TxDOT contract A00066946 bid tabulation
Rehabilitate Existing Roadway, FM 75 (MONTE CARLO BLVD to FM 1827). Let by Texas DOT on October 6, 2026, Collin, Dallas District. 8 bids received; low bid $4,906,593 by A. K. Gillis & Sons, LLC, -17% against the engineer's estimate of $5,938,082.
- Owner
- Texas DOT
- Letting
- 06 OCT 2026
- Pay items
- 91
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. K. Gillis & Sons, LLC | $4,906,593 | Low | -17% |
| 2 | Quality Excavation, LLC | $5,412,732 | +10% | -9.0% |
| 3 | D. L. Lennon Incorporated - Contractor | $5,870,764 | +20% | -1.0% |
| 4 | Ed Bell Construction Company | $6,037,621 | +23% | +2.0% |
| 5 | Texas Materials Group, Inc. | $6,141,750 | +25% | +3.0% |
| 6 | Eurovia Atlantic Coast LLC | $6,288,447 | +28% | +6.0% |
| 7 | Overland Corporation | $6,548,052 | +33% | +10% |
| 8 | Jagoe-Public Company | $6,624,320 | +35% | +12% |
Engineer's estimate: $5,938,082.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. K. Gillis & Sons, LLC | 2. Quality Excavation, LLC | 3. D. L. Lennon Incorporated - Contractor | 4. Ed Bell Construction Company | 5. Texas Materials Group, Inc. | 6. Eurovia Atlantic Coast LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 155.82 | $650.00 | $570.92 | $685.00 | $1,758.92 | $350.00 | $333.73 | $650.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 512 | $16.00 | $12.00 | $13.50 | $12.00 | $15.75 | $30.00 | $16.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 1,014 | $16.00 | $12.00 | $12.50 | $12.00 | $31.50 | $45.00 | $19.00 |
| 4 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 369 | $14.00 | $8.13 | $27.04 | $14.00 | $15.00 | $25.00 | $13.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 8,491 | $18.00 | $17.00 | $11.00 | $19.00 | $17.50 | $43.89 | $25.00 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,680 | $20.00 | $17.00 | $17.00 | $26.00 | $25.00 | $26.74 | $140.00 |
| 7 | Backfill (type A or B) (134-7004) | STA | 155.82 | $275.00 | $200.00 | $177.00 | $268.00 | $200.00 | $106.68 | $315.00 |
| 8 | Blading (150-7001) | STA | 155.82 | $290.00 | $200.00 | $255.00 | $300.00 | $200.00 | $38.69 | $65.00 |
| 9 | Drill seed (permanent_rural_clay) (164-7010) | SY | 89,832 | $0.15 | $0.15 | $0.16 | $0.15 | $0.36 | $0.15 | $0.36 |
| 10 | Drill seed (temporary_warm_cool) (164-7015) | SY | 89,832 | $0.13 | $0.14 | $0.15 | $0.14 | $0.31 | $0.14 | $0.31 |
| 11 | Vegetative watering (168-7001) | TGL | 13,363 | $0.50 | $1.00 | $7.00 | $0.01 | $0.10 | $1.75 | $0.25 |
| 12 | FL BS (compacted in place)(type D GR 1-2) (4") (247-7033) | SY | 61,567 | $16.00 | $10.79 | $10.25 | $15.00 | $12.00 | $10.95 | $13.35 |
| 13 | FL BS (roadway del) (type D GR 1-2) (247-7209) | TON | 350 | $50.00 | $54.13 | $54.80 | $65.00 | $40.00 | $52.74 | $46.00 |
| 14 | Rework BS metal (type C)(12")(ord comp) (251-7055) | SY | 54,473 | $3.00 | $2.75 | $2.70 | $3.65 | $2.50 | $2.47 | $3.15 |
| 15 | Cement (275-7001) | TON | 522 | $250.00 | $217.00 | $232.00 | $285.00 | $225.00 | $246.40 | $220.00 |
| 16 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 63,032 | $2.50 | $2.25 | $3.20 | $3.30 | $2.50 | $1.28 | $2.95 |
| 17 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 18,470 | $5.50 | $5.99 | $4.29 | $6.00 | $6.25 | $4.96 | $5.25 |
| 18 | Asphalt (CRS-2P) (316-7012) | GAL | 10,260 | $4.50 | $5.01 | $4.78 | $6.00 | $4.70 | $3.80 | $4.40 |
| 19 | Asphalt (RC-250) (316-7016) | GAL | 8,208 | $5.00 | $6.06 | $6.19 | $6.00 | $5.70 | $3.80 | $5.70 |
| 20 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 8,208 | $4.50 | $4.46 | $4.40 | $6.00 | $4.25 | $3.80 | $4.05 |
| 21 | Aggregate (type-B or L, GR-3)(sac-B) (316-7244) | CY | 391 | $150.00 | $159.41 | $309.62 | $158.00 | $286.00 | $488.55 | $285.00 |
| 22 | Aggregate (type-B or L, GR-5) (316-7251) | CY | 164 | $140.00 | $153.31 | $304.19 | $148.00 | $281.00 | $851.14 | $280.00 |
| 23 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 9,905 | $125.00 | $118.00 | $128.38 | $128.00 | $140.00 | $144.41 | $142.00 |
| 24 | Plane & text asphalt concrete pavement(3") (354-7020) | SY | 54,473 | $3.00 | $1.87 | $3.03 | $3.68 | $1.00 | $2.98 | $1.75 |
| 25 | Cut & restoring pavement (400-7006) | SY | 432 | $95.00 | $100.00 | $97.00 | $100.00 | $130.00 | $85.00 | $210.00 |
| 26 | Cem stabil BKFL (400-7010) | CY | 170 | $240.00 | $250.00 | $152.00 | $250.00 | $275.00 | $235.00 | $235.00 |
| 27 | Flowable backfill (401-7001) | CY | 44 | $300.00 | $250.00 | $245.00 | $250.00 | $500.00 | $253.00 | $253.00 |
| 28 | Trench excavation protection (402-7001) | LF | 460 | $13.00 | $15.00 | $3.56 | $15.00 | $10.00 | $1.00 | $1.00 |
| 29 | Riprap (concrete)(4 in) (432-7001) | CY | 1 | $700.00 | $800.00 | $1,102.00 | $800.00 | $1,575.00 | $1,000.00 | $2,053.00 |
| 30 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 33 | $265.00 | $273.20 | $162.00 | $300.00 | $250.00 | $300.00 | $364.00 |
| 31 | Riprap (stone protection)(12 in) (432-7041) | CY | 601 | $300.00 | $273.20 | $156.00 | $300.00 | $275.00 | $260.00 | $295.00 |
| 32 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 257 | $360.00 | $320.00 | $352.00 | $320.00 | $255.00 | $287.00 | $287.00 |
| 33 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 56 | $600.00 | $650.00 | $546.00 | $650.00 | $515.00 | $484.00 | $484.00 |
| 34 | Concrete box culvert (5 FT X 3 FT)(extend) (462-7062) | LF | 14 | $900.00 | $800.00 | $592.00 | $800.00 | $825.00 | $1,050.00 | $1,050.00 |
| 35 | RC pipe (CL III)(18 in) (464-7003) | LF | 716 | $65.00 | $45.00 | $90.00 | $45.00 | $65.00 | $64.00 | $64.00 |
| 36 | RC pipe (CL III)(24 in) (464-7005) | LF | 553 | $80.00 | $78.00 | $111.00 | $78.00 | $100.00 | $76.00 | $76.00 |
| 37 | RC pipe (CL III)(30 in) (464-7007) | LF | 60 | $115.00 | $115.00 | $144.00 | $115.00 | $140.00 | $109.00 | $109.00 |
| 38 | RC pipe (CL III)(36 in) (464-7009) | LF | 112 | $175.00 | $170.00 | $222.00 | $170.00 | $175.00 | $136.00 | $136.00 |
| 39 | RC pipe (CL III)(42 in) (464-7010) | LF | 69 | $250.00 | $215.00 | $265.00 | $215.00 | $200.00 | $184.00 | $184.00 |
| 40 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 3 | $6,300.00 | $6,500.00 | $4,685.00 | $6,500.00 | $8,400.00 | $6,405.00 | $6,405.00 |
| 41 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 6 | $10,000 | $8,500.00 | $7,347.00 | $8,500.00 | $10,500 | $13,110 | $13,110 |
| 42 | Headwall (CH - PW - S) (diameter= 42 in) (466-7121) | EACH | 1 | $12,000 | $12,000 | $8,838.00 | $12,000 | $11,025 | $16,340 | $16,340 |
| 43 | Wingwall (FW - S) (HW=4 FT) (466-7160) | EACH | 1 | $22,000 | $10,000 | $11,926 | $10,000 | $10,775 | $1,180.00 | $11,080 |
| 44 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 4 | $18,000 | $12,000 | $10,435 | $12,000 | $18,000 | $13,370 | $13,370 |
| 45 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 7 | $25,000 | $15,000 | $12,139 | $15,000 | $21,000 | $21,330 | $21,330 |
| 46 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 44 | $1,000.00 | $750.00 | $1,240.00 | $750.00 | $550.00 | $1,287.00 | $1,287.00 |
| 47 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 30 | $1,300.00 | $1,300.00 | $1,475.00 | $1,300.00 | $950.00 | $1,597.00 | $1,597.00 |
| 48 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 4 | $2,500.00 | $2,600.00 | $2,200.00 | $2,600.00 | $2,000.00 | $2,674.00 | $2,674.00 |
| 49 | Removing structure (inlet) (496-7002) | EACH | 3 | $800.00 | $500.00 | $584.00 | $500.00 | $1,100.00 | $800.00 | $800.00 |
| 50 | Removing structure (set) (496-7004) | EACH | 70 | $100.00 | $75.00 | $244.00 | $75.00 | $195.00 | $120.00 | $120.00 |
| 51 | Removing structure (wingwall) (496-7005) | EACH | 2 | $1,250.00 | $1,000.00 | $1,515.00 | $1,000.00 | $2,500.00 | $1,200.00 | $1,200.00 |
| 52 | Removing structure (headwall) (496-7006) | EACH | 17 | $1,250.00 | $800.00 | $1,000.00 | $800.00 | $1,250.00 | $1,200.00 | $1,200.00 |
| 53 | Removing structure (pipe) (496-7007) | LF | 1,443 | $15.00 | $8.00 | $25.50 | $8.00 | $21.00 | $8.00 | $8.00 |
| 54 | Mobilization (500-7001) | LS | 1 | $525,714 | $371,989 | $500,000 | $348,725 | $579,000 | $491,600 | $550,000 |
| 55 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $15,000 | $13,633 | $3,250.00 | $12,289 | $42,500 | $34,843 | $25,250 |
| 56 | Portable changeable message sign (503-7002) | EACH | 3 | $18,500 | $12,500 | $13,000 | $32,000 | $9,000.00 | $1,879.52 | $17,000 |
| 57 | TMA (stationary) (505-7001) | DAY | 189 | $175.00 | $100.00 | $204.07 | $150.00 | $75.00 | $220.00 | $325.00 |
| 58 | TMA (mobile operation) (505-7003) | DAY | 5 | $175.00 | $100.00 | $920.95 | $300.00 | $800.00 | $200.00 | $715.00 |
| 59 | Rock filter dams (install) (type 2) (506-7002) | LF | 800 | $40.00 | $40.00 | $42.59 | $40.00 | $69.23 | $40.00 | $38.70 |
| 60 | Rock filter dams (install) (type 3) (506-7003) | LF | 180 | $65.00 | $65.00 | $69.20 | $65.00 | $74.55 | $65.00 | $99.31 |
| 61 | Rock filter dams (remove) (506-7011) | LF | 980 | $10.00 | $10.00 | $10.65 | $10.00 | $42.60 | $10.00 | $13.00 |
| 62 | Construction exits (install) (type 1) (506-7020) | SY | 187 | $30.00 | $10.00 | $40.46 | $38.00 | $34.61 | $38.00 | $42.19 |
| 63 | Construction exits (remove) (506-7024) | SY | 187 | $10.00 | $1.00 | $10.65 | $10.00 | $17.57 | $10.00 | $11.00 |
| 64 | Temporary sediment control fence (install) (506-7039) | LF | 4,368 | $4.00 | $4.25 | $4.52 | $4.25 | $3.20 | $4.25 | $3.11 |
| 65 | Temporary sediment control fence (remove) (506-7041) | LF | 4,368 | $1.00 | $0.50 | $0.53 | $0.50 | $1.60 | $0.50 | $0.84 |
| 66 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 735 | $5.00 | $5.00 | $5.32 | $5.00 | $4.79 | $5.00 | $3.75 |
| 67 | Biodegradable erosion control logs (remove) (506-7046) | LF | 735 | $1.00 | $1.00 | $1.06 | $1.00 | $2.40 | $1.00 | $1.11 |
| 68 | Driveways (concrete) (530-7006) | SY | 328 | $125.00 | $100.00 | $130.00 | $110.00 | $125.00 | $128.00 | $143.00 |
| 69 | Driveways (ACP) (530-7010) | SY | 3,238 | $75.00 | $39.26 | $85.00 | $40.00 | $49.00 | $65.85 | $35.00 |
| 70 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 28,148 | $0.30 | $0.22 | $0.23 | $1.18 | $0.19 | $0.22 | $0.33 |
| 71 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 8,744 | $0.30 | $0.22 | $0.23 | $1.18 | $0.19 | $0.22 | $0.34 |
| 72 | Remove metal beam guard fence (542-7001) | LF | 393 | $4.00 | $10.00 | $2.93 | $5.00 | $2.93 | $2.75 | $7.55 |
| 73 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 8 | $225.00 | $230.00 | $367.31 | $200.00 | $367.43 | $225.00 | $230.00 |
| 74 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $500.00 | $550.00 | $846.42 | $1,500.00 | $846.68 | $650.00 | $550.00 |
| 75 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 29 | $625.00 | $660.00 | $712.27 | $700.00 | $712.49 | $675.00 | $660.00 |
| 76 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 8 | $700.00 | $800.00 | $761.24 | $800.00 | $761.48 | $700.00 | $800.00 |
| 77 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $825.00 | $800.00 | $825.13 | $950.00 | $825.38 | $800.00 | $800.00 |
| 78 | Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249) | EACH | 20 | $80.00 | $175.00 | $250.20 | $200.00 | $250.28 | $175.00 | $175.00 |
| 79 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 29,665 | $0.25 | $0.23 | $0.24 | $0.40 | $0.43 | $0.23 | $0.23 |
| 80 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 17,145 | $0.25 | $0.23 | $0.24 | $0.40 | $0.43 | $0.23 | $0.23 |
| 81 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 390 | $2.50 | $2.45 | $3.08 | $8.00 | $8.00 | $0.12 | $1.75 |
| 82 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 312 | $2.00 | $1.60 | $1.70 | $1.25 | $1.33 | $1.60 | $1.60 |
| 83 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,490 | $1.00 | $0.90 | $0.96 | $0.97 | $1.03 | $0.90 | $0.90 |
| 84 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 223 | $6.00 | $6.65 | $7.08 | $6.75 | $7.19 | $6.65 | $6.65 |
| 85 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 28 | $120.00 | $129.00 | $137.34 | $145.00 | $154.43 | $129.00 | $129.00 |
| 86 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 28 | $140.00 | $155.00 | $165.02 | $170.00 | $181.05 | $155.00 | $155.00 |
| 87 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 29,665 | $0.50 | $0.60 | $0.64 | $0.52 | $0.55 | $0.60 | $0.60 |
| 88 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,725 | $0.50 | $0.60 | $0.64 | $0.60 | $0.64 | $0.60 | $0.60 |
| 89 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 25,566 | $0.50 | $0.60 | $0.64 | $0.42 | $0.45 | $0.60 | $0.60 |
| 90 | Reflectorized pavement marker type I-C (672-7002) | EACH | 164 | $4.00 | $4.50 | $4.79 | $4.00 | $4.26 | $4.50 | $4.50 |
| 91 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 472 | $4.00 | $4.50 | $4.79 | $4.00 | $4.26 | $4.50 | $4.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 6, 2026. Compiled by Mirage Metrics.