TxDOT contract A00212454 bid tabulation
Rehabilitate Existing Roadway, FM 1461 (CR 123 to Franklin Branch Road). Let by Texas DOT on July 1, 2026, Collin, Dallas District. 9 bids received; low bid $4,381,938 by Jagoe-Public Company, -1.7% against the engineer's estimate of $4,456,443.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 99
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jagoe-Public Company | $4,381,938 | Low | -2.0% |
| 2 | Quality Excavation, LLC | $4,584,905 | +5.0% | +3.0% |
| 3 | STX Civil | $4,764,089 | +9.0% | +7.0% |
| 4 | Foutsco Paving Company, LLC | $4,836,112 | +10% | +9.0% |
| 5 | Overland Corporation | $5,035,333 | +15% | +13% |
| 6 | Austin Bridge & Road Services, LP | $5,072,824 | +16% | +14% |
| 7 | Altus Construction LLC | $5,573,028 | +27% | +25% |
| 8 | Texas Materials Group, Inc. | $5,656,574 | +29% | +27% |
| 9 | Ed Bell Construction Company | $5,688,610 | +30% | +28% |
Engineer's estimate: $4,456,443.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jagoe-Public Company | 2. Quality Excavation, LLC | 3. STX Civil | 4. Foutsco Paving Company, LLC | 5. Overland Corporation | 6. Austin Bridge & Road Services, LP |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 102.43 | $700.00 | $80.00 | $950.00 | $216.00 | $100.00 | $1,968.00 | $990.49 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 161 | $26.00 | $27.00 | $19.00 | $23.00 | $17.60 | $50.00 | $65.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 253 | $18.00 | $38.00 | $12.75 | $43.00 | $10.90 | $50.00 | $63.00 |
| 4 | Remove (8"-14") TRT/untrt base & asphalt pavement (105-7059) | SY | 2,848 | $15.00 | $8.00 | $21.25 | $9.00 | $12.49 | $30.00 | $29.05 |
| 5 | Excavation (roadway) (110-7001) | CY | 2,841 | $18.00 | $15.00 | $12.50 | $14.00 | $50.00 | $16.12 | $8.49 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 3,639 | $23.00 | $26.00 | $16.75 | $16.00 | $75.00 | $12.66 | $16.83 |
| 7 | Backfill (type A or B) (134-7004) | STA | 102.43 | $185.00 | $260.00 | $155.00 | $310.00 | $100.00 | $220.35 | $336.23 |
| 8 | Blading (150-7001) | STA | 102.43 | $185.00 | $110.00 | $200.00 | $125.00 | $1.00 | $203.09 | $59.56 |
| 9 | Drill seed (permanent_rural_clay) (164-7010) | SY | 71,422 | $0.20 | $0.17 | $0.17 | $0.50 | $0.10 | $0.82 | $0.30 |
| 10 | Drill seed (temporary_warm_cool) (164-7015) | SY | 71,422 | $0.20 | $0.16 | $0.16 | $0.50 | $0.01 | $0.81 | $0.23 |
| 11 | Vegetative watering (168-7001) | TGL | 21,250 | $2.50 | $0.01 | $6.25 | $16.00 | $0.01 | $0.01 | $0.01 |
| 12 | SP mixes SP-B PG64-22 (344-7001) | TON | 7,250 | $115.00 | $100.00 | $127.27 | $142.00 | $160.00 | $120.00 | $162.20 |
| 13 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 3,642 | $132.00 | $110.00 | $137.87 | $154.00 | $151.00 | $130.00 | $173.75 |
| 14 | Tack coat (344-7077) | GAL | 4,652 | $2.50 | $2.75 | $3.18 | $5.00 | $0.10 | $3.00 | $4.20 |
| 15 | Flexible pavement structure repair(12") (351-7011) | SY | 2,102 | $120.00 | $90.00 | $136.79 | $55.00 | $135.00 | $150.00 | $125.00 |
| 16 | Plane & text asphalt concrete pavement(2") (354-7019) | SY | 21,431 | $2.75 | $2.75 | $2.43 | $5.50 | $1.00 | $2.29 | $3.00 |
| 17 | Cut & restore asphalt paving (400-7008) | SY | 481 | $100.00 | $170.00 | $140.00 | $210.00 | $200.00 | $203.74 | $121.00 |
| 18 | Cem stabil BKFL (400-7010) | CY | 466 | $220.00 | $240.00 | $190.00 | $190.00 | $180.00 | $157.28 | $180.00 |
| 19 | Flowable backfill (401-7001) | CY | 35 | $280.00 | $235.00 | $215.00 | $223.80 | $145.86 | $300.00 | |
| 20 | Trench excavation protection (402-7001) | LF | 82 | $10.00 | $11.00 | $2.25 | $10.00 | $1.50 | $15.00 | $10.00 |
| 21 | Temporary special shoring (403-7001) | SF | 1,924.50 | $70.00 | $32.00 | $60.00 | $47.00 | $45.00 | $10.00 | $45.00 |
| 22 | Riprap (concrete)(4 in) (432-7001) | CY | 20 | $625.00 | $800.00 | $510.00 | $800.00 | $495.50 | $693.39 | $583.00 |
| 23 | Riprap (mow strip)(4 in) (432-7013) | CY | 46 | $750.00 | $1,200.00 | $520.00 | $860.00 | $577.93 | $676.99 | $605.00 |
| 24 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 97 | $220.00 | $310.00 | $220.00 | $155.00 | $129.10 | $270.76 | $150.00 |
| 25 | Riprap (stone common)(grout)(12 in) (432-7038) | CY | 40 | $280.00 | $380.00 | $295.00 | $202.00 | $200.00 | $317.59 | $200.00 |
| 26 | Riprap (stone protection)(12 in) (432-7041) | CY | 333 | $230.00 | $350.00 | $175.00 | $166.00 | $139.50 | $172.52 | $160.00 |
| 27 | Concrete box culvert (10 FT X 6 FT) (462-7034) | LF | 213 | $1,500.00 | $1,400.00 | $980.00 | $1,600.00 | $1,500.00 | $1,165.45 | $1,500.00 |
| 28 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 36 | $1,100.00 | $770.00 | $875.00 | $595.50 | $1,180.61 | $850.00 | |
| 29 | RC pipe (CL III)(18 in) (464-7003) | LF | 902 | $55.00 | $49.00 | $95.00 | $62.00 | $60.00 | $107.48 | $60.00 |
| 30 | RC pipe (CL III)(24 in) (464-7005) | LF | 174 | $85.00 | $120.00 | $134.00 | $88.00 | $127.20 | $152.36 | $145.00 |
| 31 | RC pipe (CL III)(36 in) (464-7009) | LF | 13 | $180.00 | $260.00 | $240.00 | $185.00 | $252.20 | $547.79 | $285.00 |
| 32 | RC pipe (CL III)(48 in) (464-7011) | LF | 131 | $260.00 | $270.00 | $285.00 | $302.00 | $350.00 | $248.30 | $350.00 |
| 33 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 2 | $10,000 | $13,000 | $6,100.00 | $7,380.00 | $3,996.20 | $10,754 | $7,500.00 |
| 34 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 4 | $12,000 | $17,000 | $8,584.00 | $12,500 | $7,042.40 | $10,790 | $13,000 |
| 35 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $26,000 | $18,840 | $12,500 | $10,811 | $23,473 | $12,500 | |
| 36 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 1 | $27,000 | $22,500 | $14,800 | $12,356 | $24,698 | $15,000 | |
| 37 | Wingwall (PW - 1) (HW=12 FT) (466-7182) | EACH | 2 | $50,000 | $97,000 | $91,000 | $80,000 | $80,000 | $88,016 | $80,000 |
| 38 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 54 | $820.00 | $1,500.00 | $1,100.00 | $1,100.00 | $950.00 | $1,223.41 | $950.00 |
| 39 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $1,200.00 | $1,400.00 | $1,200.00 | $1,050.00 | $1,207.30 | $1,131.63 | $2,000.00 |
| 40 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 8 | $1,400.00 | $1,800.00 | $1,300.00 | $1,550.00 | $1,597.70 | $1,651.56 | $2,500.00 |
| 41 | Removing structure (set) (496-7004) | EACH | 1 | $125.00 | $470.00 | $221.00 | $620.00 | $347.40 | $844.32 | $600.00 |
| 42 | Removing structure (wingwall) (496-7005) | EACH | 4 | $2,000.00 | $3,200.00 | $1,126.00 | $1,480.00 | $1,500.00 | $1,037.79 | $1,500.00 |
| 43 | Removing structure (headwall) (496-7006) | EACH | 1 | $930.00 | $6,000.00 | $1,627.00 | $1,480.00 | $1,087.90 | $1,037.79 | $1,500.00 |
| 44 | Removing structure (pipe) (496-7007) | LF | 145 | $20.00 | $37.00 | $26.00 | $40.00 | $24.90 | $63.48 | $40.00 |
| 45 | Removing structure (box culvert) (496-7008) | LF | 66 | $85.00 | $230.00 | $145.00 | $300.00 | $122.30 | $214.58 | $300.00 |
| 46 | Remove STR (driveway culvert) (496-7038) | EACH | 27 | $450.00 | $1,250.00 | $710.00 | $1,200.00 | $198.40 | $5,000.00 | $1,200.00 |
| 47 | Mobilization (500-7001) | LS | 1 | $421,040 | $485,000 | $458,000 | $381,302 | $350,000 | $503,533 | $558,011 |
| 48 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $15,000 | $35,000 | $8,565.00 | $2,100.00 | $39,000 | $15,094 | $26,714 |
| 49 | Portable changeable message sign (503-7002) | EACH | 3 | $18,000 | $11,250 | $18,000 | $6,200.00 | $10,000 | $20,568 | $6,514.56 |
| 50 | TMA (stationary) (505-7001) | DAY | 316 | $180.00 | $50.00 | $196.00 | $230.00 | $1.00 | $591.05 | $1.04 |
| 51 | TMA (mobile operation) (505-7002) | HR | 80 | $90.00 | $35.00 | $119.00 | $200.00 | $1.00 | $0.01 | $108.41 |
| 52 | Rock filter dams (install) (type 2) (506-7002) | LF | 260 | $50.00 | $40.00 | $42.42 | $25.00 | $41.00 | $40.00 | $39.10 |
| 53 | Rock filter dams (install) (type 3) (506-7003) | LF | 120 | $70.00 | $60.00 | $58.33 | $35.00 | $88.00 | $55.00 | $91.00 |
| 54 | Rock filter dams (remove) (506-7011) | LF | 380 | $12.00 | $11.00 | $11.67 | $7.00 | $12.00 | $11.00 | $12.00 |
| 55 | Construction exits (install) (type 1) (506-7020) | SY | 172 | $40.00 | $39.00 | $41.36 | $31.00 | $15.00 | $39.00 | $35.70 |
| 56 | Construction exits (remove) (506-7024) | SY | 172 | $12.00 | $10.00 | $10.61 | $8.00 | $5.00 | $10.00 | $12.00 |
| 57 | Temporary sediment control fence (install) (506-7039) | LF | 1,316 | $4.50 | $5.00 | $5.30 | $5.00 | $4.00 | $5.00 | $3.50 |
| 58 | Temporary sediment control fence (remove) (506-7041) | LF | 1,316 | $1.00 | $1.00 | $1.06 | $1.00 | $1.00 | $1.00 | $0.75 |
| 59 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,727 | $5.50 | $6.00 | $6.36 | $5.00 | $1.00 | $6.00 | $4.50 |
| 60 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,727 | $1.50 | $1.00 | $1.06 | $1.00 | $0.50 | $1.00 | $1.00 |
| 61 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 743 | $40.00 | $17.00 | $46.24 | $105.00 | $40.00 | $70.81 | $36.84 |
| 62 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 743 | $14.00 | $19.00 | $27.15 | $10.00 | $22.00 | $11.25 | $17.41 |
| 63 | Driveways (concrete) (hes) (530-7007) | SY | 273 | $140.00 | $110.00 | $125.00 | $247.00 | $94.20 | $142.50 | $125.00 |
| 64 | Driveways (ACP) (530-7010) | SY | 2,477 | $80.00 | $60.00 | $80.60 | $50.00 | $65.00 | $93.20 | $80.00 |
| 65 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 19,425 | $0.50 | $0.30 | $0.32 | $0.30 | $0.30 | $0.30 | $0.23 |
| 66 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 8,325 | $0.50 | $0.30 | $0.32 | $0.30 | $0.30 | $0.30 | $0.23 |
| 67 | Metal W-beam guard fence (timber post) (540-7001) | LF | 650 | $25.00 | $22.00 | $23.86 | $32.00 | $23.15 | $24.50 | $23.15 |
| 68 | Short radius (28") (540-7013) | LF | 23 | $35.00 | $32.00 | $26.51 | $95.00 | $39.00 | $39.00 | $39.00 |
| 69 | Downstream anchor terminal section (540-7015) | EACH | 1 | $2,250.00 | $1,200.00 | $1,272.66 | $2,100.00 | $1,540.00 | $1,540.00 | $1,540.00 |
| 70 | Remove metal beam guard fence (542-7001) | LF | 125 | $4.00 | $4.00 | $3.18 | $14.00 | $2.00 | $2.00 | $2.00 |
| 71 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,200.00 | $3,100.00 | $3,128.62 | $3,900.00 | $3,196.00 | $3,196.00 | $3,196.00 |
| 72 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $275.00 | $400.00 | $265.14 | $370.00 | $200.00 | $200.00 | $200.00 |
| 73 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $950.00 | $1,200.00 | $2,121.10 | $615.00 | $585.00 | $585.00 | $230.86 |
| 74 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 4 | $9,000.00 | $8,000.00 | $9,544.95 | $7,800.00 | $6,925.00 | $6,925.00 | $7,500.84 |
| 75 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 10 | $270.00 | $220.00 | $233.32 | $370.00 | $275.00 | $275.00 | $275.00 |
| 76 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 2 | $320.00 | $240.00 | $254.53 | $550.00 | $315.00 | $315.00 | $315.00 |
| 77 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $950.00 | $700.00 | $689.36 | $800.00 | $775.00 | $775.00 | $775.00 |
| 78 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 40 | $750.00 | $700.00 | $710.57 | $550.00 | $615.00 | $615.00 | $615.00 |
| 79 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $920.00 | $900.00 | $901.47 | $615.00 | $699.00 | $699.00 | $699.00 |
| 80 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $39.00 | $31.00 | $74.24 | $55.00 | $25.00 | $25.00 | $25.00 |
| 81 | Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248) | EACH | 16 | $30.00 | $70.00 | $47.73 | $185.00 | $99.00 | $99.00 | $99.00 |
| 82 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 20,383 | $0.50 | $0.18 | $0.19 | $0.36 | $0.21 | $0.18 | $0.21 |
| 83 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 117 | $2.00 | $2.00 | $2.07 | $1.25 | $0.55 | $1.95 | $0.55 |
| 84 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 775 | $0.80 | $0.40 | $0.43 | $1.25 | $0.50 | $0.41 | $0.50 |
| 85 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 6 | $125.00 | $120.00 | $127.27 | $80.00 | $40.00 | $120.00 | $40.00 |
| 86 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 6 | $150.00 | $130.00 | $135.75 | $80.00 | $45.00 | $128.00 | $45.00 |
| 87 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 22,579 | $0.50 | $0.18 | $0.19 | $0.31 | $0.21 | $0.18 | $0.21 |
| 88 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 100 | $1.50 | $2.00 | $2.98 | $6.00 | $5.00 | $1.00 | $0.54 |
| 89 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,276 | $1.50 | $2.00 | $2.76 | $4.00 | $1.00 | $1.00 | $0.81 |
| 90 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 117 | $1.50 | $1.75 | $1.91 | $1.25 | $1.00 | $1.80 | $1.00 |
| 91 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 775 | $1.00 | $1.00 | $1.03 | $1.25 | $1.00 | $0.97 | $1.00 |
| 92 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 93 | $6.00 | $7.00 | $7.21 | $9.00 | $9.00 | $6.80 | $9.00 |
| 93 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 6 | $200.00 | $130.00 | $141.05 | $190.00 | $160.00 | $133.00 | $160.00 |
| 94 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 2 | $360.00 | $190.00 | $200.45 | $280.00 | $179.00 | $189.00 | $179.00 |
| 95 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 6 | $275.00 | $160.00 | $169.69 | $190.00 | $169.00 | $160.00 | $169.00 |
| 96 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 20,383 | $1.00 | $0.60 | $0.65 | $0.63 | $0.53 | $0.61 | $0.53 |
| 97 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 22,579 | $1.00 | $0.70 | $0.68 | $0.63 | $0.53 | $0.64 | $0.53 |
| 98 | Reflectorized pavement marker type I-C (672-7002) | EACH | 75 | $6.00 | $4.75 | $4.98 | $11.50 | $4.00 | $4.70 | $4.00 |
| 99 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 267 | $6.00 | $4.75 | $4.98 | $11.50 | $3.90 | $4.70 | $3.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.