TxDOT contract A00184686 bid tabulation
Hazard Elimination & Safety, HACKBERRY (In San Antonio on Hackberry to at Steves Ave.). Let by Texas DOT on July 1, 2025, Bexar, San Antonio District. 6 bids received; low bid $1,122,573 by Vaca Underground Utilities Inc, -15% against the engineer's estimate of $1,318,899.
- Owner
- Texas DOT
- Letting
- 01 JUL 2025
- Pay items
- 73
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vaca Underground Utilities Inc | $1,122,573 | Low | -15% |
| 2 | Florida Traffic Control Devices, Inc. | $1,132,760 | +1.0% | -14% |
| 3 | E-Z Bel Construction, LLC | $1,159,667 | +3.0% | -12% |
| 4 | The Levy Company, Inc. | $1,178,297 | +5.0% | -11% |
| 5 | 3LW Civil LLC | $1,294,286 | +15% | -2.0% |
| 6 | Grey Sky Construction LLC | $1,778,914 | +58% | +35% |
Engineer's estimate: $1,318,899.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Vaca Underground Utilities Inc | 2. Florida Traffic Control Devices, Inc. | 3. E-Z Bel Construction, LLC | 4. The Levy Company, Inc. | 5. 3LW Civil LLC | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 110 | $455.82 | $275.00 | $592.00 | $370.00 | $430.00 | $480.00 | $550.00 |
| 2 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $300.00 | $645.00 | $400.00 | $440.00 | $517.50 | $650.00 | |
| 3 | Mobilization (500-7001) | LS | 1 | $112,574 | $95,000 | $109,000 | $95,000 | $117,830 | $128,222 | $145,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $8,000.00 | $3,500.00 | $1,515.00 | $1,200.00 | $7,400.00 | $2,804.52 | $9,500.00 |
| 5 | TMA (stationary) (505-7001) | DAY | 12 | $200.00 | $1,000.00 | $168.00 | $800.00 | $59.00 | $458.59 | $250.00 |
| 6 | Concrete curb (type I) (529-7001) | LF | 51 | $25.00 | $63.00 | $90.00 | $42.00 | $68.33 | $100.00 | |
| 7 | Concrete curb (type II) (529-7002) | LF | 372 | $49.38 | $50.00 | $43.00 | $90.00 | $42.00 | $38.65 | $100.00 |
| 8 | Concrete sidewalks (4") (531-7001) | SY | 84 | $114.00 | $175.00 | $98.00 | $120.00 | $130.00 | $174.90 | $85.00 |
| 9 | Curb ramps (type 1) (531-7005) | EACH | 3 | $3,387.00 | $3,500.00 | $3,044.00 | $3,000.00 | $4,300.00 | $3,078.42 | $3,250.00 |
| 10 | Curb ramps (type 2) (531-7006) | EACH | 15 | $3,781.00 | $3,600.00 | $3,225.00 | $3,000.00 | $4,300.00 | $3,404.80 | $3,250.00 |
| 11 | Curb ramps (type 5) (531-7008) | EACH | 2 | $4,133.00 | $5,500.00 | $4,365.00 | $4,500.00 | $4,300.00 | $4,247.76 | $3,250.00 |
| 12 | Concrete median (536-7002) | SY | 5 | $185.00 | $1,000.00 | $217.00 | $200.00 | $190.00 | $2,582.19 | $250.00 |
| 13 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 1,020 | $24.00 | $15.00 | $14.30 | $25.00 | $30.00 | $4.31 | $25.00 |
| 14 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,085 | $31.00 | $20.00 | $36.90 | $30.00 | $31.00 | $18.29 | $60.00 |
| 15 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 385 | $27.00 | $15.00 | $16.10 | $28.00 | $35.00 | $8.99 | $35.00 |
| 16 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 2,160 | $36.00 | $25.00 | $50.15 | $35.00 | $35.00 | $20.74 | $70.00 |
| 17 | Electrical conductor (no.8) bare (620-7007) | LF | 4,825 | $2.18 | $2.25 | $1.50 | $2.20 | $1.95 | $4.66 | $3.00 |
| 18 | Electrical conductor (no.6) bare (620-7009) | LF | 60 | $2.53 | $2.50 | $1.75 | $2.50 | $2.30 | $5.71 | $3.00 |
| 19 | Electrical conductor (no.6) insulated (620-7010) | LF | 120 | $2.77 | $3.00 | $2.35 | $3.00 | $2.60 | $3.85 | $3.00 |
| 20 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 1,075 | $5.00 | $3.00 | $1.40 | $3.00 | $2.50 | $5.43 | $3.00 |
| 21 | Ground box type D (162922) (624-7007) | EACH | 9 | $1,740.00 | $1,200.00 | $745.00 | $1,000.00 | $1,300.00 | $3,722.72 | $1,350.00 |
| 22 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,733.26 | $1,600.00 | $1,415.00 | $2,000.00 | $1,950.00 | $4,020.24 | $1,500.00 |
| 23 | Aluminum signs (type A) (636-7001) | SF | 23 | $44.00 | $40.00 | $27.00 | $35.00 | $34.00 | $169.97 | $50.00 |
| 24 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 36 | $2.50 | $2.50 | $2.00 | $5.00 | $3.00 | $3.00 | |
| 25 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,054 | $15.00 | $9.10 | $9.20 | $12.00 | $7.50 | $11.25 | $12.00 |
| 26 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 3,232 | $2.00 | $2.50 | $2.45 | $6.00 | $1.95 | $3.62 | $3.00 |
| 27 | Pavement sler 4" (666-7346) | LF | 790 | $0.50 | $0.45 | $0.35 | $0.40 | $1.16 | $3.00 | |
| 28 | Pavement sler 6" (666-7347) | LF | 3,268 | $0.58 | $0.50 | $0.50 | $0.70 | $0.50 | $0.91 | $3.00 |
| 29 | Pavement sler 24" (666-7352) | LF | 1,054 | $4.10 | $1.00 | $0.90 | $1.05 | $3.00 | $1.60 | $12.00 |
| 30 | Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402) | LF | 190 | $1.60 | $1.55 | $2.00 | $1.50 | $4.51 | $2.00 | |
| 31 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 600 | $1.25 | $1.25 | $2.00 | $1.50 | $3.17 | $2.00 | |
| 32 | Reflectorized pavement marker type I-C (672-7002) | EACH | 8 | $15.00 | $12.00 | $30.00 | $8.00 | $15.00 | $6.00 | |
| 33 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 8 | $15.00 | $12.00 | $30.00 | $8.00 | $15.00 | $6.00 | |
| 34 | Eliminating existing PM & markers (4") (677-7001) | LF | 951 | $1.38 | $1.25 | $1.25 | $2.00 | $0.75 | $2.55 | $2.00 |
| 35 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,160 | $2.30 | $2.50 | $2.45 | $6.00 | $2.00 | $4.72 | $6.00 |
| 36 | Eliminating existing PM & markers (24") (677-7008) | LF | 830 | $5.90 | $4.25 | $4.30 | $12.00 | $4.00 | $7.66 | $12.00 |
| 37 | Pavement surface preparation for marking (4") (678-7001) | LF | 790 | $0.25 | $0.25 | $0.75 | $0.20 | $1.54 | $2.00 | |
| 38 | Pavement surface preparation for marking (6") (678-7002) | LF | 3,268 | $0.35 | $0.25 | $0.25 | $1.50 | $0.25 | $1.83 | $3.00 |
| 39 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,054 | $2.50 | $1.00 | $0.90 | $4.50 | $1.00 | $5.87 | $12.00 |
| 40 | Install highway traffic signal (system) (680-7003) | EACH | 3 | $34,385 | $40,000 | $29,400 | $28,000 | $32,200 | $35,034 | $40,000 |
| 41 | Removing traffic signals (680-7004) | EACH | 3 | $6,990.62 | $6,000.00 | $3,865.00 | $6,200.00 | $5,400.00 | $5,355.37 | $12,500 |
| 42 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 25 | $369.00 | $310.00 | $290.00 | $300.00 | $320.00 | $243.21 | $350.00 |
| 43 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $367.00 | $310.00 | $290.00 | $300.00 | $320.00 | $321.76 | $350.00 |
| 44 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 25 | $367.00 | $310.00 | $290.00 | $300.00 | $320.00 | $243.21 | $350.00 |
| 45 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 3 | $350.00 | $310.00 | $290.00 | $300.00 | $320.00 | $321.76 | $350.00 |
| 46 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 25 | $369.00 | $310.00 | $290.00 | $300.00 | $320.00 | $243.21 | $350.00 |
| 47 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 22 | $884.10 | $800.00 | $630.00 | $650.00 | $790.00 | $499.67 | $4,500.00 |
| 48 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 22 | $204.44 | $180.00 | $223.00 | $150.00 | $170.00 | $162.34 | $250.00 |
| 49 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 3 | $329.00 | $250.00 | $325.00 | $250.00 | $260.00 | $411.01 | $350.00 |
| 50 | Traffic signal CBL (type A)(14 AWG)(4 conductor) (684-7030) | LF | 2,170 | $2.23 | $2.60 | $1.80 | $2.25 | $2.00 | $3.20 | $3.00 |
| 51 | Traffic signal CBL (type A)(14 AWG)(9 conductor) (684-7035) | LF | 6,560 | $5.40 | $4.00 | $3.30 | $4.00 | $3.60 | $5.12 | $3.00 |
| 52 | Traffic signal CBL (type A)(16 AWG)(3 conductor) (684-7049) | LF | 2,860 | $1.50 | $2.00 | $1.40 | $2.15 | $1.40 | $4.16 | $3.00 |
| 53 | Ins traffic signal PL AM(S)1 arm(24')ilsn (686-7026) | EACH | 1 | $11,500 | $11,224 | $12,500 | $9,400.00 | $16,463 | $16,000 | |
| 54 | Ins traffic signal PL AM(S)1 arm(28')ilsn (686-7030) | EACH | 3 | $15,166 | $11,600 | $11,500 | $13,000 | $9,900.00 | $17,222 | $16,000 |
| 55 | Ins traffic signal PL AM(S)1 arm(28')lum&ilsn (686-7032) | EACH | 3 | $15,879 | $12,000 | $12,780 | $15,000 | $12,200 | $18,701 | $18,000 |
| 56 | Ins traffic signal PL AM(S)1 arm(32')ilsn (686-7034) | EACH | 1 | $18,666 | $13,250 | $11,900 | $13,750 | $11,000 | $19,313 | $19,000 |
| 57 | Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036) | EACH | 2 | $17,000 | $13,000 | $13,250 | $15,500 | $12,800 | $19,467 | $20,000 |
| 58 | Ins traffic signal PL AM(S)1 arm(36')lum&ilsn (686-7040) | EACH | 1 | $14,000 | $14,500 | $17,000 | $13,900 | $19,900 | $21,000 | |
| 59 | Ins traffic signal PL AM(S)1 arm(48')ilsn (686-7050) | EACH | 1 | $15,000 | $14,900 | $17,100 | $16,100 | $20,673 | $22,000 | |
| 60 | Pedestrian pole assembly (687-7001) | EACH | 20 | $3,597.98 | $3,500.00 | $4,012.50 | $2,500.00 | $3,400.00 | $2,066.34 | $4,500.00 |
| 61 | Pedestrian detect push button (APS) (688-7001) | EACH | 22 | $1,243.04 | $1,000.00 | $940.00 | $1,000.00 | $970.00 | $1,023.69 | $1,850.00 |
| 62 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $3,525.29 | $2,500.00 | $3,725.00 | $2,500.00 | $4,000.00 | $2,679.18 | $6,500.00 |
| 63 | Retrofit det warn surface (surface applied) (5031-7002) | EACH | 2 | $2,000.00 | $850.00 | $850.00 | $430.00 | $979.73 | $1,500.00 | |
| 64 | Ilsn (6 D) (6001-7002) | EACH | 2 | $4,000.00 | $4,580.00 | $4,200.00 | $3,300.00 | $5,463.84 | $5,000.00 | |
| 65 | Ilsn (8D) (6001-7004) | EACH | 10 | $6,500.00 | $4,250.00 | $5,000.00 | $4,750.00 | $3,600.00 | $5,028.04 | $5,500.00 |
| 66 | ITS com CBL (ethernet) (6005-7001) | LF | 440 | $3.00 | $2.00 | $1.80 | $3.00 | $1.40 | $2.43 | $5.00 |
| 67 | Bbu system (external battery cabinet) (6007-7001) | EACH | 3 | $8,666.97 | $10,000 | $11,135 | $9,400.00 | $8,600.00 | $14,433 | $8,500.00 |
| 68 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 3 | $4,881.85 | $3,000.00 | $773.00 | $3,300.00 | $640.00 | $3,446.28 | $3,500.00 |
| 69 | CCTV mount (pole) (6018-7003) | EACH | 3 | $374.14 | $250.00 | $561.00 | $1.00 | $180.00 | $894.06 | $5,000.00 |
| 70 | Feds processor unit (6100-7001) | EACH | 3 | $14,860 | $28,000 | $14,900 | $20,000 | $25,900 | $37,955 | $40,000 |
| 71 | Feds fish eye camera assembly (6100-7002) | EACH | 3 | $3,936.50 | $5,500.00 | $5,850.00 | $4,500.00 | $2,100.00 | $921.03 | $5,000.00 |
| 72 | Lifetime feds data collect & reporting (6100-7004) | EACH | 3 | $7,828.50 | $800.00 | $1,940.00 | $10,000 | $3,900.00 | $269.27 | $5,000.00 |
| 73 | Feds comm cable (ethernet - CAT5E) (6100-7006) | LF | 545 | $2.00 | $0.25 | $11.90 | $3.00 | $2.10 | $2.42 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.