (install) (506-7039) | LF | 4,110 | $5.50 | $3.00 | $4.20 | $5.00 | $6.00 | $5.30 | $2.00 |
| 47 | Temporary sediment control fence (remove) (506-7041) | LF | 4,110 | $2.00 | $1.00 | $1.08 | $3.00 | $2.00 | $0.53 | $1.00 |
| 48 | One-way traffic control (port traffic signal) (510-7003) | MO | 12 | $6,000.00 | $4,000.00 | $11,000 | $2,291.00 | $6,500.00 | $3,240.00 | $1.00 |
| 49 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 2,160 | $54.00 | $85.00 | $40.00 | $93.00 | $90.00 | $97.20 | $105.00 |
| 50 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 9,270 | $12.00 | $14.00 | $15.00 | $18.00 | $23.00 | $18.50 | $22.00 |
| 51 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 2,160 | $18.00 | $15.00 | $15.00 | $17.00 | $23.00 | $35.60 | $33.00 |
| 52 | Metal W-beam guard fence (timber post) (540-7001) | LF | 4,375 | $30.25 | $27.00 | $29.90 | $27.00 | $26.00 | $25.50 | $24.00 |
| 53 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 20 | $2,900.00 | $2,185.00 | $2,799.14 | $2,188.00 | $2,100.00 | $2,650.00 | $2,750.00 |
| 54 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 275 | $95.00 | $115.00 | $105.50 | $127.00 | $115.00 | $82.80 | $132.00 |
| 55 | Metal beam guard fence (long span system) (540-7027) | EACH | 2 | $1,200.00 | $1,525.00 | $1,378.37 | $1,527.00 | $1,500.00 | $1,430.00 | $1,650.00 |
| 56 | Remove metal beam guard fence (542-7001) | LF | 4,739 | $3.50 | $1.00 | $2.12 | $4.00 | $3.00 | $2.65 | $2.00 |
| 57 | Remove terminal anchor section (542-7002) | EACH | 18 | $200.00 | $300.00 | $227.96 | $325.00 | $245.00 | $265.00 | $550.00 |
| 58 | Guardrail end treatment (install) (544-7001) | EACH | 32 | $3,250.00 | $3,500.00 | $3,583.75 | $3,956.00 | $3,900.00 | $3,290.00 | $3,740.00 |
| 59 | Guardrail end treatment (remove) (544-7003) | EACH | 10 | $360.00 | $300.00 | $344.59 | $325.00 | $311.00 | $265.00 | $550.00 |
| 60 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 34 | $1,640.00 | $1,300.00 | $1,484.39 | $1,005.00 | $965.00 | $1,530.00 | $2,200.00 |
| 61 | Crash cushion attenuator (remove) (545-7004) | EACH | 8 | $1,000.00 | $1,000.00 | $848.22 | $886.00 | $850.00 | $1,090.00 | $5,500.00 |
| 62 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 8 | $9,500.00 | $7,700.00 | $8,227.78 | $9,750.00 | $8,900.00 | $7,590.00 | $11,000 |
| 63 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 1 | $275.00 | $170.00 | $185.58 | $200.00 | $200.00 | $421.00 | $1,100.00 |
| 64 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 122 | $50.00 | $60.00 | $31.81 | $30.00 | $35.00 | $25.20 | $55.00 |
| 65 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 19,205 | $1.10 | $1.12 | $1.78 | $2.00 | $3.00 | $1.35 | $2.00 |
| 66 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 308 | $12.25 | $18.88 | $21.35 | $19.00 | $12.00 | $15.90 | $2.00 |
| 67 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 16,430 | $1.25 | $1.12 | $1.78 | $2.00 | $3.00 | $1.35 | $2.00 |
| 68 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 13,493 | $0.95 | $3.01 | $2.06 | $7.00 | $5.00 | $1.55 | $2.00 |
| 69 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 3,919 | $0.95 | $3.01 | $2.42 | $8.00 | $6.00 | $1.80 | $2.00 |
| 70 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 172 | $4.50 | $14.16 | $11.39 | $31.00 | $8.00 | $8.50 | $22.00 |
| 71 | Eliminating existing PM & markers (4") (677-7001) | LF | 3,919 | $1.25 | $7.67 | $2.14 | $5.00 | $9.00 | $1.60 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.