TxDOT contract A00188161 bid tabulation
Highway Improvement, Various (AT VARIOUS LOCATIONS IN CC DISTRICT to .). Let by Texas DOT on August 5, 2026, Nueces, Corpus Christi District. 6 bids received; low bid $4,763,993 by TRP Infrastructure Services, LLC, -7.5% against the engineer's estimate of $5,148,857.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 51
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | TRP Infrastructure Services, LLC | $4,763,993 | Low | -7.0% |
| 2 | Centerline Technologies, LLC | $4,879,595 | +2.0% | -5.0% |
| 3 | L&L Company | $5,163,844 | +8.0% | 0.0% |
| 4 | Stripe-A-Zone, LLC | $5,187,865 | +9.0% | +1.0% |
| 5 | Pavement Markings Inc. | $5,793,175 | +22% | +13% |
| 6 | Vizcaino, L.P. | $6,154,215 | +29% | +20% |
Engineer's estimate: $5,148,857.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. TRP Infrastructure Services, LLC | 2. Centerline Technologies, LLC | 3. L&L Company | 4. Stripe-A-Zone, LLC | 5. Pavement Markings Inc. | 6. Vizcaino, L.P. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $223,000 | $10,000 | $15,000 | $1.00 | $100,000 | $15,000 | $500,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $480.00 | $500.00 | $1,000.00 | $1.00 | $500.00 | $100.00 | $1.00 |
| 3 | TMA (mobile operation) (505-7003) | DAY | 89 | $85.00 | $1,000.00 | $1,250.00 | $1.00 | $1.00 | $120.00 | $1.00 |
| 4 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 284,293 | $0.14 | $0.12 | $0.20 | $0.17 | $0.10 | $0.16 | $0.30 |
| 5 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 142,146 | $0.15 | $0.18 | $0.20 | $0.18 | $0.10 | $0.18 | $0.30 |
| 6 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 20,777 | $0.75 | $0.47 | $0.50 | $0.50 | $0.50 | $1.10 | $0.50 |
| 7 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 29 | $0.85 | $0.78 | $1.00 | $1.00 | $1.00 | $3.80 | $2.00 |
| 8 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 126,969 | $0.80 | $0.62 | $0.70 | $0.60 | $0.65 | $0.85 | $0.80 |
| 9 | Reflectorized pavement marking type I (W)12"(lane drop)(090MIL) (666-7026) | LF | 6,312 | $1.40 | $1.60 | $1.00 | $3.00 | $1.50 | $1.60 | $1.00 |
| 10 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 172 | $2.00 | $1.60 | $7.00 | $6.00 | $1.60 | $3.80 | $3.00 |
| 11 | Reflectorized pavement marking type I (Y)8"(solid)(090MIL) (666-7113) | LF | 496 | $0.85 | $0.78 | $1.00 | $1.00 | $0.70 | $2.80 | $1.00 |
| 12 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,540,949 | $0.13 | $0.11 | $0.13 | $0.16 | $0.13 | $0.16 | $0.02 |
| 13 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 304,583 | $0.14 | $0.11 | $0.13 | $0.16 | $0.13 | $0.22 | $0.02 |
| 14 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,189,234 | $0.17 | $0.11 | $0.13 | $0.16 | $0.13 | $0.18 | $0.02 |
| 15 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 1,540,949 | $0.50 | $0.54 | $0.51 | $0.59 | $0.55 | $0.58 | $0.66 |
| 16 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 1,189,234 | $0.50 | $0.54 | $0.51 | $0.59 | $0.58 | $0.62 | $0.66 |
| 17 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 304,583 | $0.50 | $0.54 | $0.51 | $0.59 | $0.58 | $0.65 | $0.66 |
| 18 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 370,554 | $0.38 | $0.38 | $0.36 | $0.37 | $0.39 | $0.55 | $0.50 |
| 19 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 2,272,968 | $0.38 | $0.38 | $0.36 | $0.37 | $0.36 | $0.49 | $0.50 |
| 20 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 128,498 | $0.45 | $0.38 | $0.36 | $0.37 | $0.39 | $0.62 | $0.50 |
| 21 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,900,703 | $0.46 | $0.38 | $0.36 | $0.37 | $0.39 | $0.52 | $0.50 |
| 22 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 972 | $8.50 | $2.50 | $10.00 | $10.00 | $29.25 | $26.00 | $30.00 |
| 23 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 2,707 | $2.15 | $2.50 | $4.00 | $4.00 | $5.50 | $4.40 | $8.00 |
| 24 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 7,093 | $5.10 | $5.00 | $9.00 | $8.00 | $6.50 | $4.80 | $7.00 |
| 25 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 10,145 | $8.00 | $9.00 | $11.00 | $11.00 | $13.75 | $9.40 | $12.00 |
| 26 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 393 | $130.00 | $120.00 | $185.00 | $170.00 | $155.00 | $165.00 | $220.00 |
| 27 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 49 | $280.00 | $325.00 | $200.00 | $280.00 | $270.00 | $320.00 | $250.00 |
| 28 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 48 | $395.00 | $400.00 | $350.00 | $400.00 | $590.00 | $420.00 | $400.00 |
| 29 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 1 | $60.00 | $75.00 | $500.00 | $70.00 | $431.00 | $320.00 | $500.00 |
| 30 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 357 | $180.00 | $185.00 | $190.00 | $250.00 | $240.00 | $180.00 | $250.00 |
| 31 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 13 | $485.00 | $500.00 | $650.00 | $500.00 | $580.00 | $580.00 | $500.00 |
| 32 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 3 | $8.50 | $8.00 | $20.00 | $50.00 | $38.00 | $33.00 | $50.00 |
| 33 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 1,273 | $15.00 | $16.00 | $25.00 | $20.00 | $62.00 | $34.00 | $35.00 |
| 34 | Prefabricated PM type C (W)(bike arrow) (668-7113) | EACH | 18 | $110.00 | $75.00 | $150.00 | $300.00 | $110.00 | $95.00 | $200.00 |
| 35 | Prefabricated PM type C (W)(bike symbol) (668-7115) | EACH | 19 | $178.00 | $185.00 | $150.00 | $200.00 | $150.00 | $190.00 | $200.00 |
| 36 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 1,855 | $11.00 | $10.25 | $12.00 | $12.00 | $14.00 | $8.40 | $14.00 |
| 37 | Reflectorized pavement marker type I-C (672-7002) | EACH | 7,706 | $3.65 | $3.75 | $4.00 | $3.70 | $3.90 | $4.80 | $4.00 |
| 38 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 59,593 | $4.00 | $3.50 | $4.00 | $3.70 | $3.90 | $2.90 | $5.50 |
| 39 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 36,866 | $4.85 | $3.50 | $4.00 | $3.70 | $3.90 | $3.20 | $0.04 |
| 40 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,456 | $2.10 | $1.00 | $0.50 | $1.20 | $2.00 | $3.00 | $1.00 |
| 41 | Eliminating existing PM & markers (24") (677-7008) | LF | 10,566 | $1.10 | $1.00 | $1.00 | $2.00 | $4.00 | $3.20 | $3.00 |
| 42 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 407 | $2.80 | $20.00 | $50.00 | $60.00 | $40.00 | $30.00 | $80.00 |
| 43 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 49 | $67.00 | $100.00 | $65.00 | $90.00 | $100.00 | $80.00 | $80.00 |
| 44 | Eliminating existing PM & markers (number) (677-7014) | EACH | 1 | $17.50 | $20.00 | $50.00 | $100.00 | $30.00 | $80.00 | $80.00 |
| 45 | Eliminating existing PM & markers (word) (677-7015) | EACH | 348 | $38.00 | $20.00 | $50.00 | $75.00 | $40.00 | $30.00 | $80.00 |
| 46 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 18 | $180.00 | $200.00 | $250.00 | $100.00 | $250.00 | $100.00 | $120.00 |
| 47 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 30 | $16.50 | $20.00 | $5.00 | $20.00 | $25.00 | $5.00 | $20.00 |
| 48 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 1,273 | $8.50 | $6.00 | $10.00 | $20.00 | $35.00 | $5.00 | $20.00 |
| 49 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 18 | $60.00 | $6.00 | $100.00 | $100.00 | $35.00 | $20.00 | $20.00 |
| 50 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 19 | $62.00 | $6.00 | $100.00 | $100.00 | $35.00 | $50.00 | $20.00 |
| 51 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 1,608 | $0.65 | $5.00 | $5.00 | $25.00 | $6.00 | $1.00 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.