TxDOT contract A00196770 bid tabulation

Hazard Elimination & Safety, US 90 (FM 1680 to Fayette C/L). Let by Texas DOT on April 4, 2025, Gonzales, Yoakum District. 7 bids received; low bid $5,381,996 by STX Civil, -1.6% against the engineer's estimate of $5,467,251.

Owner
Texas DOT
Letting
04 APR 2025
Pay items
71
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1STX Civil$5,381,996Low-2.0%
2Hunter Industries, LTD.$5,691,555+6.0%+4.0%
3Bear Creek Contracting, LLC$5,920,716+10%+8.0%
4MB Western Industrial Contracting Co.$6,278,626+17%+15%
5Acme Bridge Company, Inc.$6,434,579+20%+18%
6Icos Management, LLC$6,565,010+22%+20%
7Scout 5 Construction LLC$6,629,041+23%+21%
TxDOT contract A00196770: bids by rank

Engineer's estimate: $5,467,251.

Bid tabulation

LinePay itemUnitQuantityEstimate1. STX Civil2. Hunter Industries, LTD.3. Bear Creek Contracting, LLC4. MB Western Industrial Contracting Co.5. Acme Bridge Company, Inc.6. Icos Management, LLC
1Preparing row (100-7002)STA10$8,500.00$2,200.00$3,815.60$2,327.00$5,000.00$8,150.00$4,400.00
2Removing concrete (riprap) (104-7006)SY23$10.90$10.00$31.50$318.00$51.00$75.40$220.00
3Embankment (vehicle)(OC)(type C) (132-7017)CY829$28.00$20.00$70.40$20.00$68.00$94.20$55.00
4FL BS (compacted in place)(type E GR 5)(final pos) (247-7196)CY572$200.00$78.00$126.24$104.00$140.00$175.00$88.00
5D-GR HMA type-B PG64-22 (341-7001)TON1,240$200.00$184.00$173.80$207.00$160.00$165.00$308.00
6D-GR HMA type D sac-B PG70-22 (341-7050)TON310$210.00$262.00$173.80$295.00$140.00$175.00$440.00
7Tack coat (341-7082)GAL281$7.50$6.30$5.12$7.00$10.00$3.20$44.00
8Flexible pavement structure repair(10") (351-7009)SY1,340$125.00$69.00$129.65$77.00$95.00$200.00$308.00
9Cut & restore asphalt paving (400-7008)SY573$75.00$170.00$183.60$382.00$138.00$198.00$330.00
10Cem stabil BKFL (400-7010)CY1,015$200.00$160.00$172.80$230.00$283.00$186.00$242.00
11Trench excavation protection (402-7001)LF367$10.00$5.00$5.40$11.00$57.00$5.80$22.00
12Temporary special shoring (403-7001)SF5,135$55.00$2.00$10.80$21.00$23.00$11.70$11.00
13Riprap (concrete)(5 in) (432-7002)CY91$650.00$550.00$594.00$476.00$771.00$641.00$880.00
14Riprap (stone protection)(12 in) (432-7041)CY145$220.00$130.00$170.56$277.00$250.00$334.00$330.00
15Retrofit rail (type C1W) (451-7030)LF1,730$125.00$320.00$300.18$308.00$284.00$340.00$275.00
16Retrofit rail (type T131RC) (451-7049)LF2,000$100.00$315.00$238.80$273.00$255.00$205.00$308.00
17CMP (gal steel 18 in) (460-7003)LF6$110.00$85.00$91.80$299.00$108.00$99.10$440.00
18Concrete box culvert (3 FT X 2 FT) (462-7001)LF189$400.00$335.00$361.80$389.00$670.00$390.00$1,210.00
19Concrete box culvert (4 FT X 2 FT) (462-7003)LF68$475.00$365.00$394.20$402.00$670.00$425.00$1,320.00
20Concrete box culvert (4 FT X 3 FT) (462-7004)LF89$525.00$410.00$442.80$438.00$730.00$478.00$1,320.00
21Concrete box culvert (6 FT X 5 FT) (462-7013)LF110$850.00$700.00$755.99$849.00$1,167.00$816.00$1,430.00
22Concrete box culvert (8 FT X 5 FT) (462-7022)LF83$1,200.00$1,150.00$1,241.99$1,080.00$1,500.00$1,340.00$1,540.00
23Concrete box culvert (8 FT X 8 FT) (462-7025)LF74$1,750.00$1,360.00$1,468.79$1,425.00$1,750.00$1,590.00$1,540.00
24Concrete box culvert (10 FT X 7 FT) (462-7035)LF292$1,875.00$1,475.00$1,592.99$1,524.00$1,540.00$1,720.00$1,540.00
25Concrete box culvert (12 FT X 5 FT) (462-7048)LF316$1,900.00$1,730.00$1,868.39$1,812.00$1,900.00$2,020.00$1,760.00
26RC pipe (CL III)(18 in) (464-7003)LF2$100.00$85.00$86.40$355.00$195.00$93.30$440.00
27Wingwall (FW - 0) (HW=6 FT) (466-7148)EACH2$10,750$15,000$16,200$9,085.00$18,000$17,500$16,500
28Wingwall (FW - 0) (HW=8 FT) (466-7150)EACH2$18,000$18,000$19,440$11,502$24,000$21,000$17,600
29Wingwall (FW - S) (HW=6 FT) (466-7162)EACH2$21,000$26,000$28,080$9,590.00$53,000$30,300$17,600
30Set (type I)(S= 3 FT)(HW= 2 FT)(4:1)(C) (467-7037)EACH6$5,500.00$10,000$10,800$10,497$12,000$11,700$8,800.00
31Set (type I)(S= 4 FT)(HW= 2 FT)(6:1)(P) (467-7066)EACH2$6,500.00$12,000$12,960$10,313$11,000$14,000$13,200
32Set (type I)(S= 4 FT)(HW= 3 FT)(4:1)(C) (467-7068)EACH4$8,000.00$13,500$14,580$12,437$14,000$15,700$13,200
33Set (type I)(S= 8 FT)(HW= 6 FT)(3:1)(C) (467-7187)EACH2$17,250$18,000$19,440$17,482$25,000$21,000$16,500
34Set (type I)(S= 8 FT)(HW= 9 FT)(3:1)(C) (467-7196)EACH2$23,000$30,000$32,400$25,978$37,000$35,000$19,800
35Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304)EACH14$1,400.00$1,350.00$1,457.99$2,053.00$1,300.00$1,570.00$2,750.00
36Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH2$2,500.00$2,200.00$2,375.98$1,792.00$1,850.00$2,560.00$3,300.00
37Clean existing culverts (480-7001)EACH11$1,000.00$2,300.00$2,483.98$1,223.00$3,200.00$2,680.00$8,800.00
38Removing structure (box culvert) (496-7001)EACH10$11,950$10,000$10,800$1,910.00$5,400.00$11,700$5,500.00
39Mobilization (500-7001)LS1$485,000$450,000$436,136$516,534$425,000$600,000$100,000
40Barricades, signs and traffic handling (502-7001)MO14$8,000.00$2,000.00$7,379.93$3,035.00$5,000.00$10,000$1.00
41Portable changeable message sign (503-7002)EACH4$10,000$3,500.00$7,500.00$5,832.00$5,000.00$17,000$11,000
42TMA (stationary) (505-7001)DAY190$400.00$5.00$125.00$275.00$275.00$391.00$275.00
43TMA (mobile operation) (505-7003)DAY34$400.00$10.00$350.00$315.00$275.00$898.00$440.00
44Rock filter dams (install) (type 1) (506-7001)LF380$50.00$40.00$48.00$58.00$52.00$49.50$10.00
45Rock filter dams (remove) (506-7011)LF380$20.00$5.00$18.00$7.00$14.00$12.50$5.00
46Temporary sediment control fence (install) (506-7039)LF4,110$5.50$3.00$4.20$5.00$6.00$5.30$2.00
47Temporary sediment control fence (remove) (506-7041)LF4,110$2.00$1.00$1.08$3.00$2.00$0.53$1.00
48One-way traffic control (port traffic signal) (510-7003)MO12$6,000.00$4,000.00$11,000$2,291.00$6,500.00$3,240.00$1.00
49Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF2,160$54.00$85.00$40.00$93.00$90.00$97.20$105.00
50Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF9,270$12.00$14.00$15.00$18.00$23.00$18.50$22.00
51Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF2,160$18.00$15.00$15.00$17.00$23.00$35.60$33.00
52Metal W-beam guard fence (timber post) (540-7001)LF4,375$30.25$27.00$29.90$27.00$26.00$25.50$24.00
53Metal beam guard fence trans (thrie-beam) (540-7005)EACH20$2,900.00$2,185.00$2,799.14$2,188.00$2,100.00$2,650.00$2,750.00
54Metal W - beam guard fence (low fill culvert) (540-7018)LF275$95.00$115.00$105.50$127.00$115.00$82.80$132.00
55Metal beam guard fence (long span system) (540-7027)EACH2$1,200.00$1,525.00$1,378.37$1,527.00$1,500.00$1,430.00$1,650.00
56Remove metal beam guard fence (542-7001)LF4,739$3.50$1.00$2.12$4.00$3.00$2.65$2.00
57Remove terminal anchor section (542-7002)EACH18$200.00$300.00$227.96$325.00$245.00$265.00$550.00
58Guardrail end treatment (install) (544-7001)EACH32$3,250.00$3,500.00$3,583.75$3,956.00$3,900.00$3,290.00$3,740.00
59Guardrail end treatment (remove) (544-7003)EACH10$360.00$300.00$344.59$325.00$311.00$265.00$550.00
60Crash cushion attenuator (move & reset) (545-7002)EACH34$1,640.00$1,300.00$1,484.39$1,005.00$965.00$1,530.00$2,200.00
61Crash cushion attenuator (remove) (545-7004)EACH8$1,000.00$1,000.00$848.22$886.00$850.00$1,090.00$5,500.00
62Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH8$9,500.00$7,700.00$8,227.78$9,750.00$8,900.00$7,590.00$11,000
63Mailbox install-S (WC-post) type 3 (560-7004)EACH1$275.00$170.00$185.58$200.00$200.00$421.00$1,100.00
64Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH122$50.00$60.00$31.81$30.00$35.00$25.20$55.00
65Work zone pavement marking removing (W)6"(solid) (662-7068)LF19,205$1.10$1.12$1.78$2.00$3.00$1.35$2.00
66Work zone pavement marking removing (W)24"(solid) (662-7077)LF308$12.25$18.88$21.35$19.00$12.00$15.90$2.00
67Work zone pavement marking removing (Y)6"(solid) (662-7100)LF16,430$1.25$1.12$1.78$2.00$3.00$1.35$2.00
68Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF13,493$0.95$3.01$2.06$7.00$5.00$1.55$2.00
69Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF3,919$0.95$3.01$2.42$8.00$6.00$1.80$2.00
70Reflectorized pavement marker type II-A-A (672-7004)EACH172$4.50$14.16$11.39$31.00$8.00$8.50$22.00
71Eliminating existing PM & markers (4") (677-7001)LF3,919$1.25$7.67$2.14$5.00$9.00$1.60$2.00
TxDOT contract A00196770: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy