TxDOT contract A00062051 bid tabulation

Resurface Roadway, FM 730 (SH 114 to TARRANT COUNTY LINE). Let by Texas DOT on July 1, 2025, Wise, Fort Worth District. 4 bids received; low bid $15,286,842 by Foutsco Paving Company, LLC, -9.0% against the engineer's estimate of $16,798,752.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
155
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Foutsco Paving Company, LLC$15,286,842Low-9.0%
2Jagoe-Public Company$15,604,535+2.0%-7.0%
3Jay Mills Contracting, Incorporated$16,953,287+11%+1.0%
4Grey Sky Construction LLC$17,867,386+17%+6.0%
TxDOT contract A00062051: bids by rank

Engineer's estimate: $16,798,752.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Foutsco Paving Company, LLC2. Jagoe-Public Company3. Jay Mills Contracting, Incorporated4. Grey Sky Construction LLC
1Preparing row (100-7002)STA96$500.00$3,000.00$1,500.00$16,600
2Remove (14") TRT/untrt base & asphalt pavement (105-7034)SY2,048$20.00$13.00$15.00$30.00
3Remove (16") TRT/untrt base & asphalt pavement (105-7036)SY3,909$20.00$13.00$16.00$35.00
4Excavation (roadway) (110-7001)CY11,293$17.50$30.00$25.00$20.00
5Embankment (final)(DC)(type B) (132-7004)CY2,200$50.00$60.00$30.00$65.00
6Backfill (type A or B)(vehicle) (134-7009)CY4,000$20.00$2.00$50.00$50.00
7Compost manuf topsoil (4") (161-7002)SY52,700$2.00$2.00$7.95$10.00
8Broadcast seed (temporary_warm) (164-7005)SY26,356$0.10$0.20$0.21$1.00
9Broadcast seed (temporary_cool) (164-7006)SY26,356$0.10$0.20$0.21$1.00
10Straw/hay mulch seed(permanent_rural_clay) (164-7026)SY52,700$0.50$0.45$0.44$1.00
11Vegetative watering (168-7001)TGL1,857$1.00$60.00$21.00$30.00
12Proof rolling (216-7001)HR19$1.00$80.00$200.00$150.00
13FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176)CY5,674$65.00$110.00$72.00$80.00
14Cement (275-7001)TON383$375.00$450.00$410.00$350.00
15Cement TRT (existing material)(8") (275-7003)SY26,824$7.00$12.00$6.00$8.00
16Prime coat(MC-30 or AE-P) (310-7013)GAL5,375$3.00$2.50$6.50$6.00
17Asphalt (CRS-2P) (316-7012)GAL9,678$5.00$10.00$6.00$6.00
18Aggregate (type-B, GR-4)(sac-B) (316-7173)CY213$250.00$150.00$200.00$350.00
19D-GR HMA type-B sac-B PG64-22 (341-7002)TON6,542$180.00$100.00$132.00$140.00
20SP mixes SP-C sac-A PG70-28 (344-7024)TON20,560$180.00$195.00$115.00$203.50$170.00
21Tack coat (344-7077)GAL39,312$6.00$0.10$1.00$0.01$6.00
22Planing asphalt concrete pavement (0" to 9") (354-7037)SY3,000$10.00$10.00$8.00$10.00$20.00
23Planing asphalt concrete pavement(2") (354-7051)SY155,617$4.00$2.00$3.00$3.00$5.00
24Struct excavation (box) (400-7002)CY542$33.00$11.00$45.00$100.00
25Struct excavation (pipe) (400-7003)CY594$1.10$11.00$45.00$100.00
26Cut & restore asphalt paving (400-7008)SY98$385.00$190.00$350.00$200.00
27Flowable backfill (401-7001)CY49$270.00$300.00$300.00$350.00
28Trench excavation protection (402-7001)LF382$6.00$15.00$6.50$10.00
29Temporary special shoring (403-7001)SF2,823$20.00$48.00$77.00$85.00
30Drilled shaft (traffic signal pole) (30 in) (416-7043)LF48$870.00$1,000.00$957.00$450.00
31Drilled shaft (traffic signal pole) (36 in) (416-7044)LF42$960.00$1,100.00$1,056.00$550.00
32Drilled shaft (traffic signal pole) (48 in) (416-7046)LF58$1,080.00$1,200.00$1,188.00$650.00
33Riprap (concrete)(5 in) (432-7002)CY495$600.00$850.00$700.00$650.00
34Riprap (mow strip)(5 in) (432-7014)CY516$680.00$550.00$1,200.00$725.00$550.00
35Riprap (stone protection)(12 in) (432-7041)CY706$189.00$310.00$125.00$150.00
36Riprap (stone protection)(24 in) (432-7045)CY1,454$260.00$190.00$450.00$125.00$200.00
37Cleaning and sealing existing joints (CL3) (438-7004)LF45$55.00$52.00$50.00$62.00$100.00
38Cleaning and sealing existing joints (CL7) (438-7007)LF90$55.00$72.00$40.00$85.00$100.00
39Concrete box culvert (5 FT X 3 FT) (462-7007)LF74$600.00$850.00$480.00$850.00
40Concrete box culvert (3 FT X 2 FT)(extend) (462-7056)LF29$400.00$950.00$425.00$1,000.00
41Concrete box culvert (3 FT X 3 FT)(extend) (462-7057)LF35$450.00$1,000.00$480.00$1,000.00
42Concrete box culvert (8 FT X 6 FT)(extend) (462-7078)LF19$1,000.00$1,800.00$1,100.00$2,000.00
43Concrete box culvert (5 FT X 6.5 FT)(extend) (462-7112)LF53$650.00$1,600.00$685.00$1,500.00
44RC pipe (CL III)(24 in) (464-7005)LF896$130.00$150.00$100.00$120.00
45Wingwall (PW - 1) (HW=4 FT) (466-7174)EACH1$9,000.00$22,000$9,000.00$12,500
46Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH2$17,000$47,500$20,000$16,000
47Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH1$22,000$85,000$25,500$18,000
48Wingwall (PW - 1) (HW=8 FT) (466-7178)EACH3$45,000$88,000$50,000$22,500
49Wingwall (PW - 1) (HW=9 FT) (466-7179)EACH1$34,000$78,000$40,000$35,000
50Set (type I)(S= 3 FT)(HW= 4 FT)(4:1)(C) (467-7045)EACH2$12,000$23,000$14,000$12,500
51Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$1,750.00$3,000.00$1,650.00$2,500.00
52Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH40$2,300.00$3,500.00$2,450.00$1,850.00
53Clean existing culverts (480-7001)EACH124$645.00$750.00$2,100.00$2,500.00$1,500.00
54Removing structure (set) (496-7004)EACH18$300.00$500.00$775.00$500.00
55Removing structure (wingwall) (496-7005)EACH8$3,000.00$5,000.00$3,900.00$2,500.00
56Removing structure (pipe) (496-7007)LF563$15.00$15.00$42.00$50.00
57Mobilization (500-7001)LS1$1,527,950$1,400,000$1,715,000$1,600,000$1,600,000
58Barricades, signs and traffic handling (502-7001)MO26$17,350$40,000$24,000$30,000$15,000
59Portable changeable message sign (503-7001)DAY1,352$150.00$1.00$45.00$105.00$150.00
60TMA (stationary) (505-7001)DAY439$350.00$1.00$150.00$205.00$250.00
61TMA (mobile operation) (505-7003)DAY158$400.00$1.00$150.00$205.00$550.00
62Rock filter dams (install) (type 2) (506-7002)LF270$60.00$50.00$50.00$30.00
63Rock filter dams (remove) (506-7011)LF270$20.00$19.00$18.50$15.00
64Construction exits (install) (type 1) (506-7020)SY1,014$30.00$15.00$36.00$50.00
65Construction exits (remove) (506-7024)SY1,014$10.00$5.00$13.00$20.00
66Temporary sediment control fence (install) (506-7039)LF14,192$4.00$4.00$4.00$4.00
67Temporary sediment control fence (remove) (506-7041)LF14,192$1.00$1.00$1.10$2.00
68Biodegradable erosion control logs (install) (12") (506-7044)LF500$6.00$10.00$10.00$12.00
69Biodegradable erosion control logs (remove) (506-7046)LF500$1.00$1.50$1.50$5.00
70Constructing detours (508-7001)SY947$150.00$100.00$165.00$65.00
71Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF840$75.00$26.00$78.00$100.00
72Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF3,090$30.00$10.00$25.00$20.00
73Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF840$50.00$24.00$15.00$30.00
74Portable concrete traffic barrier (pinning) (512-7071)EACH800$1.00$28.00$80.00$150.00
75Driveways (ACP) (530-7010)SY11,829$75.00$90.00$80.00$102.00$50.00
76Turnouts (ACP) (530-7018)SY405$130.00$500.00$100.00$335.00$55.00
77Mill rumble strips (asphalt) (shoulder) (533-7001)LF37,499$1.00$0.15$0.17$0.18$0.30
78Mill rumble strips (asphalt) (centerline) (533-7002)LF21,071$2.00$0.20$0.30$0.18$0.30
79Metal W-beam guard fence (timber post) (540-7001)LF2,112.50$30.00$24.00$23.00$26.40$30.00
80Metal W-beam guard fence (steel post) (540-7002)LF300$38.00$70.00$100.00$77.00$50.00
81Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,400.00$2,200.00$3,300.00$2,420.00$1,850.00
82Driveway terminal anchor section (540-7014)EACH2$1,500.00$1,300.00$1,650.00$1,850.00
83Metal beam guard fence (long span system) (540-7027)EACH17$1,200.00$1,300.00$1,300.00$1,424.50$1,820.00
84TL-2 31" short radius (W/O dat) (540-7037)EACH2$20,000$4,500.00$22,000$1,850.00
85Remove metal beam guard fence (542-7001)LF2,390$5.00$3.00$2.25$3.30$3.00
86Remove terminal anchor section (542-7002)EACH10$320.00$300.00$220.00$330.00$500.00
87Guardrail end treatment (install) (544-7001)EACH50$3,500.00$3,250.00$3,000.00$3,575.00$3,850.00
88Guardrail end treatment (remove) (544-7003)EACH32$400.00$250.00$340.00$275.00$1,500.00
89Crash cushion attenuator (move & reset) (545-7002)EACH22$2,500.00$1,100.00$2,400.00$6,500.00
90Crash cushion attenuator (remove) (545-7004)EACH6$1,500.00$1,500.00$2,100.00$3,500.00
91Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH6$11,000$15,000$13,500$30,000
92Mailbox install-S (TWG-post) type 2 (560-7002)EACH76$300.00$210.00$240.00$302.50$1,150.00
93Mailbox install-D (TWG-post) type 2 (560-7003)EACH12$370.00$285.00$270.00$313.50$1,150.00
94Mailbox install-M (TWW-post) type 4 (560-7010)EACH13$670.00$795.00$600.00$874.50$1,150.00
95Conduit (PVC) (schedule 40) (2") (618-7030)LF480$49.00$50.00$53.35$20.00
96Conduit (PVC) (schedule 40) (4") (618-7040)LF230$53.00$60.00$58.30$40.00
97Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF825$99.00$110.00$108.90$60.00
98Electrical conductor (no.6) bare (620-7009)LF1,495$4.50$5.00$4.84$3.00
99Electrical conductor (no.6) insulated (620-7010)LF280$4.50$5.00$4.84$3.00
100Tray cable (4 conductor) (12 AWG) (621-7006)LF2,770$4.50$5.00$4.84$3.00
101Ground box type D (162922)W/apron (624-7008)EACH14$3,500.00$3,900.00$3,830.20$1,500.00
102Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148)EACH2$16,000$17,000$16,940$12,500
103Aluminum signs (type A) (636-7001)SF214$80.00$90.00$84.70$30.00
104Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH7$750.00$585.00$1,700.00$643.50$1,500.00
105Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH18$850.00$765.00$1,800.00$841.50$1,500.00
106Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH9$950.00$955.00$2,000.00$1,050.50$1,500.00
107Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017)EACH2$1,450.00$3,200.00$1,595.00$1,500.00
108Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH56$1,300.00$375.00$1,100.00$412.50$1,500.00
109Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058)EACH24$650.00$525.00$1,200.00$577.50$1,500.00
110Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH210$150.00$35.00$50.00$38.50$100.00
111Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061)EACH47$100.00$47.00$220.00$110.00$100.00
112Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF128,612$0.75$0.21$0.15$0.23$0.65
113Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF128,612$0.75$0.21$0.15$0.23$0.65
114Work zone pavement marking removing (W)6"(solid) (662-7068)LF72,722$0.97$0.75$1.07$0.65
115Work zone pavement marking removing (W)24"(solid) (662-7077)LF202$13.00$14.00$13.89$20.00
116Work zone pavement marking removing (Y)6"(solid) (662-7100)LF59,114$0.97$0.75$1.07$1.00
117Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH3,890$2.00$1.00$3.00$1.50$6.00
118Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH18,740$2.00$1.00$3.00$1.50$6.00
119Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF5,830$2.00$0.97$1.00$1.07$5.00
120Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF350$1.25$1.50$1.38$5.00
121Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF201$1.00$1.00$1.10$1.00
122Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF77,793$1.25$0.53$0.60$0.58$0.65
123Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF3,029$1.25$0.75$0.80$0.83$0.65
124Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF78,946$1.25$0.53$0.60$1.10$0.65
125Prefabricated PM type C (W)(12")(solid) (668-7087)LF583$8.00$6.50$7.00$7.15$10.00
126Prefabricated PM type C (W)(24")(solid) (668-7089)LF364$20.00$13.50$15.00$14.85$20.00
127Prefabricated PM type C (W)(arrow) (668-7091)EACH18$300.00$225.00$250.00$247.50$250.00
128Prefabricated PM type C (W)(word) (668-7103)EACH18$350.00$325.00$360.00$357.50$250.00
129Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH25$85.00$100.00$93.50$150.00
130Reflectorized pavement marker type I-C (672-7002)EACH297$8.00$4.25$4.75$4.68$6.00
131Reflectorized pavement marker type II-A-A (672-7004)EACH2,313$8.00$4.25$4.75$4.68$6.00
132Install highway traffic signal (isolated) (680-7002)EACH3$100,000$100,000$84,700$45,000
133Removing traffic signals (680-7004)EACH1$4,000.00$7,500.00$4,235.00$10,000
134Vehicle signal section (12")LED(green) (682-7001)EACH20$1,045.00$1,200.00$1,149.50$350.00
135Vehicle signal section (12")LED(green arrow) (682-7002)EACH5$1,045.00$1,200.00$1,149.50$350.00
136Vehicle signal section (12")LED(yel) (682-7003)EACH20$1,045.00$1,200.00$1,149.50$350.00
137Vehicle signal section (12")LED(yel arrow) (682-7004)EACH5$1,045.00$1,200.00$1,149.50$350.00
138Vehicle signal section (12")LED(red) (682-7005)EACH20$1,045.00$1,200.00$1,149.50$350.00
139Vehicle signal section (12")LED(red arrow) (682-7006)EACH5$1,045.00$1,200.00$1,149.50$350.00
140Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH25$292.00$330.00$321.20$250.00
141Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF1,220$5.50$6.00$6.05$3.00
142Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042)LF2,345$11.00$12.00$12.10$3.00
143Ins traffic signal PL AM(S)1 arm(28')lum (686-7031)EACH3$27,000$29,000$28,215$22,000
144Ins traffic signal PL AM(S)1 arm(32') (686-7033)EACH1$22,130$25,000$24,343$25,000
145Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH4$25,740$29,000$28,314$30,000
146Ins traffic signal PL AM(S)1 arm(50')lum (686-7055)EACH1$58,000$64,000$62,799$50,000
147Ins traffic signal PL AM(S)1 arm(60') (686-7061)EACH1$58,000$63,000$62,194$55,000
148Tree removal (18" - 24" diameter) (752-7007)EACH1$700.00$1,000.00$3,100.00$2,500.00$5,000.00
149Ditch cleaning and reshaping (foot) (760-7001)LF5,075$8.00$7.50$4.50$20.50$10.00
150Bbu system (external battery cabinet) (6007-7001)EACH3$11,000$12,000$11,858$8,500.00
151RVDS (presence det)(install only) (6008-7004)EACH10$4,000.00$4,100.00$3,993.00$3,000.00
152RVDS (advance det)(install only) (6008-7005)EACH8$4,000.00$4,100.00$3,993.00$3,000.00
153Installation of cellular modem (6015-7001)EACH3$500.00$600.00$544.50$6,500.00
154CCTV field equip (digital) (install only) (6018-7001)EACH3$2,000.00$1,800.00$1,765.50$3,000.00
155LED roadside sign (6066-7001)EACH7$4,000.00$4,300.00$4,185.50$4,000.00
TxDOT contract A00062051: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy