TxDOT contract A00214842 bid tabulation
Total Maintenance, IH0045 (SH 87 to SOUTHERN STREET). Let by Texas DOT on July 1, 2025, Harris, Houston District. 3 bids received; low bid $4,988,410 by Roy Jorgensen Associates, Inc., -10% against the engineer's estimate of $5,551,811.
- Owner
- Texas DOT
- Letting
- 01 JUL 2025
- Pay items
- 98
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Roy Jorgensen Associates, Inc. | $4,988,410 | Low | -10% |
| 2 | Isi Contracting, Inc. | $5,262,303 | +5.0% | -5.0% |
| 3 | Hazmat International, Inc. | $5,605,539 | +12% | +1.0% |
Engineer's estimate: $5,551,811.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Roy Jorgensen Associates, Inc. | 2. Isi Contracting, Inc. | 3. Hazmat International, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 600 | $20.16 | $15.00 | $25.00 | $10.44 |
| 2 | Removing concrete (riprap) (104-7007) | CY | 20 | $19.00 | $50.00 | $25.00 | $50.00 |
| 3 | Removing concrete (traffic barrier) (104-7035) | LF | 30 | $5.00 | $10.00 | $150.00 | $75.00 |
| 4 | Blading (150-7003) | LF | 500 | $1.61 | $10.00 | $25.00 | $15.00 |
| 5 | Concrete structure repair(rapid vert and overhead) (429-7008) | SF | 300 | $71.61 | $200.00 | $85.00 | $250.00 |
| 6 | Riprap (concrete)(5 in) (432-7002) | CY | 20 | $573.31 | $425.00 | $455.00 | $650.00 |
| 7 | Riprap (mow strip)(5 in) (432-7014) | CY | 20 | $250.00 | $450.00 | $450.00 | $650.00 |
| 8 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 400 | $54.00 | $48.00 | $16.37 | $100.00 |
| 9 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 400 | $59.00 | $45.00 | $32.00 | $100.00 |
| 10 | Cleaning & sealing existing joint (SEJ) (438-7013) | LF | 200 | $96.00 | $85.00 | $98.69 | $100.00 |
| 11 | Mobilization (callout) (500-7002) | EACH | 24 | $500.00 | $500.00 | $1,500.00 | $250.00 |
| 12 | Mobilization (emergency) (500-7033) | EACH | 40 | $2,000.00 | $1,000.00 | $2,500.00 | $2,000.00 |
| 13 | Portable changeable message sign (503-7001) | DAY | 60 | $150.00 | $150.00 | $208.78 | $150.00 |
| 14 | TMA (stationary) (505-7001) | DAY | 250 | $400.00 | $100.00 | $500.00 | $400.00 |
| 15 | TMA (mobile operation) (505-7002) | HR | 3,000 | $68.00 | $75.00 | $81.52 | $80.00 |
| 16 | Portable concrete traffic barrier (des source) (safety SH)(type 2) (512-7062) | LF | 30 | $8.68 | $50.00 | $5.32 | $50.00 |
| 17 | Portable concrete traffic barrier (move)(safety SH)(type 2) (512-7063) | LF | 120 | $2.14 | $50.00 | $1.29 | $50.00 |
| 18 | Portable concrete traffic barrier (remove)(safety SH)(type 2) (512-7065) | LF | 30 | $1.03 | $50.00 | $5.32 | $50.00 |
| 19 | Portable concrete traffic barrier (pinning) (512-7071) | EACH | 40 | $75.00 | $500.00 | $110.65 | $50.00 |
| 20 | Portable concrete traffic barrier (aligning) (512-7108) | LF | 1,300 | $20.88 | $6.00 | $2.20 | $50.00 |
| 21 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,100.00 | $1,900.00 | $1,623.30 | $1,200.00 |
| 22 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,500.00 | $1,200.00 | $1,930.26 | $1,800.00 |
| 23 | Metal W-beam guard fence (special) (540-7017) | LF | 25 | $31.50 | $60.00 | $38.00 | $300.00 |
| 24 | Connector plate for thrie beam (540-7030) | EACH | 5 | $500.00 | $450.00 | $458.30 | $250.00 |
| 25 | Remove metal beam guard fence (542-7001) | LF | 1,000 | $5.88 | $10.00 | $9.61 | $1.00 |
| 26 | Aluminum signs (type A) (636-7001) | SF | 1,000 | $41.00 | $35.00 | $23.19 | $35.00 |
| 27 | Aluminum signs (type G) (636-7002) | SF | 500 | $56.55 | $50.00 | $34.89 | $50.00 |
| 28 | Replace existing aluminum signs(type A) (636-7004) | SF | 300 | $35.00 | $40.00 | $23.19 | $50.00 |
| 29 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 5 | $2,341.00 | $1,500.00 | $2,405.49 | $3,000.00 |
| 30 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 5 | $2,659.33 | $1,500.00 | $2,405.49 | $3,000.00 |
| 31 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 100 | $645.02 | $500.00 | $398.10 | $650.00 |
| 32 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 3,000 | $17.00 | $8.00 | $8.82 | $10.00 |
| 33 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 300 | $32.00 | $30.00 | $13.35 | $20.00 |
| 34 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 2,000 | $15.00 | $8.00 | $8.82 | $10.00 |
| 35 | Fiber reinforced polymer patching materials (721-7001) | LB | 500 | $9.20 | $6.00 | $10.00 | $300.00 |
| 36 | Pavement edges, structures & fixtures (731-7003) | MI | 75 | $100.00 | $700.00 | $250.00 | $650.00 |
| 37 | Litter removal (spot) (734-7003) | ACRE | 4 | $100.00 | $1,500.00 | $117.50 | $1,500.00 |
| 38 | Litter removal - tract (1) (734-7054) | CYC | 96 | $5,600.00 | $5,850.00 | $9,000.00 | $5,500.00 |
| 39 | Clean / sweep - center median - area(1) (738-7005) | CYC | 96 | $3,500.00 | $3,550.00 | $922.00 | $3,600.00 |
| 40 | Clean / sweep-outside main lane-area(1) (738-7029) | CYC | 96 | $3,500.00 | $3,550.00 | $1,845.00 | $3,600.00 |
| 41 | Clean / sweep - frontage road - area(1) (738-7051) | CYC | 48 | $4,750.00 | $2,500.00 | $984.00 | $4,900.00 |
| 42 | Clean / sweep - (entr /ext RMP)(area 1) (738-7072) | CYC | 48 | $2,650.00 | $1,500.00 | $984.00 | $2,900.00 |
| 43 | Clean/sweeping-direct connect-area(1) (738-7093) | CYC | 48 | $1,350.00 | $675.00 | $984.00 | $1,400.00 |
| 44 | Clean/sweeping-direct connect-area(2) (738-7094) | CYC | 48 | $1,650.00 | $850.00 | $246.00 | $1,400.00 |
| 45 | Cleaning / sweeping (handwork) (738-7105) | SY | 5,000 | $0.97 | $1.00 | $1.00 | $1.00 |
| 46 | Drain inlet cleaning (764-7001) | EACH | 300 | $87.50 | $100.00 | $53.67 | $65.00 |
| 47 | Downspout cleaning (764-7004) | EACH | 75 | $80.00 | $100.00 | $80.51 | $75.00 |
| 48 | Storm sewer cleaning (pipe)(12"-18"diameter) (764-7007) | LF | 3,000 | $3.10 | $3.50 | $2.95 | $4.50 |
| 49 | Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008) | LF | 5,000 | $7.00 | $5.50 | $3.22 | $4.50 |
| 50 | Storm sewer cleaning (pipe)(25"-30"diameter) (764-7009) | LF | 10,000 | $8.00 | $5.50 | $4.03 | $5.25 |
| 51 | Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010) | LF | 10,000 | $8.06 | $7.00 | $4.29 | $6.25 |
| 52 | Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011) | LF | 5,000 | $9.85 | $8.00 | $5.10 | $7.50 |
| 53 | Storm sewer clean (box culvert) (6-<12 SF) (764-7016) | LF | 850 | $12.00 | $10.50 | $6.44 | $12.00 |
| 54 | Storm sewer clean (box culvert)(12-<24 SF) (764-7017) | LF | 4,000 | $9.05 | $14.00 | $7.51 | $13.50 |
| 55 | Storm sewer clean (box culvert)(24-<48 SF) (764-7018) | LF | 2,000 | $13.00 | $16.00 | $8.59 | $16.00 |
| 56 | Replace rail element (W-beam) (770-7001) | LF | 2,000 | $21.00 | $20.00 | $30.81 | $14.00 |
| 57 | Replace rail element (thrie-beam) (770-7002) | LF | 25 | $34.00 | $50.00 | $36.72 | $100.00 |
| 58 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 5 | $417.27 | $175.00 | $931.80 | $300.00 |
| 59 | Replace timber post W/O concrete FND (770-7006) | EACH | 80 | $94.24 | $65.00 | $105.59 | $65.00 |
| 60 | Replace timber post W/ concrete FND (770-7008) | EACH | 150 | $211.64 | $100.00 | $142.18 | $100.00 |
| 61 | Replace steel post W/ concrete FND (770-7009) | EACH | 100 | $294.03 | $75.00 | $189.77 | $75.00 |
| 62 | Realign posts (770-7010) | EACH | 100 | $15.00 | $50.00 | $17.17 | $75.00 |
| 63 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 10 | $3,072.57 | $3,250.00 | $2,873.73 | $2,500.00 |
| 64 | Repl single gdrail terminal impact head (770-7015) | EACH | 50 | $1,362.15 | $1,250.00 | $1,553.77 | $1,000.00 |
| 65 | Replace single gdrail terminal rail (770-7016) | LF | 2,500 | $35.00 | $30.00 | $48.91 | $34.00 |
| 66 | Replace single gdrail terminal post (770-7017) | EACH | 300 | $62.16 | $100.00 | $59.03 | $60.00 |
| 67 | Replace blockout (770-7018) | EACH | 150 | $100.00 | $100.00 | $41.25 | $50.00 |
| 68 | Repair steel post with base plate (770-7019) | EACH | 3 | $101.04 | $450.00 | $508.28 | $750.00 |
| 69 | Reset SGT impact head (770-7020) | EACH | 25 | $293.48 | $300.00 | $349.08 | $300.00 |
| 70 | Replace SGT object marker (770-7021) | EACH | 60 | $33.25 | $50.00 | $38.59 | $100.00 |
| 71 | Replace SGT cable anchor (770-7022) | EACH | 55 | $112.24 | $100.00 | $137.26 | $100.00 |
| 72 | Replace SGT cable assembly (770-7023) | EACH | 55 | $133.91 | $100.00 | $193.76 | $100.00 |
| 73 | Replace SGT strut (770-7024) | EACH | 25 | $120.00 | $100.00 | $127.99 | $100.00 |
| 74 | Raise rail (770-7025) | LF | 500 | $15.71 | $12.00 | $15.26 | $15.00 |
| 75 | Replace downstream anchor terminal (770-7026) | EACH | 5 | $1,018.75 | $1,000.00 | $1,340.54 | $1,200.00 |
| 76 | Replace hinged top SGT post (steel) (770-7032) | EACH | 20 | $400.00 | $300.00 | $522.38 | $100.00 |
| 77 | Realign hinged top SGT post ((steel) (770-7033) | EACH | 20 | $400.00 | $150.00 | $48.02 | $100.00 |
| 78 | Replace (SMTC) narrow (774-7002) | EACH | 20 | $23,000 | $28,000 | $27,000 | $25,000 |
| 79 | Repair (SMTC) narrow (774-7003) | LF | 440 | $374.39 | $250.00 | $150.00 | $200.00 |
| 80 | Replace (SMTC) wide (774-7005) | EACH | 20 | $20,000 | $36,000 | $42,250 | $35,000 |
| 81 | Repair (SMTC) wide (774-7006) | LF | 240 | $399.39 | $300.00 | $150.00 | $200.00 |
| 82 | Repair (steel rail) (776-7001) | LF | 50 | $46.63 | $1.00 | $177.00 | $300.00 |
| 83 | Repair (steel pedestrian rail) (776-7003) | LF | 30 | $210.50 | $1.00 | $177.00 | $300.00 |
| 84 | Repair (steel pipe pedestrian rail)(PR1) (776-7020) | LF | 50 | $330.31 | $300.00 | $177.00 | $300.00 |
| 85 | Repair(steel pipe pedestrian railw/parapet)(PR2) (776-7022) | LF | 30 | $250.00 | $1.00 | $117.00 | $300.00 |
| 86 | Permanent concrete traffic barrier repair (F shape) (777-7001) | LF | 150 | $362.50 | $10.00 | $117.00 | $50.00 |
| 87 | Permanent concrete traffic barrier repair(single slope) (777-7003) | LF | 150 | $1,032.67 | $10.00 | $117.00 | $50.00 |
| 88 | Concrete rail repair (in-kind) (778-7001) | LF | 500 | $400.00 | $100.00 | $117.00 | $50.00 |
| 89 | Bridge joint replacement (armor) (785-7010) | LF | 200 | $938.50 | $650.00 | $585.00 | $350.00 |
| 90 | Bridge joint replacement (SEJ) (785-7011) | LF | 50 | $1,512.00 | $750.00 | $645.00 | $700.00 |
| 91 | Carbon fiber reinforced polymer strengthning (786-7002) | SF | 250 | $80.00 | $10.00 | $240.00 | $100.00 |
| 92 | Snow and ice control (truck) (2001-7001) | HR | 500 | $110.00 | $110.00 | $75.00 | $200.00 |
| 93 | Snow and ice control (shadow vehicle) (2001-7002) | HR | 400 | $100.00 | $100.00 | $10.00 | $80.00 |
| 94 | Snow and ice control (loader) (2001-7003) | HR | 48 | $150.00 | $150.00 | $50.00 | $150.00 |
| 95 | Snow and ice control (season) (2001-7004) | MO | 6 | $25,000 | $20,000 | $75,000 | $50,000 |
| 96 | Snow and ice control (spray rig) (2001-7005) | HR | 500 | $162.50 | $100.00 | $175.00 | $50.00 |
| 97 | Repair large RDSD sign supt & assem (6074-7001) | EACH | 35 | $1,500.00 | $1,500.00 | $2,100.00 | $1,250.00 |
| 98 | Storm sewer (television inspection) (7000-7001) | LF | 300 | $3.14 | $6.50 | $3.25 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.