TxDOT contract A00188996 bid tabulation

Rehabilitate Existing Roadway, FM 2933 (CR 335 to FM 545). Let by Texas DOT on July 2, 2026, Collin, Dallas District. 6 bids received; low bid $11,064,754 by A. K. Gillis & Sons, LLC, -11% against the engineer's estimate of $12,398,052.

Owner
Texas DOT
Letting
02 JUL 2026
Pay items
120
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1A. K. Gillis & Sons, LLC$11,064,754Low-11%
2D. L. Lennon Incorporated - Contractor$11,837,269+7.0%-5.0%
3Jagoe-Public Company$11,981,310+8.0%-3.0%
4H. V. Caver, Inc.$12,685,374+15%+2.0%
5Ed Bell Construction Company$12,987,440+17%+5.0%
6Overland Corporation$14,130,847+28%+14%
TxDOT contract A00188996: bids by rank

Engineer's estimate: $12,398,052.

Bid tabulation

LinePay itemUnitQuantityEstimate1. A. K. Gillis & Sons, LLC2. D. L. Lennon Incorporated - Contractor3. Jagoe-Public Company4. H. V. Caver, Inc.5. Ed Bell Construction Company6. Overland Corporation
1Preparing row (100-7002)STA297.81$700.00$605.00$512.00$525.00$472.40$1,100.00$4,605.99
2Removing concrete (driveways) (104-7011)SY925$12.00$12.00$12.00$22.00$20.00$25.00$26.06
3Removing concrete (flume) (104-7041)SY18$12.00$12.00$12.00$60.00$20.00$75.00$45.21
4Remove stab base and asphalt pavement (6"-20") (105-7123)SY3,174$12.50$18.90$15.00$4.75$16.00$12.00$10.48
5Excavation (roadway) (110-7001)CY13,236$18.00$17.50$14.10$18.00$15.00$10.00$18.52
6Excavation (channel) (110-7002)CY32$200.00$100.00$325.00$130.00$31.25$75.00$59.25
7Embankment (final)(DC)(type C) (132-7006)CY11,563$23.00$17.50$17.30$18.00$20.00$10.00$10.76
8Backfill (type A or B) (134-7004)STA297.14$275.00$300.00$450.00$250.00$225.00$400.00$263.97
9Blading (150-7001)STA297.14$330.00$300.00$300.00$80.00$165.00$300.00$188.61
10Drill seed (permanent_rural_clay) (164-7010)SY233,514$0.12$0.12$0.12$0.10$0.12$0.13$0.85
11Drill seed (temporary_warm_cool) (164-7015)SY233,514$0.10$0.10$0.10$0.05$0.10$0.12$0.12
12Vegetative watering (168-7001)TGL69,480$0.01$0.50$0.01$0.10$0.01$0.50$0.20
13FL BS (roadway del) (type D GR 1-2) (247-7209)TON9,335$45.00$50.91$53.00$34.00$37.25$45.00$30.99
14FL BS (compacted in place)(type D GR-1-2)(9") (247-7340)SY101,204$25.00$22.71$22.75$24.00$23.25$23.50$18.96
15Rework BS metal (type C)(6")(ord comp) (251-7049)SY9,918$2.50$3.00$3.00$3.00$20.00$1.60$4.00
16Rework BS metal (type C)(9")(ord comp) (251-7085)SY57,145$3.00$3.00$5.60$2.25$18.75$1.70$4.00
17Cement (275-7001)TON531$250.00$235.00$325.00$200.00$224.00$275.00$225.00
18Cement TRT (existing material)(6") (275-7002)SY5,804$4.00$2.75$6.00$4.00$5.00$2.80$4.00
19Cement TRT (existing material & new base)(6") (275-7006)SY98,706$2.50$2.75$3.30$2.50$5.00$1.40$4.00
20Prime coat(MC-30 or AE-P) (310-7013)GAL30,363$5.50$6.27$5.00$3.50$5.00$6.05$3.85
21Asphalt (CRS-2P) (316-7012)GAL16,876$4.50$5.31$4.00$4.50$5.66$5.15$6.00
22Asphalt (RC-250) (316-7016)GAL13,499$5.10$6.05$5.00$5.50$7.40$5.60$8.00
23Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL13,499$4.50$4.98$4.00$4.50$5.33$5.00$8.00
24Aggregate (type-B or L, GR-3)(sac-B) (316-7244)CY647$165.00$158.85$195.00$275.00$128.12$315.00$225.00
25Aggregate (type-B or L, GR-5) (316-7251)CY277$130.00$152.75$179.00$290.00$127.07$330.00$300.00
26SP mixes SP-C sac-B PG64-22 (344-7011)TON17,512$125.00$122.51$132.51$115.00$136.00$125.00$120.00
27Tack coat (344-7077)GAL16$10.00$125.00$140.00$25.00$2.00$15.00$2.85
28Plane & text asphalt concrete pavement(6" to 8") (354-7012)SY16,234$4.00$3.02$7.60$6.00$5.00$10.00$2.36
29Plane & text asphalt concrete pavement(3") (354-7020)SY60,063$3.00$1.42$5.83$3.00$2.50$5.00$2.16
30Cut & restoring pavement (400-7006)SY348$100.00$90.00$90.00$70.00$200.00$165.00$250.00
31Cem stabil BKFL (400-7010)CY186$250.00$225.00$225.00$230.00$145.00$218.00$223.40
32Flowable backfill (401-7001)CY30$305.00$250.00$250.00$210.00$289.17$577.00$351.35
33Trench excavation protection (402-7001)LF307$15.00$12.00$12.00$10.00$8.00$31.50$27.43
34Temporary special shoring (403-7001)SF1,951$60.00$15.00$15.00$34.00$20.00$18.25$35.00
35Riprap (mow strip)(4 in) (432-7013)CY101$700.00$700.00$700.00$1,000.00$486.37$750.00$720.95
36Riprap (stone protection)(12 in) (432-7041)CY741$350.00$324.18$255.00$310.00$212.60$286.00$150.00
37Riprap (stone protection)(18 in) (432-7043)CY604$260.00$324.18$255.00$310.00$200.00$298.00$225.00
38Riprap (stone protection)(24 in) (432-7045)CY172$300.00$324.18$255.00$390.00$200.00$305.00$250.00
39Retrofit rail (type T631) (451-7020)LF160$110.00$82.00$132.00$110.00$82.00$95.85$82.00
40Concrete box culvert (5 FT X 5 FT) (462-7009)LF214$550.00$600.00$600.00$450.00$512.50$406.00$699.85
41Concrete box culvert (9 FT X 6 FT)(extend) (462-7083)LF6$2,000.00$1,400.00$1,400.00$2,100.00$1,949.00$1,818.00$1,200.00
42RC pipe (CL III)(18 in) (464-7003)LF2,614$70.00$50.00$50.00$70.00$47.96$66.00$71.92
43RC pipe (CL III)(24 in) (464-7005)LF614$80.00$80.00$80.00$120.00$82.88$111.00$150.66
44RC pipe (CL III)(30 in) (464-7007)LF175$120.00$115.00$115.00$190.00$111.81$154.00$185.00
45RC pipe (CL III)(36 in) (464-7009)LF178$175.00$170.00$170.00$210.00$156.98$206.00$225.00
46RC pipe (CL III)(42 in) (464-7010)LF62$250.00$220.00$220.00$310.00$194.31$379.00$250.00
47RC pipe (CL III)(48 in) (464-7011)LF12$300.00$250.00$250.00$380.00$245.41$1,128.00$300.00
48Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH6$6,500.00$6,000.00$6,000.00$6,000.00$8,672.05$8,000.00$5,000.00
49Headwall (CH - PW - 0) (diameter= 30 in) (466-7103)EACH7$7,500.00$7,500.00$7,500.00$6,000.00$10,089$8,500.00$7,000.00
50Headwall (CH - PW - 0) (diameter= 36 in) (466-7105)EACH3$10,250$9,000.00$9,000.00$9,000.00$8,875.84$10,500$9,500.00
51Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH2$12,000$12,000$12,000$23,000$13,458$14,000$18,000
52Headwall (CH - PW - S) (diameter= 24 in) (466-7116)EACH1$7,000.00$6,500.00$6,500.00$5,000.00$6,642.37$8,500.00$5,000.00
53Headwall (CH - PW - S) (diameter= 36 in) (466-7120)EACH5$10,000$9,500.00$9,500.00$10,000$6,879.89$12,000$1,000.00
54Headwall (CH - PW - S) (diameter= 42 in) (466-7121)EACH4$12,000$10,500$10,500$16,000$13,907$13,500$12,000
55Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH2$35,000$30,000$30,000$41,000$35,865$31,500$22,000
56Wingwall (PW - 1) (HW=12 FT) (466-7182)EACH2$70,000$56,000$56,000$64,000$63,864$75,000$50,000
57Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH1$750.00$600.00$600.00$1,000.00$857.50$700.00$800.00
58Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH1$750.00$650.00$650.00$1,100.00$885.00$800.00$900.00
59Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH158$750.00$775.00$775.00$1,300.00$795.00$1,100.00$950.00
60Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH9$1,000.00$1,000.00$1,000.00$2,000.00$1,151.25$1,500.00$2,000.00
61Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH2$1,500.00$1,300.00$1,300.00$2,000.00$1,275.00$1,500.00$2,500.00
62Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH22$1,300.00$1,300.00$1,300.00$1,700.00$1,275.00$1,500.00$2,500.00
63Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH4$4,000.00$6,500.00$6,500.00$4,300.00$5,945.15$5,000.00$4,500.00
64Clean existing culverts (480-7001)EACH12$1,200.00$1,200.00$1,200.00$2,200.00$2,500.00$2,000.00$1,500.00
65Removing structure (inlet) (496-7002)EACH3$800.00$500.00$500.00$2,100.00$1,000.00$1,000.00$700.00
66Removing structure (set) (496-7004)EACH76$100.00$100.00$100.00$270.00$500.00$250.00$600.00
67Removing structure (wingwall) (496-7005)EACH2$2,000.00$1,000.00$1,000.00$3,100.00$2,000.00$10,000$1,200.00
68Removing structure (pipe) (496-7007)LF3,753$8.00$8.00$8.00$42.00$20.00$25.00$35.00
69Removing structure (ret wall) (496-7019)LF112$50.00$10.00$10.00$280.00$30.00$150.00$105.94
70Mobilization (500-7001)LS1$1,130,917$665,982$613,700$1,330,500$700,000$1,269,000$1,412,759
71Barricades, signs and traffic handling (502-7001)MO16$15,500$9,500.00$13,869$26,000$5,000.00$42,000$14,084
72Portable changeable message sign (503-7002)EACH2$19,000$19,750$24,000$15,000$17,500$21,000$19,500
73TMA (stationary) (505-7001)DAY350$175.00$150.00$200.00$50.00$200.00$10.00$563.94
74TMA (mobile operation) (505-7002)HR200$100.00$150.00$100.00$32.00$50.00$85.00$0.01
75Rock filter dams (install) (type 2) (506-7002)LF670$40.00$36.00$36.00$37.00$36.00$63.90$41.88
76Rock filter dams (install) (type 3) (506-7003)LF150$65.00$50.00$50.00$50.00$50.00$79.88$58.17
77Rock filter dams (remove) (506-7011)LF820$10.00$9.00$9.00$9.00$9.00$39.94$10.47
78Construction exits (install) (type 1) (506-7020)SY164$32.00$33.00$33.00$10.00$33.00$42.60$38.39
79Construction exits (remove) (506-7024)SY164$10.00$10.00$10.00$5.00$10.00$21.30$11.63
80Temporary sediment control fence (install) (506-7039)LF10,476$3.80$4.00$4.00$4.25$4.00$6.39$4.65
81Temporary sediment control fence (remove) (506-7041)LF10,476$0.75$0.10$0.10$0.10$0.10$3.20$0.12
82Biodegradable erosion control logs (install) (12") (506-7044)LF1,113$5.00$5.00$5.00$5.00$5.00$9.59$5.82
83Biodegradable erosion control logs (remove) (506-7046)LF1,113$1.00$1.00$5.00$1.00$1.00$4.79$1.16
84Driveways (concrete) (hes) (530-7007)SY904$160.00$95.00$110.00$100.00$147.19$111.00$124.02
85Driveways (ACP) (530-7010)SY12,024$75.00$62.00$67.00$47.50$85.00$65.00$143.53
86Mill rumble strips (asphalt) (shoulder) (533-7001)LF44,491$0.27$0.19$1.07$0.15$0.20$0.25$0.07
87Mill rumble strips (asphalt) (centerline) (533-7002)LF19,753$0.30$0.19$1.10$0.15$0.20$0.25$0.10
88Metal W-beam guard fence (timber post) (540-7001)LF900$24.00$21.00$21.00$21.00$21.00$23.96$21.00
89Remove metal beam guard fence (542-7001)LF587$3.00$2.00$2.00$2.00$2.00$2.66$2.00
90Guardrail end treatment (install) (544-7001)EACH12$3,200.00$3,025.00$3,025.00$3,100.00$3,025.00$3,141.75$3,025.00
91Guardrail end treatment (remove) (544-7003)EACH12$500.00$200.00$200.00$200.00$200.00$266.25$200.00
92Mailbox install-S (TWW-post) type 4 (560-7008)EACH54$240.00$220.00$235.00$220.00$220.00$266.25$220.00
93Mailbox install-D (TWW-post) type 4 (560-7009)EACH6$290.00$240.00$275.00$240.00$240.00$372.75$240.00
94Mailbox install-M (TWW-post) type 4 (560-7010)EACH7$400.00$550.00$1,090.00$600.00$550.00$692.25$550.00
95Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH94$650.00$660.00$702.00$700.00$660.00$681.60$660.00
96Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH14$750.00$790.00$772.00$800.00$790.00$729.53$790.00
97Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH5$700.00$790.00$816.00$800.00$790.00$777.45$790.00
98Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH2$1,000.00$990.00$1,616.00$1,000.00$990.00$1,288.65$990.00
99Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH1$1,000.00$990.00$1,604.00$1,000.00$990.00$1,283.33$990.00
100Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH14$25.00$31.00$31.00$31.00$31.00$26.63$31.00
101Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248)EACH71$140.00$70.00$105.00$70.00$70.00$79.88$70.00
102Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF57,540$0.17$0.18$0.18$0.18$0.18$0.19$0.18
103Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF635$75.00$0.40$0.40$0.40$0.40$0.43$0.40
104Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF22$2.50$4.00$4.00$4.04$4.00$4.26$4.00
105Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH6$150.00$100.00$100.00$101.01$100.00$106.50$100.00
106Work zone pavement marking non-removing(W)(word) (662-7030)EACH6$150.00$100.00$108.00$101.01$100.00$106.50$100.00
107Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF61,514$0.17$0.18$0.18$0.18$0.18$0.19$0.18
108Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH6,012$2.00$2.45$2.15$1.96$1.25$5.06$1.00
109Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF250$2.00$1.00$1.00$1.01$1.00$1.07$1.00
110Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF635$3.75$0.97$0.97$0.98$0.97$1.03$0.97
111Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF309$6.20$6.75$6.75$6.82$6.75$7.19$6.75
112Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH6$225.00$120.00$120.00$121.21$120.00$127.80$120.00
113Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH6$250.00$140.00$140.00$141.41$140.00$149.10$140.00
114Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH4$60.00$55.00$55.00$55.55$55.00$58.58$55.00
115Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF57,769$0.50$0.51$0.51$0.52$0.51$0.54$0.51
116Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF3,551$0.55$0.55$0.55$0.56$0.55$0.59$0.55
117Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF44,834$0.50$0.51$0.51$0.52$0.51$0.54$0.51
118Reflectorized pavement marker type I-C (672-7002)EACH84$6.50$3.75$3.75$3.79$3.75$3.99$3.75
119Reflectorized pavement marker type II-A-A (672-7004)EACH935$3.75$3.75$3.75$3.79$3.75$3.99$3.75
120Driftwood removal (735-7060)CY10$500.00$100.00$1,000.00$49.66$100.00$325.00$100.00
TxDOT contract A00188996: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy