TxDOT contract A00062051 bid tabulation
Resurface Roadway, FM 730 (SH 114 to TARRANT COUNTY LINE). Let by Texas DOT on July 1, 2025, Wise, Fort Worth District. 4 bids received; low bid $15,286,842 by Foutsco Paving Company, LLC, -9.0% against the engineer's estimate of $16,798,752.
- Owner
- Texas DOT
- Letting
- 01 JUL 2025
- Pay items
- 155
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Foutsco Paving Company, LLC | $15,286,842 | Low | -9.0% |
| 2 | Jagoe-Public Company | $15,604,535 | +2.0% | -7.0% |
| 3 | Jay Mills Contracting, Incorporated | $16,953,287 | +11% | +1.0% |
| 4 | Grey Sky Construction LLC | $17,867,386 | +17% | +6.0% |
Engineer's estimate: $16,798,752.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Foutsco Paving Company, LLC | 2. Jagoe-Public Company | 3. Jay Mills Contracting, Incorporated | 4. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 96 | $500.00 | $3,000.00 | $1,500.00 | $16,600 | |
| 2 | Remove (14") TRT/untrt base & asphalt pavement (105-7034) | SY | 2,048 | $20.00 | $13.00 | $15.00 | $30.00 | |
| 3 | Remove (16") TRT/untrt base & asphalt pavement (105-7036) | SY | 3,909 | $20.00 | $13.00 | $16.00 | $35.00 | |
| 4 | Excavation (roadway) (110-7001) | CY | 11,293 | $17.50 | $30.00 | $25.00 | $20.00 | |
| 5 | Embankment (final)(DC)(type B) (132-7004) | CY | 2,200 | $50.00 | $60.00 | $30.00 | $65.00 | |
| 6 | Backfill (type A or B)(vehicle) (134-7009) | CY | 4,000 | $20.00 | $2.00 | $50.00 | $50.00 | |
| 7 | Compost manuf topsoil (4") (161-7002) | SY | 52,700 | $2.00 | $2.00 | $7.95 | $10.00 | |
| 8 | Broadcast seed (temporary_warm) (164-7005) | SY | 26,356 | $0.10 | $0.20 | $0.21 | $1.00 | |
| 9 | Broadcast seed (temporary_cool) (164-7006) | SY | 26,356 | $0.10 | $0.20 | $0.21 | $1.00 | |
| 10 | Straw/hay mulch seed(permanent_rural_clay) (164-7026) | SY | 52,700 | $0.50 | $0.45 | $0.44 | $1.00 | |
| 11 | Vegetative watering (168-7001) | TGL | 1,857 | $1.00 | $60.00 | $21.00 | $30.00 | |
| 12 | Proof rolling (216-7001) | HR | 19 | $1.00 | $80.00 | $200.00 | $150.00 | |
| 13 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 5,674 | $65.00 | $110.00 | $72.00 | $80.00 | |
| 14 | Cement (275-7001) | TON | 383 | $375.00 | $450.00 | $410.00 | $350.00 | |
| 15 | Cement TRT (existing material)(8") (275-7003) | SY | 26,824 | $7.00 | $12.00 | $6.00 | $8.00 | |
| 16 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 5,375 | $3.00 | $2.50 | $6.50 | $6.00 | |
| 17 | Asphalt (CRS-2P) (316-7012) | GAL | 9,678 | $5.00 | $10.00 | $6.00 | $6.00 | |
| 18 | Aggregate (type-B, GR-4)(sac-B) (316-7173) | CY | 213 | $250.00 | $150.00 | $200.00 | $350.00 | |
| 19 | D-GR HMA type-B sac-B PG64-22 (341-7002) | TON | 6,542 | $180.00 | $100.00 | $132.00 | $140.00 | |
| 20 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 20,560 | $180.00 | $195.00 | $115.00 | $203.50 | $170.00 |
| 21 | Tack coat (344-7077) | GAL | 39,312 | $6.00 | $0.10 | $1.00 | $0.01 | $6.00 |
| 22 | Planing asphalt concrete pavement (0" to 9") (354-7037) | SY | 3,000 | $10.00 | $10.00 | $8.00 | $10.00 | $20.00 |
| 23 | Planing asphalt concrete pavement(2") (354-7051) | SY | 155,617 | $4.00 | $2.00 | $3.00 | $3.00 | $5.00 |
| 24 | Struct excavation (box) (400-7002) | CY | 542 | $33.00 | $11.00 | $45.00 | $100.00 | |
| 25 | Struct excavation (pipe) (400-7003) | CY | 594 | $1.10 | $11.00 | $45.00 | $100.00 | |
| 26 | Cut & restore asphalt paving (400-7008) | SY | 98 | $385.00 | $190.00 | $350.00 | $200.00 | |
| 27 | Flowable backfill (401-7001) | CY | 49 | $270.00 | $300.00 | $300.00 | $350.00 | |
| 28 | Trench excavation protection (402-7001) | LF | 382 | $6.00 | $15.00 | $6.50 | $10.00 | |
| 29 | Temporary special shoring (403-7001) | SF | 2,823 | $20.00 | $48.00 | $77.00 | $85.00 | |
| 30 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 48 | $870.00 | $1,000.00 | $957.00 | $450.00 | |
| 31 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 42 | $960.00 | $1,100.00 | $1,056.00 | $550.00 | |
| 32 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 58 | $1,080.00 | $1,200.00 | $1,188.00 | $650.00 | |
| 33 | Riprap (concrete)(5 in) (432-7002) | CY | 495 | $600.00 | $850.00 | $700.00 | $650.00 | |
| 34 | Riprap (mow strip)(5 in) (432-7014) | CY | 516 | $680.00 | $550.00 | $1,200.00 | $725.00 | $550.00 |
| 35 | Riprap (stone protection)(12 in) (432-7041) | CY | 706 | $189.00 | $310.00 | $125.00 | $150.00 | |
| 36 | Riprap (stone protection)(24 in) (432-7045) | CY | 1,454 | $260.00 | $190.00 | $450.00 | $125.00 | $200.00 |
| 37 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 45 | $55.00 | $52.00 | $50.00 | $62.00 | $100.00 |
| 38 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 90 | $55.00 | $72.00 | $40.00 | $85.00 | $100.00 |
| 39 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 74 | $600.00 | $850.00 | $480.00 | $850.00 | |
| 40 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 29 | $400.00 | $950.00 | $425.00 | $1,000.00 | |
| 41 | Concrete box culvert (3 FT X 3 FT)(extend) (462-7057) | LF | 35 | $450.00 | $1,000.00 | $480.00 | $1,000.00 | |
| 42 | Concrete box culvert (8 FT X 6 FT)(extend) (462-7078) | LF | 19 | $1,000.00 | $1,800.00 | $1,100.00 | $2,000.00 | |
| 43 | Concrete box culvert (5 FT X 6.5 FT)(extend) (462-7112) | LF | 53 | $650.00 | $1,600.00 | $685.00 | $1,500.00 | |
| 44 | RC pipe (CL III)(24 in) (464-7005) | LF | 896 | $130.00 | $150.00 | $100.00 | $120.00 | |
| 45 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 1 | $9,000.00 | $22,000 | $9,000.00 | $12,500 | |
| 46 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 2 | $17,000 | $47,500 | $20,000 | $16,000 | |
| 47 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 1 | $22,000 | $85,000 | $25,500 | $18,000 | |
| 48 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 3 | $45,000 | $88,000 | $50,000 | $22,500 | |
| 49 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 1 | $34,000 | $78,000 | $40,000 | $35,000 | |
| 50 | Set (type I)(S= 3 FT)(HW= 4 FT)(4:1)(C) (467-7045) | EACH | 2 | $12,000 | $23,000 | $14,000 | $12,500 | |
| 51 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $1,750.00 | $3,000.00 | $1,650.00 | $2,500.00 | |
| 52 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 40 | $2,300.00 | $3,500.00 | $2,450.00 | $1,850.00 | |
| 53 | Clean existing culverts (480-7001) | EACH | 124 | $645.00 | $750.00 | $2,100.00 | $2,500.00 | $1,500.00 |
| 54 | Removing structure (set) (496-7004) | EACH | 18 | $300.00 | $500.00 | $775.00 | $500.00 | |
| 55 | Removing structure (wingwall) (496-7005) | EACH | 8 | $3,000.00 | $5,000.00 | $3,900.00 | $2,500.00 | |
| 56 | Removing structure (pipe) (496-7007) | LF | 563 | $15.00 | $15.00 | $42.00 | $50.00 | |
| 57 | Mobilization (500-7001) | LS | 1 | $1,527,950 | $1,400,000 | $1,715,000 | $1,600,000 | $1,600,000 |
| 58 | Barricades, signs and traffic handling (502-7001) | MO | 26 | $17,350 | $40,000 | $24,000 | $30,000 | $15,000 |
| 59 | Portable changeable message sign (503-7001) | DAY | 1,352 | $150.00 | $1.00 | $45.00 | $105.00 | $150.00 |
| 60 | TMA (stationary) (505-7001) | DAY | 439 | $350.00 | $1.00 | $150.00 | $205.00 | $250.00 |
| 61 | TMA (mobile operation) (505-7003) | DAY | 158 | $400.00 | $1.00 | $150.00 | $205.00 | $550.00 |
| 62 | Rock filter dams (install) (type 2) (506-7002) | LF | 270 | $60.00 | $50.00 | $50.00 | $30.00 | |
| 63 | Rock filter dams (remove) (506-7011) | LF | 270 | $20.00 | $19.00 | $18.50 | $15.00 | |
| 64 | Construction exits (install) (type 1) (506-7020) | SY | 1,014 | $30.00 | $15.00 | $36.00 | $50.00 | |
| 65 | Construction exits (remove) (506-7024) | SY | 1,014 | $10.00 | $5.00 | $13.00 | $20.00 | |
| 66 | Temporary sediment control fence (install) (506-7039) | LF | 14,192 | $4.00 | $4.00 | $4.00 | $4.00 | |
| 67 | Temporary sediment control fence (remove) (506-7041) | LF | 14,192 | $1.00 | $1.00 | $1.10 | $2.00 | |
| 68 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 500 | $6.00 | $10.00 | $10.00 | $12.00 | |
| 69 | Biodegradable erosion control logs (remove) (506-7046) | LF | 500 | $1.00 | $1.50 | $1.50 | $5.00 | |
| 70 | Constructing detours (508-7001) | SY | 947 | $150.00 | $100.00 | $165.00 | $65.00 | |
| 71 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 840 | $75.00 | $26.00 | $78.00 | $100.00 | |
| 72 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 3,090 | $30.00 | $10.00 | $25.00 | $20.00 | |
| 73 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 840 | $50.00 | $24.00 | $15.00 | $30.00 | |
| 74 | Portable concrete traffic barrier (pinning) (512-7071) | EACH | 800 | $1.00 | $28.00 | $80.00 | $150.00 | |
| 75 | Driveways (ACP) (530-7010) | SY | 11,829 | $75.00 | $90.00 | $80.00 | $102.00 | $50.00 |
| 76 | Turnouts (ACP) (530-7018) | SY | 405 | $130.00 | $500.00 | $100.00 | $335.00 | $55.00 |
| 77 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 37,499 | $1.00 | $0.15 | $0.17 | $0.18 | $0.30 |
| 78 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 21,071 | $2.00 | $0.20 | $0.30 | $0.18 | $0.30 |
| 79 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,112.50 | $30.00 | $24.00 | $23.00 | $26.40 | $30.00 |
| 80 | Metal W-beam guard fence (steel post) (540-7002) | LF | 300 | $38.00 | $70.00 | $100.00 | $77.00 | $50.00 |
| 81 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,400.00 | $2,200.00 | $3,300.00 | $2,420.00 | $1,850.00 |
| 82 | Driveway terminal anchor section (540-7014) | EACH | 2 | $1,500.00 | $1,300.00 | $1,650.00 | $1,850.00 | |
| 83 | Metal beam guard fence (long span system) (540-7027) | EACH | 17 | $1,200.00 | $1,300.00 | $1,300.00 | $1,424.50 | $1,820.00 |
| 84 | TL-2 31" short radius (W/O dat) (540-7037) | EACH | 2 | $20,000 | $4,500.00 | $22,000 | $1,850.00 | |
| 85 | Remove metal beam guard fence (542-7001) | LF | 2,390 | $5.00 | $3.00 | $2.25 | $3.30 | $3.00 |
| 86 | Remove terminal anchor section (542-7002) | EACH | 10 | $320.00 | $300.00 | $220.00 | $330.00 | $500.00 |
| 87 | Guardrail end treatment (install) (544-7001) | EACH | 50 | $3,500.00 | $3,250.00 | $3,000.00 | $3,575.00 | $3,850.00 |
| 88 | Guardrail end treatment (remove) (544-7003) | EACH | 32 | $400.00 | $250.00 | $340.00 | $275.00 | $1,500.00 |
| 89 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 22 | $2,500.00 | $1,100.00 | $2,400.00 | $6,500.00 | |
| 90 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $1,500.00 | $1,500.00 | $2,100.00 | $3,500.00 | |
| 91 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 6 | $11,000 | $15,000 | $13,500 | $30,000 | |
| 92 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 76 | $300.00 | $210.00 | $240.00 | $302.50 | $1,150.00 |
| 93 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 12 | $370.00 | $285.00 | $270.00 | $313.50 | $1,150.00 |
| 94 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 13 | $670.00 | $795.00 | $600.00 | $874.50 | $1,150.00 |
| 95 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 480 | $49.00 | $50.00 | $53.35 | $20.00 | |
| 96 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 230 | $53.00 | $60.00 | $58.30 | $40.00 | |
| 97 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 825 | $99.00 | $110.00 | $108.90 | $60.00 | |
| 98 | Electrical conductor (no.6) bare (620-7009) | LF | 1,495 | $4.50 | $5.00 | $4.84 | $3.00 | |
| 99 | Electrical conductor (no.6) insulated (620-7010) | LF | 280 | $4.50 | $5.00 | $4.84 | $3.00 | |
| 100 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 2,770 | $4.50 | $5.00 | $4.84 | $3.00 | |
| 101 | Ground box type D (162922)W/apron (624-7008) | EACH | 14 | $3,500.00 | $3,900.00 | $3,830.20 | $1,500.00 | |
| 102 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 2 | $16,000 | $17,000 | $16,940 | $12,500 | |
| 103 | Aluminum signs (type A) (636-7001) | SF | 214 | $80.00 | $90.00 | $84.70 | $30.00 | |
| 104 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 7 | $750.00 | $585.00 | $1,700.00 | $643.50 | $1,500.00 |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 18 | $850.00 | $765.00 | $1,800.00 | $841.50 | $1,500.00 |
| 106 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 9 | $950.00 | $955.00 | $2,000.00 | $1,050.50 | $1,500.00 |
| 107 | Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017) | EACH | 2 | $1,450.00 | $3,200.00 | $1,595.00 | $1,500.00 | |
| 108 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 56 | $1,300.00 | $375.00 | $1,100.00 | $412.50 | $1,500.00 |
| 109 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 24 | $650.00 | $525.00 | $1,200.00 | $577.50 | $1,500.00 |
| 110 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 210 | $150.00 | $35.00 | $50.00 | $38.50 | $100.00 |
| 111 | Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061) | EACH | 47 | $100.00 | $47.00 | $220.00 | $110.00 | $100.00 |
| 112 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 128,612 | $0.75 | $0.21 | $0.15 | $0.23 | $0.65 |
| 113 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 128,612 | $0.75 | $0.21 | $0.15 | $0.23 | $0.65 |
| 114 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 72,722 | $0.97 | $0.75 | $1.07 | $0.65 | |
| 115 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 202 | $13.00 | $14.00 | $13.89 | $20.00 | |
| 116 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 59,114 | $0.97 | $0.75 | $1.07 | $1.00 | |
| 117 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,890 | $2.00 | $1.00 | $3.00 | $1.50 | $6.00 |
| 118 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 18,740 | $2.00 | $1.00 | $3.00 | $1.50 | $6.00 |
| 119 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,830 | $2.00 | $0.97 | $1.00 | $1.07 | $5.00 |
| 120 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 350 | $1.25 | $1.50 | $1.38 | $5.00 | |
| 121 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 201 | $1.00 | $1.00 | $1.10 | $1.00 | |
| 122 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 77,793 | $1.25 | $0.53 | $0.60 | $0.58 | $0.65 |
| 123 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 3,029 | $1.25 | $0.75 | $0.80 | $0.83 | $0.65 |
| 124 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 78,946 | $1.25 | $0.53 | $0.60 | $1.10 | $0.65 |
| 125 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 583 | $8.00 | $6.50 | $7.00 | $7.15 | $10.00 |
| 126 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 364 | $20.00 | $13.50 | $15.00 | $14.85 | $20.00 |
| 127 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 18 | $300.00 | $225.00 | $250.00 | $247.50 | $250.00 |
| 128 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 18 | $350.00 | $325.00 | $360.00 | $357.50 | $250.00 |
| 129 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 25 | $85.00 | $100.00 | $93.50 | $150.00 | |
| 130 | Reflectorized pavement marker type I-C (672-7002) | EACH | 297 | $8.00 | $4.25 | $4.75 | $4.68 | $6.00 |
| 131 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,313 | $8.00 | $4.25 | $4.75 | $4.68 | $6.00 |
| 132 | Install highway traffic signal (isolated) (680-7002) | EACH | 3 | $100,000 | $100,000 | $84,700 | $45,000 | |
| 133 | Removing traffic signals (680-7004) | EACH | 1 | $4,000.00 | $7,500.00 | $4,235.00 | $10,000 | |
| 134 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 20 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 135 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 5 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 136 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 20 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 137 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 5 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 138 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 20 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 139 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 5 | $1,045.00 | $1,200.00 | $1,149.50 | $350.00 | |
| 140 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 25 | $292.00 | $330.00 | $321.20 | $250.00 | |
| 141 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 1,220 | $5.50 | $6.00 | $6.05 | $3.00 | |
| 142 | Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042) | LF | 2,345 | $11.00 | $12.00 | $12.10 | $3.00 | |
| 143 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 3 | $27,000 | $29,000 | $28,215 | $22,000 | |
| 144 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 1 | $22,130 | $25,000 | $24,343 | $25,000 | |
| 145 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 4 | $25,740 | $29,000 | $28,314 | $30,000 | |
| 146 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $58,000 | $64,000 | $62,799 | $50,000 | |
| 147 | Ins traffic signal PL AM(S)1 arm(60') (686-7061) | EACH | 1 | $58,000 | $63,000 | $62,194 | $55,000 | |
| 148 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 1 | $700.00 | $1,000.00 | $3,100.00 | $2,500.00 | $5,000.00 |
| 149 | Ditch cleaning and reshaping (foot) (760-7001) | LF | 5,075 | $8.00 | $7.50 | $4.50 | $20.50 | $10.00 |
| 150 | Bbu system (external battery cabinet) (6007-7001) | EACH | 3 | $11,000 | $12,000 | $11,858 | $8,500.00 | |
| 151 | RVDS (presence det)(install only) (6008-7004) | EACH | 10 | $4,000.00 | $4,100.00 | $3,993.00 | $3,000.00 | |
| 152 | RVDS (advance det)(install only) (6008-7005) | EACH | 8 | $4,000.00 | $4,100.00 | $3,993.00 | $3,000.00 | |
| 153 | Installation of cellular modem (6015-7001) | EACH | 3 | $500.00 | $600.00 | $544.50 | $6,500.00 | |
| 154 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 3 | $2,000.00 | $1,800.00 | $1,765.50 | $3,000.00 | |
| 155 | LED roadside sign (6066-7001) | EACH | 7 | $4,000.00 | $4,300.00 | $4,185.50 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.