TxDOT contract A00208402 bid tabulation

CULVERT EXTENSION & CROSS DRAINAGE, BU0277A (BU 0277A; FM 91 to and FM 172). Let by Texas DOT on August 8, 2025, Wichita, Wichita Falls District. 4 bids received; low bid $1,562,345 by STX Civil, +7.4% against the engineer's estimate of $1,454,616.

Owner
Texas DOT
Letting
08 AUG 2025
Pay items
41
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1STX Civil$1,562,345Low+7.0%
2Built Right Construction of Oklahoma, LLC$1,697,940+9.0%+17%
3A. L. Helmcamp, Inc.$1,770,484+13%+22%
4Earth Builders, L.P.$1,983,194+27%+36%
TxDOT contract A00208402: bids by rank

Engineer's estimate: $1,454,616.

Bid tabulation

LinePay itemUnitQuantityEstimate1. STX Civil2. Built Right Construction of Oklahoma, LLC3. A. L. Helmcamp, Inc.4. Earth Builders, L.P.
1Preparing row (100-7002)STA4$15,000$1,800.00$5,000.00$18,000$14,000
2Excavation (channel) (110-7002)CY237$29.62$30.00$150.00$28.00$50.00
3Embankment (final)(OC)(type B) (132-7003)CY1,793$27.57$45.00$50.00$62.00$65.00
4Broadcast seed (temporary_warm) (164-7005)SY1,307$0.16$0.80$2.00$1.40$10.00
5Broadcast seed (temporary_cool) (164-7006)SY1,307$0.19$0.80$2.00$1.30$10.00
6Soil ret BLKT(SL_mod_sand_long) (169-7004)SY847$5.00$2.00$6.00$2.30$7.00
7Temporary special shoring (403-7001)SF2,303$34.91$25.00$150.00$50.00$20.00
8Class C concrete (rail foundation) (420-7052)CY3$850.00$2,500.00$1,000.00$2,300.00$650.00
9Riprap (stone common)(dry)(12 in) (432-7031)CY152$175.00$200.00$300.00$280.00$360.00
10Rail (type SSTR) (450-7024)LF54$75.40$240.00$300.00$320.00$400.00
11Concrete box culvert (4 FT X 2 FT)(extend) (462-7058)LF90$950.00$800.00$1,200.00$680.00$910.00
12Concrete box culvert (4 FT X 4 FT)(extend) (462-7060)LF120$1,019.32$1,000.00$1,200.00$760.00$950.00
13Concrete box culvert (5 FT X 2 FT)(extend) (462-7061)LF22$1,100.00$1,100.00$1,200.00$860.00$1,000.00
14Concrete box culvert (6 FT X 6 FT)(extend) (462-7069)LF142$1,474.29$1,500.00$1,200.00$1,200.00$1,270.00
15Concrete box culvert (6 FT X 3.5 FT)(extend) (462-7121)LF13$1,250.00$1,200.00$1,200.00$1,200.00$1,600.00
16Concrete box culvert (5 FT X 2.5 FT)(extend) (462-7128)LF29$950.00$1,150.00$1,200.00$915.00$1,250.00
17Concrete box culvert (8 FT X 3.5 FT)(extend) (462-7129)LF13$1,400.00$2,000.00$1,200.00$1,300.00$1,750.00
18Headwall (CH - PW - 0) (diameter= 60 in) (466-7109)EACH2$20,000$32,000$10,000$33,000$35,000
19Wingwall (PW - 2) (HW=3 FT) (466-7187)EACH2$6,900.00$13,000$10,000$8,900.00$14,000
20Wingwall (PW - 2) (HW=4 FT) (466-7188)EACH7$9,429.00$16,000$10,000$12,000$22,000
21Wingwall (PW - 2) (HW=5 FT) (466-7189)EACH4$21,311$20,000$10,000$17,000$23,000
22Wingwall (PW - 2) (HW=6 FT) (466-7190)EACH2$35,908$26,000$15,000$22,000$25,000
23Wingwall (PW - 2) (HW=7 FT) (466-7191)EACH1$30,000$30,000$15,000$44,000$48,000
24Wingwall (PW - 2) (HW=8 FT) (466-7192)EACH3$23,624$35,000$20,000$43,000$50,000
25Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(C) (467-7097)EACH1$12,500$15,000$10,000$11,000$10,000
26Clean existing culverts (480-7001)EACH5$4,292.19$4,000.00$10,000$2,800.00$8,000.00
27Removing structure (wingwall) (496-7005)EACH20$1,100.00$2,800.00$2,000.00$830.00$8,000.00
28Mobilization (500-7001)LS1$129,056$120,000$160,000$170,000$190,000
29Barricades, signs and traffic handling (502-7001)MO7$5,000.00$10,000$2,200.00$30,000$8,000.00
30Portable changeable message sign (503-7002)EACH4$18,356$6,500.00$2,500.00$10,000$12,000
31One-way traffic control (port traffic signal) (510-7003)MO4$6,489.60$6,500.00$7,500.00$7,500.00$8,000.00
32Portable concrete traffic barrier (des source)(low prof)(type 1) (512-7021)LF160$21.38$40.00$55.00$60.00$30.00
33Portable concrete traffic barrier (des source)(low prof)(type 2) (512-7022)LF40$25.00$40.00$65.00$100.00$30.00
34Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF480$12.09$35.00$30.00$25.00$15.00
35Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF120$30.91$35.00$30.00$45.00$15.00
36Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045)LF160$10.00$30.00$55.00$26.00$30.00
37Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046)LF40$10.00$30.00$65.00$55.00$30.00
38Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002)EACH6$43.05$120.00$50.00$55.00$40.00
39Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$30.05$60.00$50.00$55.00$20.00
40Install object marker assembly (OM-2Z)(WFLX)(wap) (658-7062)EACH22$104.24$150.00$50.00$170.00$100.00
41Work zone pavement marking SHT terminal remove (W)(4") (662-7115)LF640$1.07$15.00$7.00$10.00$20.00
TxDOT contract A00208402: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy