TxDOT contract A00220224 bid tabulation

Rehabilitate Existing Roadway, SH 121 (Hickory Dr. NB to Hickory Dr. SB). Let by Texas DOT on August 6, 2026, Tarrant, Fort Worth District. 5 bids received; low bid $3,202,525 by Foutsco Paving Company, LLC, +9.5% against the engineer's estimate of $2,924,978.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
64
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Foutsco Paving Company, LLC$3,202,525Low+9.0%
2Austin Bridge & Road Services, LP$3,256,791+2.0%+11%
3Texas Materials Group, Inc.$3,346,231+4.0%+14%
4Peachtree Construction, LTD.$3,400,513+6.0%+16%
5Jagoe-Public Company$3,535,171+10%+21%
TxDOT contract A00220224: bids by rank

Engineer's estimate: $2,924,978.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Foutsco Paving Company, LLC2. Austin Bridge & Road Services, LP3. Texas Materials Group, Inc.4. Peachtree Construction, LTD.5. Jagoe-Public Company
1Preparing row (100-7002)STA10$2,000.00$300.00$885.00$1.00$925.00$950.00
2Removing concrete (curb or curb & gutter) (104-7018)LF2,500$12.50$7.00$10.00$13.00$16.50$18.00
3Backfill (type A or B) (134-7004)STA25$152.00$150.00$330.79$400.00$550.00$1,570.00
4Asphalt (AC-20-5TR) (316-7007)GAL29,464$3.68$5.00$3.53$3.15$4.20$4.55
5Aggregate (type-B, GR-4)(sac-B) (316-7173)CY670$155.00$250.00$330.00$220.00$155.00$195.00
6SP mixes SP-C sac-A PG70-28 (344-7024)TON12,706$126.00$142.00$137.60$145.00$140.00$125.00
7SP mixes SP-D PG64-22 (level-UP) (344-7044)TON1,271$115.00$130.00$100.50$145.00$145.00$115.00
8Flexible pavement structure repair(8") (351-7007)SY2,210$72.00$75.50$81.55$72.00$88.00$80.00
9Planing asphalt concrete pavement (2" to 4 1/2") (354-7081)SY73,660$2.40$1.50$2.00$2.00$3.60$3.75
10Riprap (mow strip)(4 in) (432-7013)CY75$680.00$650.00$707.05$700.00$725.00$1,200.00
11Adjusting manholes (479-7001)EACH5$2,250.00$2,500.00$2,500.00$2,000.00$2,100.00$2,000.00
12Mobilization (500-7001)LS1$200,000$150,000$358,247$225,000$225,000$392,000
13Barricades, signs and traffic handling (502-7001)MO4$12,500$50,000$12,414$30,000$30,000$40,250
14Portable changeable message sign (503-7002)EACH2$5,000.00$5,000.00$3,288.60$11,000$7,500.00$20,000
15TMA (stationary) (505-7001)DAY80$108.00$1.00$1.05$1.00$90.00$220.00
16TMA (mobile operation) (505-7003)DAY10$175.00$1.00$1.05$1.00$225.00$270.00
17Temporary sediment control fence (install) (506-7039)LF1,100$4.00$0.10$3.75$5.00$4.75$3.75
18Temporary sediment control fence (remove) (506-7041)LF1,100$2.00$0.10$1.10$2.00$1.95$1.25
19Biodegradable erosion control logs (install) (8") (506-7043)LF500$4.00$0.10$5.50$8.00$4.55$6.00
20Biodegradable erosion control logs (remove) (506-7046)LF500$2.00$0.10$1.25$2.00$1.85$1.25
21Concrete curb & gutter (type II) (529-7009)LF2,500$45.00$23.90$23.90$60.00$37.00$50.00
22Metal W-beam guard fence (timber post) (540-7001)LF1,100$22.00$25.00$25.00$25.00$26.50$26.00
23Short radius (28") (540-7013)LF300$34.00$26.00$26.00$26.00$27.50$27.00
24Downstream anchor terminal section (540-7015)EACH4$1,150.00$1,200.00$1,200.00$1,200.00$1,250.00$1,200.00
25Remove metal beam guard fence (542-7001)LF1,400$2.62$2.50$2.50$2.50$2.60$2.50
26Remove terminal anchor section (542-7002)EACH4$205.00$150.00$150.00$150.00$160.00$150.00
27Guardrail end treatment (install) (544-7001)EACH4$3,000.00$3,000.00$3,000.00$3,000.00$3,200.00$3,100.00
28Guardrail end treatment (remove) (544-7003)EACH4$235.11$250.00$250.00$250.00$260.00$260.00
29Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,200$0.20$0.30$0.37$0.30$0.32$0.40
30Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF21,700$0.20$0.26$0.37$0.26$0.28$0.40
31Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF1,950$1.00$0.48$0.60$0.48$0.50$0.60
32Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF50$1.10$2.00$3.00$2.00$2.15$3.00
33Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF480$2.40$4.00$5.00$4.00$4.25$5.00
34Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH4$40.00$55.00$100.00$55.00$59.00$100.00
35Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH4$100.00$80.00$125.00$80.00$85.00$130.00
36Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH5$95.00$80.00$125.00$80.00$85.00$130.00
37Work zone pavement marking non-removing(W)(word) (662-7030)EACH8$40.00$58.00$100.00$58.00$62.00$100.00
38Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF22,110$0.20$0.26$0.37$0.26$0.28$0.40
39Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH524$0.73$1.00$0.50$3.00$10.00$2.00
40Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,000$0.95$0.88$0.91$0.88$0.95$0.90
41Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF50$3.37$3.00$3.65$3.00$3.20$3.75
42Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF480$6.66$6.90$6.55$6.90$7.40$7.00
43Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH4$159.00$155.00$127.00$155.00$165.00$130.00
44Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH4$241.61$190.00$181.00$190.00$200.00$190.00
45Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH5$300.00$190.00$185.00$190.00$200.00$190.00
46Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH8$175.00$155.00$153.00$155.00$165.00$160.00
47Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069)EACH4$620.00$1,100.00$900.00$1,100.00$1,175.00$900.00
48Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072)EACH4$780.00$1,600.00$900.00$1,600.00$1,700.00$900.00
49Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF4,200$0.50$0.56$0.70$1.00$0.60$0.70
50Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF21,700$0.55$0.56$0.70$0.56$0.60$0.70
51Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF22,110$0.48$0.56$0.70$0.56$0.60$0.70
52Pavement sler 6" (666-7347)LF48,010$0.10$0.20$0.10$0.20$0.21$0.10
53Pavement sler 8" (666-7348)LF1,000$0.12$0.22$0.15$0.22$0.24$0.15
54Pavement sler 12" (666-7350)LF50$5.00$0.50$0.50$0.50$0.55$0.50
55Pavement sler 24" (666-7352)LF480$0.40$0.75$0.70$0.75$0.80$0.70
56Pavement sler (arrow) (666-7353)EACH4$28.00$10.00$15.00$10.00$10.50$15.00
57Pavement sler (word) (666-7354)EACH8$28.00$10.00$18.00$10.00$10.50$19.00
58Pavement sler (double arrow) (666-7356)EACH4$62.00$15.00$15.00$15.00$16.00$15.00
59Pavement sler (uturn arrow) (666-7358)EACH5$35.00$15.00$18.00$15.00$16.00$19.00
60Pavement sler (entr gore) (666-7361)EACH4$120.00$200.00$30.00$200.00$215.00$31.00
61Pavement sler (exit gore) (666-7362)EACH4$140.00$400.00$30.00$400.00$425.00$31.00
62Reflectorized pavement marker type I-C (672-7002)EACH55$3.89$4.00$3.50$4.00$4.30$3.50
63Reflectorized pavement marker type II-A-A (672-7004)EACH221$5.00$4.00$3.50$4.00$4.30$3.50
64Reflectorized pavement marker type II-C-R (672-7006)EACH230$6.15$4.00$3.50$4.00$4.30$3.50
TxDOT contract A00220224: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy