TxDOT contract A00191727 bid tabulation

Seal Coat, SH 31 (SH 31/BS 31D Split to FM 1393). Let by Texas DOT on October 9, 2025, Navarro, Dallas District. 2 bids received; low bid $14,985,368 by Clark Construction of Texas, Inc., -23% against the engineer's estimate of $19,507,649.

Owner
Texas DOT
Letting
09 OCT 2025
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Clark Construction of Texas, Inc.$14,985,368Low-23%
2Northeastern Pavers, LLC$16,306,282+9.0%-16%
TxDOT contract A00191727: bids by rank

Engineer's estimate: $19,507,649.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Clark Construction of Texas, Inc.2. Northeastern Pavers, LLC
1Load, haul & delivery of aggregate (302-7007)MI50$100.00$125.00$350.00
2Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7087)TON5,726.04$900.00$595.25$690.00
3Aggregate (type-PL, GR-3 LTWT)(sac-B) (316-7236)CY15,789$186.36$195.00
4Aggregate (type-PL, GR-4)(sac-B) (316-7238)CY12,719$150.00$175.29$185.00
5SP mixes SP-C PG64-22 (344-7009)TON5,055$203.00$275.00
6Tack coat (344-7077)GAL5,055$1.00$4.00
7Planing asphalt concrete pavement(2") (354-7051)SY45,955$3.80$9.50
8Mobilization (500-7001)LS1$3,200,000$2,286,000$2,000,000
9Barricades, signs and traffic handling (502-7001)MO8$57,000$25,000$61,250
10TMA (mobile operation) (505-7003)DAY240$103.00$1.00$0.01
11Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH3,644$0.60$0.01$1.00
12Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH20,154$0.66$0.01$1.00
13Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF647$1.00$1.50
14Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF35,229$0.80$0.80
15Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF618$4.00$3.75
16Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF2,268$6.00$10.50
17Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111)LF257$1.00$1.25
18Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF2,169$4.00$5.25
19Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF63,167$0.21$0.16$0.16
20Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF239$0.16$0.75
21Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF1,576,520$0.20$0.16$0.15
22Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF32,545$0.31$0.30$0.35
23Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF1,020$3.00$2.50
24Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF9,093$5.00$4.00$6.25
25Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF105,496$0.21$0.16$0.16
26Reflectorized pavement marking type II (Y) 6" (DOT) (666-7212)LF1,804$0.16$0.25
27Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF999,544$0.20$0.16$0.15
28Reflectorized pavement marking type II (Y) 24" (solid) (666-7217)LF4,184$4.00$5.00
29RE prof PM (W)6"(solid) raisd prof only (666-7279)LF718,936$0.36$0.28$0.25
30RE prof PM (Y)6"(solid) raisd prof only (666-7280)LF441,213$0.36$0.28$0.25
31RE prof PM (Y)6"(broken) raisd prof only (666-7281)LF28,026$0.41$0.28$0.25
32Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF27,320$0.50$0.50
33Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF1,699,163$0.50$0.44
34Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF89,578$0.50$0.47
35Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF1,215,375$0.50$0.46
36Prefabricated PM type C (W)(arrow) (668-7091)EACH137$247.20$200.00$250.00
37Prefabricated PM type C (W)(double arrow) (668-7093)EACH47$250.00$350.00
38Prefabricated PM type C (W)(word) (668-7103)EACH113$278.10$200.00$280.00
39Prefabricated PM type C (W)(RR crossing) (668-7108)EACH8$600.00$645.00
40Prefabricated PM type C (W)(18")(yld tri) (668-7110)EACH58$24.00$50.00
41Reflectorized pavement marker type II-A-A (672-7004)EACH14,831$5.50$5.00$4.05
42Eliminating existing PM & markers (6") (677-7002)LF58,272$1.57$0.75$0.50
43Eliminating existing PM & markers (8") (677-7004)LF4,244$0.75$0.70
44Eliminating existing PM & markers (12") (677-7006)LF1,710$1.00$1.00
45Eliminating existing PM & markers (24") (677-7008)LF7,707$5.00$2.00$1.50
46Eliminating existing PM & markers (arrow) (677-7009)EACH26$50.00$50.00
47Eliminating existing PM & markers (word) (677-7015)EACH26$50.00$80.00
48Eliminating existing PM & markers (rumble strip) (677-7030)LF558,544$0.16$0.18
49Pavement surface preparation for marking (6") (678-7002)LF58,272$0.28$0.01$0.05
50Pavement surface preparation for marking (8") (678-7004)LF4,144$0.01$0.10
51Pavement surface preparation for marking (12") (678-7006)LF100$0.01$1.00
52Pavement surface preparation for marking (24") (678-7008)LF4,811$0.01$1.50
53Pavement surface preparation for marking (arrow) (678-7009)EACH26$0.01$50.00
54Pavement surface preparation for marking (word) (678-7016)EACH26$0.01$50.00
TxDOT contract A00191727: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy