TxDOT contract A00214842 bid tabulation

Total Maintenance, IH0045 (SH 87 to SOUTHERN STREET). Let by Texas DOT on July 1, 2025, Harris, Houston District. 3 bids received; low bid $4,988,410 by Roy Jorgensen Associates, Inc., -10% against the engineer's estimate of $5,551,811.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
98
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Roy Jorgensen Associates, Inc.$4,988,410Low-10%
2Isi Contracting, Inc.$5,262,303+5.0%-5.0%
3Hazmat International, Inc.$5,605,539+12%+1.0%
TxDOT contract A00214842: bids by rank

Engineer's estimate: $5,551,811.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Roy Jorgensen Associates, Inc.2. Isi Contracting, Inc.3. Hazmat International, Inc.
1Removing concrete (mowstrip) (104-7005)LF600$20.16$15.00$25.00$10.44
2Removing concrete (riprap) (104-7007)CY20$19.00$50.00$25.00$50.00
3Removing concrete (traffic barrier) (104-7035)LF30$5.00$10.00$150.00$75.00
4Blading (150-7003)LF500$1.61$10.00$25.00$15.00
5Concrete structure repair(rapid vert and overhead) (429-7008)SF300$71.61$200.00$85.00$250.00
6Riprap (concrete)(5 in) (432-7002)CY20$573.31$425.00$455.00$650.00
7Riprap (mow strip)(5 in) (432-7014)CY20$250.00$450.00$450.00$650.00
8Cleaning and sealing existing joints (CL3) (438-7004)LF400$54.00$48.00$16.37$100.00
9Cleaning and sealing existing joints (CL7) (438-7007)LF400$59.00$45.00$32.00$100.00
10Cleaning & sealing existing joint (SEJ) (438-7013)LF200$96.00$85.00$98.69$100.00
11Mobilization (callout) (500-7002)EACH24$500.00$500.00$1,500.00$250.00
12Mobilization (emergency) (500-7033)EACH40$2,000.00$1,000.00$2,500.00$2,000.00
13Portable changeable message sign (503-7001)DAY60$150.00$150.00$208.78$150.00
14TMA (stationary) (505-7001)DAY250$400.00$100.00$500.00$400.00
15TMA (mobile operation) (505-7002)HR3,000$68.00$75.00$81.52$80.00
16Portable concrete traffic barrier (des source) (safety SH)(type 2) (512-7062)LF30$8.68$50.00$5.32$50.00
17Portable concrete traffic barrier (move)(safety SH)(type 2) (512-7063)LF120$2.14$50.00$1.29$50.00
18Portable concrete traffic barrier (remove)(safety SH)(type 2) (512-7065)LF30$1.03$50.00$5.32$50.00
19Portable concrete traffic barrier (pinning) (512-7071)EACH40$75.00$500.00$110.65$50.00
20Portable concrete traffic barrier (aligning) (512-7108)LF1,300$20.88$6.00$2.20$50.00
21Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,100.00$1,900.00$1,623.30$1,200.00
22Downstream anchor terminal section (540-7015)EACH10$1,500.00$1,200.00$1,930.26$1,800.00
23Metal W-beam guard fence (special) (540-7017)LF25$31.50$60.00$38.00$300.00
24Connector plate for thrie beam (540-7030)EACH5$500.00$450.00$458.30$250.00
25Remove metal beam guard fence (542-7001)LF1,000$5.88$10.00$9.61$1.00
26Aluminum signs (type A) (636-7001)SF1,000$41.00$35.00$23.19$35.00
27Aluminum signs (type G) (636-7002)SF500$56.55$50.00$34.89$50.00
28Replace existing aluminum signs(type A) (636-7004)SF300$35.00$40.00$23.19$50.00
29In bridge MNT clearance sign assembly(type N) (644-7061)EACH5$2,341.00$1,500.00$2,405.49$3,000.00
30In bridge MNT clearance sign assembly(type S) (644-7062)EACH5$2,659.33$1,500.00$2,405.49$3,000.00
31Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH100$645.02$500.00$398.10$650.00
32Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH3,000$17.00$8.00$8.82$10.00
33Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH300$32.00$30.00$13.35$20.00
34Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH2,000$15.00$8.00$8.82$10.00
35Fiber reinforced polymer patching materials (721-7001)LB500$9.20$6.00$10.00$300.00
36Pavement edges, structures & fixtures (731-7003)MI75$100.00$700.00$250.00$650.00
37Litter removal (spot) (734-7003)ACRE4$100.00$1,500.00$117.50$1,500.00
38Litter removal - tract (1) (734-7054)CYC96$5,600.00$5,850.00$9,000.00$5,500.00
39Clean / sweep - center median - area(1) (738-7005)CYC96$3,500.00$3,550.00$922.00$3,600.00
40Clean / sweep-outside main lane-area(1) (738-7029)CYC96$3,500.00$3,550.00$1,845.00$3,600.00
41Clean / sweep - frontage road - area(1) (738-7051)CYC48$4,750.00$2,500.00$984.00$4,900.00
42Clean / sweep - (entr /ext RMP)(area 1) (738-7072)CYC48$2,650.00$1,500.00$984.00$2,900.00
43Clean/sweeping-direct connect-area(1) (738-7093)CYC48$1,350.00$675.00$984.00$1,400.00
44Clean/sweeping-direct connect-area(2) (738-7094)CYC48$1,650.00$850.00$246.00$1,400.00
45Cleaning / sweeping (handwork) (738-7105)SY5,000$0.97$1.00$1.00$1.00
46Drain inlet cleaning (764-7001)EACH300$87.50$100.00$53.67$65.00
47Downspout cleaning (764-7004)EACH75$80.00$100.00$80.51$75.00
48Storm sewer cleaning (pipe)(12"-18"diameter) (764-7007)LF3,000$3.10$3.50$2.95$4.50
49Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008)LF5,000$7.00$5.50$3.22$4.50
50Storm sewer cleaning (pipe)(25"-30"diameter) (764-7009)LF10,000$8.00$5.50$4.03$5.25
51Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010)LF10,000$8.06$7.00$4.29$6.25
52Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011)LF5,000$9.85$8.00$5.10$7.50
53Storm sewer clean (box culvert) (6-<12 SF) (764-7016)LF850$12.00$10.50$6.44$12.00
54Storm sewer clean (box culvert)(12-<24 SF) (764-7017)LF4,000$9.05$14.00$7.51$13.50
55Storm sewer clean (box culvert)(24-<48 SF) (764-7018)LF2,000$13.00$16.00$8.59$16.00
56Replace rail element (W-beam) (770-7001)LF2,000$21.00$20.00$30.81$14.00
57Replace rail element (thrie-beam) (770-7002)LF25$34.00$50.00$36.72$100.00
58Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH5$417.27$175.00$931.80$300.00
59Replace timber post W/O concrete FND (770-7006)EACH80$94.24$65.00$105.59$65.00
60Replace timber post W/ concrete FND (770-7008)EACH150$211.64$100.00$142.18$100.00
61Replace steel post W/ concrete FND (770-7009)EACH100$294.03$75.00$189.77$75.00
62Realign posts (770-7010)EACH100$15.00$50.00$17.17$75.00
63Rem obsolete get & repl W/ SGT (770-7013)EACH10$3,072.57$3,250.00$2,873.73$2,500.00
64Repl single gdrail terminal impact head (770-7015)EACH50$1,362.15$1,250.00$1,553.77$1,000.00
65Replace single gdrail terminal rail (770-7016)LF2,500$35.00$30.00$48.91$34.00
66Replace single gdrail terminal post (770-7017)EACH300$62.16$100.00$59.03$60.00
67Replace blockout (770-7018)EACH150$100.00$100.00$41.25$50.00
68Repair steel post with base plate (770-7019)EACH3$101.04$450.00$508.28$750.00
69Reset SGT impact head (770-7020)EACH25$293.48$300.00$349.08$300.00
70Replace SGT object marker (770-7021)EACH60$33.25$50.00$38.59$100.00
71Replace SGT cable anchor (770-7022)EACH55$112.24$100.00$137.26$100.00
72Replace SGT cable assembly (770-7023)EACH55$133.91$100.00$193.76$100.00
73Replace SGT strut (770-7024)EACH25$120.00$100.00$127.99$100.00
74Raise rail (770-7025)LF500$15.71$12.00$15.26$15.00
75Replace downstream anchor terminal (770-7026)EACH5$1,018.75$1,000.00$1,340.54$1,200.00
76Replace hinged top SGT post (steel) (770-7032)EACH20$400.00$300.00$522.38$100.00
77Realign hinged top SGT post ((steel) (770-7033)EACH20$400.00$150.00$48.02$100.00
78Replace (SMTC) narrow (774-7002)EACH20$23,000$28,000$27,000$25,000
79Repair (SMTC) narrow (774-7003)LF440$374.39$250.00$150.00$200.00
80Replace (SMTC) wide (774-7005)EACH20$20,000$36,000$42,250$35,000
81Repair (SMTC) wide (774-7006)LF240$399.39$300.00$150.00$200.00
82Repair (steel rail) (776-7001)LF50$46.63$1.00$177.00$300.00
83Repair (steel pedestrian rail) (776-7003)LF30$210.50$1.00$177.00$300.00
84Repair (steel pipe pedestrian rail)(PR1) (776-7020)LF50$330.31$300.00$177.00$300.00
85Repair(steel pipe pedestrian railw/parapet)(PR2) (776-7022)LF30$250.00$1.00$117.00$300.00
86Permanent concrete traffic barrier repair (F shape) (777-7001)LF150$362.50$10.00$117.00$50.00
87Permanent concrete traffic barrier repair(single slope) (777-7003)LF150$1,032.67$10.00$117.00$50.00
88Concrete rail repair (in-kind) (778-7001)LF500$400.00$100.00$117.00$50.00
89Bridge joint replacement (armor) (785-7010)LF200$938.50$650.00$585.00$350.00
90Bridge joint replacement (SEJ) (785-7011)LF50$1,512.00$750.00$645.00$700.00
91Carbon fiber reinforced polymer strengthning (786-7002)SF250$80.00$10.00$240.00$100.00
92Snow and ice control (truck) (2001-7001)HR500$110.00$110.00$75.00$200.00
93Snow and ice control (shadow vehicle) (2001-7002)HR400$100.00$100.00$10.00$80.00
94Snow and ice control (loader) (2001-7003)HR48$150.00$150.00$50.00$150.00
95Snow and ice control (season) (2001-7004)MO6$25,000$20,000$75,000$50,000
96Snow and ice control (spray rig) (2001-7005)HR500$162.50$100.00$175.00$50.00
97Repair large RDSD sign supt & assem (6074-7001)EACH35$1,500.00$1,500.00$2,100.00$1,250.00
98Storm sewer (television inspection) (7000-7001)LF300$3.14$6.50$3.25$30.00
TxDOT contract A00214842: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way