TxDOT letting results, July 9, 2025
23 contracts let by Texas DOT on July 9, 2025, $6,560,468 in low bids, a median of 4 bidders per contract. On the 23 with an engineer's estimate, the low bid came in under it 18 times; median low bid -18% against the estimate.
- Owner
- Texas DOT
- Contracts
- 23
- Low bids, total
- $6,560,468
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00214576 | CRASH CUSHION ATTENUATOR REPAIR, IH0035W (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | Dallas District | 6 | Fireman Excavating, Inc. | $506,220 | $590,096 | +17% | -29% | TxDOT |
| A00213803 | METAL BEAM GUARD FENCE REPAIR, IH0035W (VARIOUS ROADWAYS IN DENTON to DENTON COUNTY MAINTENANCE SECTION) | Dallas District | 6 | Ross Sa Enterprise LLC | $488,902 | $559,025 | +14% | -47% | TxDOT |
| A00215292 | LARGE SIGN REPLACEMENT, IH0030 (IH0345 to East of Loop 12) | Dallas District | 6 | Synergy Signs & Services LLC | $485,525 | $554,464 | +14% | -27% | TxDOT |
| A00215529 | LARGE SIGN REPLACEMENT, IH0030 (EAST OF LOOP 12 to ROCKWALL COUNTY LINE) | Dallas District | 6 | Synergy Signs & Services LLC | $450,404 | $508,911 | +13% | -25% | TxDOT |
| A00214635 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, FM0545 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION) | Dallas District | 3 | Jagoe-Public Company | $441,920 | $465,246 | +5.0% | -7.0% | TxDOT |
| A00214050 | BRIDGE PREVENTATIVE MAINTENANCE, SH0021 (Various Locations to Various Locations) | Lufkin District | 2 | Ace Contractors, Inc. | $425,610 | $578,077 | +36% | -18% | TxDOT |
| A00216197 | HOT MIX, SH0006 (Various to Various) | Bryan District | 4 | Big Creek Construction, LTD. | $411,000 | $423,000 | +3.0% | -6.0% | TxDOT |
| A00214129 | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Various to Various) | Bryan District | 6 | Cross Plus Construction, LLC | $405,447 | $427,172 | +5.0% | -10% | TxDOT |
| A00213487 | CRASH CUSHION ATTENUATOR REPAIR, US0075 (VARIOUS LOCATIONS IN THE COLLIN to COUNTY MAINTENANCE SECTION) | Dallas District | 5 | Fireman Excavating, Inc. | $353,325 | $401,679 | +14% | -41% | TxDOT |
| A00216255 | MOWING HIGHWAY RIGHT OF WAY, US0183 (VARIOUS to VARIOUS) | Brownwood District | 2 | T&L Cleaning Services LLC | $340,500 | $363,018 | +7.0% | -17% | TxDOT |
| A00214632 | CRASH CUSHION ATTENUATOR REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | Dallas District | 3 | Fireman Excavating, Inc. | $306,115 | $524,865 | +71% | -67% | TxDOT |
| A00216117 | WINTER WEATHER MATERIAL, SH0006 (Various to Various) | Bryan District | 1 | NSG Logistics, LLC | $284,179 | -6.0% | TxDOT | ||
| A00210116 | CRACK SEAL, US0079 (VARIOUS LOCATIONS IN WILLIAMSON to TRAVIS AND MILAM COUNTIES) | Austin District | 3 | Fyl Enterprises, LLC | $265,381 | $349,884 | +32% | +4.0% | TxDOT |
| A00210118 | CRACK SEAL, US0281 (VARIOUS LOCATIONS IN BURNET, BLANCO to LLANO, MASON, AND GILLESPIE COUNTIES) | Austin District | 4 | Fyl Enterprises, LLC | $235,391 | $331,874 | +41% | -26% | TxDOT |
| A00210117 | CRACK SEAL, US0290 (VARIOUS LOCATIONS IN BASTROP to LEE AND CALDWELL COUNTIES) | Austin District | 3 | Fyl Enterprises, LLC | $214,797 | $308,150 | +43% | +2.0% | TxDOT |
| A00211700 | BRIDGE JOINT CLEANING AND SEALING, US0075 (VARIOUS ROADWAYS to IN THE COLLIN MAINTENANCE SECTION) | Dallas District | 6 | Road Doctors LLC | $199,431 | $201,686 | +1.0% | -12% | TxDOT |
| A00210122 | CRACK SEAL, FM2001 (VARIOUS LOCATIONS IN HAYS to AND TRAVIS COUNTIES) | Austin District | 3 | Fyl Enterprises, LLC | $176,920 | $351,617 | +99% | +1.0% | TxDOT |
| A00215040 | CULVERT CLEANING, IH0010 (Various to Various) | Beaumont District | 4 | Xtreme Pro Cleaning LLC | $161,120 | $309,700 | +92% | -40% | TxDOT |
| A00215735 | FLEXIBLE BASE, FM2728 (Kaufman/Rockwall to Maintenance Section) | Dallas District | 5 | Knife River Corporation - South | $117,813 | $121,800 | +3.0% | +8.0% | TxDOT |
| A00214300 | TREE TRIMMING AND BRUSH REMOVAL, FM0667 (Various Roadways to Navarro County Maintenance Section) | Dallas District | 11 | Austin Barricade Company, L.L.C. | $103,008 | $118,239 | +15% | -32% | TxDOT |
| A00214347 | TREE TRIMMING AND BRUSH REMOVAL, FM0112 (VARIOUS LOCATIONS IN WILLIAMSON to TRAVIS AND MILAM COUNTIES) | Austin District | 7 | Looks Great Services of MS, Inc. | $93,836 | $105,088 | +12% | -50% | TxDOT |
| A00213804 | TREE TRIMMING AND BRUSH REMOVAL, FM0156 (VARIOUS ROADWAYS IN DENTON to DENTON COUNTY MAINTENANCE SECTION) | Dallas District | 11 | Allies Land Clearing | $76,625 | $80,671 | +5.0% | -23% | TxDOT |
| A00215736 | LIME, FM2728 (Kaufman/Rockwall to Maintenance Section) | Dallas District | 1 | Touchstone Resources, LLC | $17,000 | +26% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.