TxDOT contract A00188134 bid tabulation

Resurface Roadway, SL 13 (S. Presa St. to Fairlawn Drive). Let by Texas DOT on July 1, 2025, Bexar, San Antonio District. 6 bids received; low bid $5,240,622 by Clark Construction of Texas, Inc., -33% against the engineer's estimate of $7,796,634.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
84
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Clark Construction of Texas, Inc.$5,240,622Low-33%
2Lone Star Paving Company$6,351,538+21%-19%
3Texas Materials Group, Inc.$6,999,206+34%-10%
4Austin Bridge & Road Services, LP$7,670,990+46%-2.0%
5Hunter Industries, LTD.$7,849,618+50%+1.0%
6Dean Word Company, LTD.$8,312,158+59%+7.0%
TxDOT contract A00188134: bids by rank

Engineer's estimate: $7,796,634.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Clark Construction of Texas, Inc.2. Lone Star Paving Company3. Texas Materials Group, Inc.4. Austin Bridge & Road Services, LP5. Hunter Industries, LTD.6. Dean Word Company, LTD.
1Removing concrete (riprap) (104-7006)SY79$50.00$20.00$45.00$70.00$75.00$52.50$63.70
2Furn & place topsoil (4") (160-7002)SY234$7.50$8.00$7.90$12.00$25.00$9.20$11.80
3Block sodding (162-7002)SY234$12.00$12.00$8.70$13.00$10.00$14.35$15.30
4Vegetative watering (168-7001)TGL3.66$200.00$120.00$30.00$85.00$175.00$38.25$216.50
5Soil ret BLKT(SL_mod_clay_short) (169-7001)SY234$4.00$15.00$3.40$2.50$5.00$2.21$2.40
6D-GR HMA type D PG76-22 (level-UP) (341-7059)TON934$135.00$77.46$160.00$150.00$200.00$129.50$192.60
7SP mixes SP-C sac-B PG76-22 (344-7031)TON36,210$114.50$88.28$103.00$115.50$109.75$116.60$121.60
8Flexible pavement structure repair(6") (351-7005)SY14,433$45.00$39.12$42.00$45.00$50.00$52.05$52.70
9Planing asphalt concrete pavement(2" to 4") (354-7039)SY4,887$1.50$5.00$3.50$3.00$3.60$3.90
10Planing asphalt concrete pavement(2") (354-7051)SY310,550$1.85$1.15$1.60$1.80$3.00$2.50$3.40
11Riprap (concrete)(4 in) (432-7001)CY2$985.00$850.00$1,000.00$1,500.00$1,013.29$1,368.80
12Riprap (mow strip)(4 in) (432-7013)CY19$600.00$735.00$650.00$700.00$1,100.00$774.87$900.10
13Cleaning and sealing existing joints (438-7001)LF151$11.50$11.50$25.00$11.55$13.04$13.60
14Cleaning and sealing existing joints (CL3) (438-7004)LF164$38.00$38.00$125.00$38.00$43.09$44.80
15Adjusting manholes (utility box) (479-7004)EACH8$1,500.00$400.00$2,500.00$750.00$200.00$1,500.00$1,998.40
16Adjusting manholes (water valve box) (479-7007)EACH12$1,100.00$400.00$1,000.00$750.00$200.00$1,500.00$1,571.80
17Mobilization (500-7001)LS1$703,694$67,500$230,000$350,000$550,000$643,832$325,000
18Barricades, signs and traffic handling (502-7001)MO8$7,000.00$1,900.00$3,150.00$6,000.00$35,000$13,010$40,000
19Portable changeable message sign (503-7001)DAY14$100.00$100.00$178.00$100.00$225.00$150.00$84.10
20TMA (stationary) (505-7001)DAY121$180.00$100.00$340.00$25.00$500.00$250.00$535.60
21TMA (mobile operation) (505-7003)DAY12$500.00$100.00$340.00$25.00$1,000.00$500.00$1,013.10
22Biodegradable erosion control logs (install) (8") (506-7043)LF600$6.00$6.00$5.00$6.00$5.50$6.07$6.50
23Biodegradable erosion control logs (remove) (506-7046)LF600$2.00$0.50$1.00$1.00$1.00$1.10$1.20
24Metal W-beam guard fence (timber post) (540-7001)LF325$30.00$40.00$26.50$26.50$24.50$24.50$31.20
25Driveway terminal anchor section (540-7014)EACH1$1,000.00$1,500.00$1,500.00$1,500.00$1,300.00$1,300.00$1,767.00
26Downstream anchor terminal section (540-7015)EACH5$1,553.00$1,500.00$1,500.00$1,500.00$1,290.00$1,290.00$1,767.00
27Remove metal beam guard fence (542-7001)LF412.50$4.00$3.00$4.20$4.25$2.50$2.50$5.00
28Remove terminal anchor section (542-7002)EACH4$500.00$300.00$150.00$150.00$250.00$250.00$176.70
29Remove downstream anchor terminal (542-7003)EACH1$300.00$150.00$150.00$250.00$250.00$176.70
30Guardrail end treatment (install) (544-7001)EACH2$3,500.00$3,500.00$3,500.00$3,000.00$3,000.00$4,123.00
31Replace existing aluminum signs(type A) (636-7004)SF148$40.00$45.00$72.00$50.00$25.00$72.00$29.50
32Replace existing aluminum signs(type G) (636-7005)SF88$50.00$55.00$40.00$50.00$40.00$40.00$47.10
33Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH114$800.00$700.00$712.00$600.00$515.00$712.00$606.70
34Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH49$900.00$740.00$775.00$650.00$630.00$775.00$742.10
35Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH1$800.00$920.00$1,200.00$1,000.00$920.00$1,178.00
36Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH4$800.00$1,000.00$1,200.00$1,000.00$1,000.00$1,178.00
37Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH31$950.00$775.00$712.00$600.00$500.00$712.00$589.00
38Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH22$985.00$775.00$775.00$650.00$630.00$775.00$742.10
39Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015)EACH4$700.00$800.00$920.00$1,000.00$850.00$920.00$1,001.30
40Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH19$1,260.00$1,150.00$1,083.00$1,500.00$1,300.00$1,083.00$1,531.40
41Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033)EACH2$1,300.00$1,250.00$1,250.00$1,500.00$1,500.00$1,250.00$1,767.00
42Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH3$1,415.53$1,300.00$1,115.00$1,250.00$1,000.00$1,115.00$1,178.00
43In bridge MNT clearance sign assembly(type N) (644-7061)EACH2$3,600.00$1,200.00$2,500.00$2,500.00$2,200.00$2,500.00$2,591.60
44In bridge MNT clearance sign assembly(type S) (644-7062)EACH2$1,200.00$2,500.00$2,500.00$2,200.00$2,500.00$2,591.60
45Remove SM RD SN sup&AM (644-7073)EACH228$155.00$100.00$87.00$100.00$70.00$87.00$82.50
46Remove BRDG MNT clearance sign assembly (644-7074)EACH4$650.00$100.00$300.00$300.00$300.00$300.00$353.40
47Remove SM RD SN sup&AM (sign only) (644-7075)EACH1$50.00$130.00$50.00$30.00$130.00$35.30
48Remove lrsa (647-7003)EACH1$250.00$650.00$2,000.00$1,500.00$650.00$1,767.00
49Install delineator assembly (D-SW)SZ 1(WFLX)SRF (658-7006)EACH9$75.00$100.00$85.00$80.00$100.00$94.20
50Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,900$1.13$0.50$1.00$0.40$0.32$0.85$0.40
51Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,394$1.34$0.60$2.00$0.75$0.50$1.20$0.60
52Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF948$5.00$5.00$5.10$4.98$5.00$5.90
53Work zone pavement marking non-removing (W)(RR crossing) (662-7024)EACH9$250.00$250.00$250.00$250.00$290.00$294.50
54Work zone pavement marking removing (W)24"(solid) (662-7077)LF3,233$12.30$5.00$10.00$4.25$3.99$9.00$4.70
55Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH36,477$2.12$0.50$0.60$1.64$1.50$1.63$3.60
56Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH5,780$2.05$0.75$0.60$1.64$2.00$1.63$3.60
57Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF467$2.00$1.50$1.50$0.85$0.70$1.70$0.80
58Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF1,501$2.25$1.75$2.00$1.25$1.00$2.40$1.20
59Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF22,834$1.50$0.90$1.10$1.00$0.89$1.20$1.10
60Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF13,026$9.00$5.00$6.00$7.50$6.25$8.00$7.40
61Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH163$240.00$135.00$169.00$150.00$145.00$160.00$170.80
62Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH139$215.00$185.00$188.00$175.00$165.00$200.00$194.40
63Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH9$425.00$475.00$400.00$350.00$600.00$412.30
64Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF629$20.00$5.00$6.00$6.50$6.40$8.00$7.50
65Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH7$470.00$375.00$350.00$350.00$200.00$300.00$235.60
66Pavement sler 6" (666-7347)LF53,269$1.16$0.20$0.30$0.35$0.25$0.35$0.30
67Pavement sler 8" (666-7348)LF24,335$0.96$0.28$0.40$0.35$0.30$0.90$0.40
68Pavement sler 24" (666-7352)LF13,655$5.00$2.50$3.00$0.75$0.50$3.00$0.60
69Pavement sler (arrow) (666-7353)EACH163$90.00$75.00$75.00$25.00$15.00$90.00$17.70
70Pavement sler (word) (666-7354)EACH139$70.00$85.00$85.00$25.00$15.00$115.00$17.70
71Pavement sler (med nose) (666-7355)EACH7$149.17$150.00$200.00$100.00$50.00$140.00$58.90
72Pavement sler (RR crossing) (666-7364)EACH9$200.00$350.00$100.00$70.00$260.00$82.50
73Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF30,540$1.40$0.52$0.80$0.70$0.60$0.75$0.70
74Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF38$1.10$0.52$5.00$1.50$1.50$0.70$1.80
75Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF2,520$1.25$0.52$0.80$0.75$0.68$0.75$0.80
76Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF19,704$1.20$0.52$0.80$0.75$0.60$0.70$0.70
77Reflectorized pavement marker type I-C (672-7002)EACH843$6.15$5.00$5.50$5.00$3.90$5.00$4.60
78Reflectorized pavement marker type II-A-A (672-7004)EACH819$5.85$5.00$5.50$5.00$3.90$5.00$4.60
79Reflectorized pavement marker type II-C-R (672-7006)EACH2,026$7.00$5.00$5.50$5.00$3.85$5.00$4.50
80Spot tree trimming / brush removal (752-7002)LF120$7.00$100.00$50.00$38.33$33.00$45.20
81Underseal course (3006-7001)GAL63,100$4.50$4.32$3.80$4.10$3.75$4.64$4.70
82Bonding course (3007-7001)GAL1,858$4.50$4.00$3.90$4.50$3.75$3.54$5.60
83Asphalt plug expansion joint (4028-7001)LF151$150.00$150.00$300.00$150.00$157.50$177.90
84Curb inlet sediment protection (7014-7001)LF2,630$25.00$4.00$9.00$10.00$25.00$9.93$10.60
TxDOT contract A00188134: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy