TxDOT contract A00212454 bid tabulation

Rehabilitate Existing Roadway, FM 1461 (CR 123 to Franklin Branch Road). Let by Texas DOT on July 1, 2026, Collin, Dallas District. 9 bids received; low bid $4,381,938 by Jagoe-Public Company, -1.7% against the engineer's estimate of $4,456,443.

Owner
Texas DOT
Letting
01 JUL 2026
Pay items
99
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jagoe-Public Company$4,381,938Low-2.0%
2Quality Excavation, LLC$4,584,905+5.0%+3.0%
3STX Civil$4,764,089+9.0%+7.0%
4Foutsco Paving Company, LLC$4,836,112+10%+9.0%
5Overland Corporation$5,035,333+15%+13%
6Austin Bridge & Road Services, LP$5,072,824+16%+14%
7Altus Construction LLC$5,573,028+27%+25%
8Texas Materials Group, Inc.$5,656,574+29%+27%
9Ed Bell Construction Company$5,688,610+30%+28%
TxDOT contract A00212454: bids by rank

Engineer's estimate: $4,456,443.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Jagoe-Public Company2. Quality Excavation, LLC3. STX Civil4. Foutsco Paving Company, LLC5. Overland Corporation6. Austin Bridge & Road Services, LP
1Preparing row (100-7002)STA102.43$700.00$80.00$950.00$216.00$100.00$1,968.00$990.49
2Removing concrete (riprap) (104-7006)SY161$26.00$27.00$19.00$23.00$17.60$50.00$65.00
3Removing concrete (driveways) (104-7011)SY253$18.00$38.00$12.75$43.00$10.90$50.00$63.00
4Remove (8"-14") TRT/untrt base & asphalt pavement (105-7059)SY2,848$15.00$8.00$21.25$9.00$12.49$30.00$29.05
5Excavation (roadway) (110-7001)CY2,841$18.00$15.00$12.50$14.00$50.00$16.12$8.49
6Embankment (final)(DC)(type C) (132-7006)CY3,639$23.00$26.00$16.75$16.00$75.00$12.66$16.83
7Backfill (type A or B) (134-7004)STA102.43$185.00$260.00$155.00$310.00$100.00$220.35$336.23
8Blading (150-7001)STA102.43$185.00$110.00$200.00$125.00$1.00$203.09$59.56
9Drill seed (permanent_rural_clay) (164-7010)SY71,422$0.20$0.17$0.17$0.50$0.10$0.82$0.30
10Drill seed (temporary_warm_cool) (164-7015)SY71,422$0.20$0.16$0.16$0.50$0.01$0.81$0.23
11Vegetative watering (168-7001)TGL21,250$2.50$0.01$6.25$16.00$0.01$0.01$0.01
12SP mixes SP-B PG64-22 (344-7001)TON7,250$115.00$100.00$127.27$142.00$160.00$120.00$162.20
13SP mixes SP-C sac-B PG64-22 (344-7011)TON3,642$132.00$110.00$137.87$154.00$151.00$130.00$173.75
14Tack coat (344-7077)GAL4,652$2.50$2.75$3.18$5.00$0.10$3.00$4.20
15Flexible pavement structure repair(12") (351-7011)SY2,102$120.00$90.00$136.79$55.00$135.00$150.00$125.00
16Plane & text asphalt concrete pavement(2") (354-7019)SY21,431$2.75$2.75$2.43$5.50$1.00$2.29$3.00
17Cut & restore asphalt paving (400-7008)SY481$100.00$170.00$140.00$210.00$200.00$203.74$121.00
18Cem stabil BKFL (400-7010)CY466$220.00$240.00$190.00$190.00$180.00$157.28$180.00
19Flowable backfill (401-7001)CY35$280.00$235.00$215.00$223.80$145.86$300.00
20Trench excavation protection (402-7001)LF82$10.00$11.00$2.25$10.00$1.50$15.00$10.00
21Temporary special shoring (403-7001)SF1,924.50$70.00$32.00$60.00$47.00$45.00$10.00$45.00
22Riprap (concrete)(4 in) (432-7001)CY20$625.00$800.00$510.00$800.00$495.50$693.39$583.00
23Riprap (mow strip)(4 in) (432-7013)CY46$750.00$1,200.00$520.00$860.00$577.93$676.99$605.00
24Riprap (stone common)(dry)(12 in) (432-7031)CY97$220.00$310.00$220.00$155.00$129.10$270.76$150.00
25Riprap (stone common)(grout)(12 in) (432-7038)CY40$280.00$380.00$295.00$202.00$200.00$317.59$200.00
26Riprap (stone protection)(12 in) (432-7041)CY333$230.00$350.00$175.00$166.00$139.50$172.52$160.00
27Concrete box culvert (10 FT X 6 FT) (462-7034)LF213$1,500.00$1,400.00$980.00$1,600.00$1,500.00$1,165.45$1,500.00
28Concrete box culvert (6 FT X 5 FT)(extend) (462-7068)LF36$1,100.00$770.00$875.00$595.50$1,180.61$850.00
29RC pipe (CL III)(18 in) (464-7003)LF902$55.00$49.00$95.00$62.00$60.00$107.48$60.00
30RC pipe (CL III)(24 in) (464-7005)LF174$85.00$120.00$134.00$88.00$127.20$152.36$145.00
31RC pipe (CL III)(36 in) (464-7009)LF13$180.00$260.00$240.00$185.00$252.20$547.79$285.00
32RC pipe (CL III)(48 in) (464-7011)LF131$260.00$270.00$285.00$302.00$350.00$248.30$350.00
33Headwall (CH - PW - 0) (diameter= 36 in) (466-7105)EACH2$10,000$13,000$6,100.00$7,380.00$3,996.20$10,754$7,500.00
34Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH4$12,000$17,000$8,584.00$12,500$7,042.40$10,790$13,000
35Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH1$26,000$18,840$12,500$10,811$23,473$12,500
36Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH1$27,000$22,500$14,800$12,356$24,698$15,000
37Wingwall (PW - 1) (HW=12 FT) (466-7182)EACH2$50,000$97,000$91,000$80,000$80,000$88,016$80,000
38Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH54$820.00$1,500.00$1,100.00$1,100.00$950.00$1,223.41$950.00
39Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$1,200.00$1,400.00$1,200.00$1,050.00$1,207.30$1,131.63$2,000.00
40Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH8$1,400.00$1,800.00$1,300.00$1,550.00$1,597.70$1,651.56$2,500.00
41Removing structure (set) (496-7004)EACH1$125.00$470.00$221.00$620.00$347.40$844.32$600.00
42Removing structure (wingwall) (496-7005)EACH4$2,000.00$3,200.00$1,126.00$1,480.00$1,500.00$1,037.79$1,500.00
43Removing structure (headwall) (496-7006)EACH1$930.00$6,000.00$1,627.00$1,480.00$1,087.90$1,037.79$1,500.00
44Removing structure (pipe) (496-7007)LF145$20.00$37.00$26.00$40.00$24.90$63.48$40.00
45Removing structure (box culvert) (496-7008)LF66$85.00$230.00$145.00$300.00$122.30$214.58$300.00
46Remove STR (driveway culvert) (496-7038)EACH27$450.00$1,250.00$710.00$1,200.00$198.40$5,000.00$1,200.00
47Mobilization (500-7001)LS1$421,040$485,000$458,000$381,302$350,000$503,533$558,011
48Barricades, signs and traffic handling (502-7001)MO10$15,000$35,000$8,565.00$2,100.00$39,000$15,094$26,714
49Portable changeable message sign (503-7002)EACH3$18,000$11,250$18,000$6,200.00$10,000$20,568$6,514.56
50TMA (stationary) (505-7001)DAY316$180.00$50.00$196.00$230.00$1.00$591.05$1.04
51TMA (mobile operation) (505-7002)HR80$90.00$35.00$119.00$200.00$1.00$0.01$108.41
52Rock filter dams (install) (type 2) (506-7002)LF260$50.00$40.00$42.42$25.00$41.00$40.00$39.10
53Rock filter dams (install) (type 3) (506-7003)LF120$70.00$60.00$58.33$35.00$88.00$55.00$91.00
54Rock filter dams (remove) (506-7011)LF380$12.00$11.00$11.67$7.00$12.00$11.00$12.00
55Construction exits (install) (type 1) (506-7020)SY172$40.00$39.00$41.36$31.00$15.00$39.00$35.70
56Construction exits (remove) (506-7024)SY172$12.00$10.00$10.61$8.00$5.00$10.00$12.00
57Temporary sediment control fence (install) (506-7039)LF1,316$4.50$5.00$5.30$5.00$4.00$5.00$3.50
58Temporary sediment control fence (remove) (506-7041)LF1,316$1.00$1.00$1.06$1.00$1.00$1.00$0.75
59Biodegradable erosion control logs (install) (12") (506-7044)LF1,727$5.50$6.00$6.36$5.00$1.00$6.00$4.50
60Biodegradable erosion control logs (remove) (506-7046)LF1,727$1.50$1.00$1.06$1.00$0.50$1.00$1.00
61Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF743$40.00$17.00$46.24$105.00$40.00$70.81$36.84
62Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF743$14.00$19.00$27.15$10.00$22.00$11.25$17.41
63Driveways (concrete) (hes) (530-7007)SY273$140.00$110.00$125.00$247.00$94.20$142.50$125.00
64Driveways (ACP) (530-7010)SY2,477$80.00$60.00$80.60$50.00$65.00$93.20$80.00
65Mill rumble strips (asphalt) (shoulder) (533-7001)LF19,425$0.50$0.30$0.32$0.30$0.30$0.30$0.23
66Mill rumble strips (asphalt) (centerline) (533-7002)LF8,325$0.50$0.30$0.32$0.30$0.30$0.30$0.23
67Metal W-beam guard fence (timber post) (540-7001)LF650$25.00$22.00$23.86$32.00$23.15$24.50$23.15
68Short radius (28") (540-7013)LF23$35.00$32.00$26.51$95.00$39.00$39.00$39.00
69Downstream anchor terminal section (540-7015)EACH1$2,250.00$1,200.00$1,272.66$2,100.00$1,540.00$1,540.00$1,540.00
70Remove metal beam guard fence (542-7001)LF125$4.00$4.00$3.18$14.00$2.00$2.00$2.00
71Guardrail end treatment (install) (544-7001)EACH3$3,200.00$3,100.00$3,128.62$3,900.00$3,196.00$3,196.00$3,196.00
72Guardrail end treatment (remove) (544-7003)EACH4$275.00$400.00$265.14$370.00$200.00$200.00$200.00
73Crash cushion attenuator (remove) (545-7004)EACH4$950.00$1,200.00$2,121.10$615.00$585.00$585.00$230.86
74Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$9,000.00$8,000.00$9,544.95$7,800.00$6,925.00$6,925.00$7,500.84
75Mailbox install-S (TWW-post) type 4 (560-7008)EACH10$270.00$220.00$233.32$370.00$275.00$275.00$275.00
76Mailbox install-D (TWW-post) type 4 (560-7009)EACH2$320.00$240.00$254.53$550.00$315.00$315.00$315.00
77Mailbox install-M (TWW-post) type 4 (560-7010)EACH1$950.00$700.00$689.36$800.00$775.00$775.00$775.00
78Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH40$750.00$700.00$710.57$550.00$615.00$615.00$615.00
79Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$920.00$900.00$901.47$615.00$699.00$699.00$699.00
80Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH10$39.00$31.00$74.24$55.00$25.00$25.00$25.00
81Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248)EACH16$30.00$70.00$47.73$185.00$99.00$99.00$99.00
82Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF20,383$0.50$0.18$0.19$0.36$0.21$0.18$0.21
83Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF117$2.00$2.00$2.07$1.25$0.55$1.95$0.55
84Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF775$0.80$0.40$0.43$1.25$0.50$0.41$0.50
85Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH6$125.00$120.00$127.27$80.00$40.00$120.00$40.00
86Work zone pavement marking non-removing(W)(word) (662-7030)EACH6$150.00$130.00$135.75$80.00$45.00$128.00$45.00
87Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF22,579$0.50$0.18$0.19$0.31$0.21$0.18$0.21
88Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH100$1.50$2.00$2.98$6.00$5.00$1.00$0.54
89Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH2,276$1.50$2.00$2.76$4.00$1.00$1.00$0.81
90Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF117$1.50$1.75$1.91$1.25$1.00$1.80$1.00
91Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF775$1.00$1.00$1.03$1.25$1.00$0.97$1.00
92Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF93$6.00$7.00$7.21$9.00$9.00$6.80$9.00
93Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH6$200.00$130.00$141.05$190.00$160.00$133.00$160.00
94Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH2$360.00$190.00$200.45$280.00$179.00$189.00$179.00
95Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH6$275.00$160.00$169.69$190.00$169.00$160.00$169.00
96Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF20,383$1.00$0.60$0.65$0.63$0.53$0.61$0.53
97Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF22,579$1.00$0.70$0.68$0.63$0.53$0.64$0.53
98Reflectorized pavement marker type I-C (672-7002)EACH75$6.00$4.75$4.98$11.50$4.00$4.70$4.00
99Reflectorized pavement marker type II-A-A (672-7004)EACH267$6.00$4.75$4.98$11.50$3.90$4.70$3.90
TxDOT contract A00212454: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy