| 1 | Removing concrete (medians) (104-7008) | SY | 449 | | $16.22 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 36 | $102.75 | $16.22 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 342 | $66.00 | $16.22 |
| 4 | Removing concrete (curb ramp) (104-7015) | SY | 33 | $10.50 | $16.22 |
| 5 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 1,407 | $8.34 | $7.99 |
| 6 | Remove (3") TRT/untrt base & asphalt pavement (105-7023) | SY | 449 | $18.35 | $14.56 |
| 7 | Embankment (final)(DC)(type A) (132-7002) | CY | 60 | | $62.97 |
| 8 | Loose aggregate GRND cover (192-7023) | CY | 15 | | $116.24 |
| 9 | Prime coat (multi option) (310-7015) | GAL | 72 | | $16.27 |
| 10 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 50 | | $180.28 |
| 11 | D-GR HMA type-C sac-A PG70-22 (exempt) (341-7025) | TON | 40 | | $219.01 |
| 12 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 48 | $405.33 | $482.02 |
| 13 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 28 | $448.50 | $492.61 |
| 14 | Mobilization (500-7001) | LS | 1 | $59,535 | $63,677 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $7,441.82 | $8,810.61 |
| 16 | Portable changeable message sign (503-7002) | EACH | 2 | $10,622 | $86.58 |
| 17 | TMA (stationary) (505-7001) | DAY | 42 | $257.50 | $346.31 |
| 18 | TMA (mobile operation) (505-7003) | DAY | 30 | $500.00 | $692.61 |
| 19 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 140 | | $11.50 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 140 | | $3.43 |
| 21 | Concrete curb & gutter (type I) (529-7008) | LF | 41 | $52.34 | $30.63 |
| 22 | Concrete curb & gutter (type II) (529-7009) | LF | 1,057 | $28.18 | $31.92 |
| 23 | Concrete curb (special) (529-7027) | LF | 10 | | $133.96 |
| 24 | Driveways (concrete) (530-7006) | SY | 21 | $180.17 | $93.15 |
| 25 | Concrete sidewalks (4") (531-7001) | SY | 223 | $70.00 | $71.08 |
| 26 | Curb ramps (type 2) (531-7006) | EACH | 1 | | $2,052.50 |
| 27 | Curb ramps (type 7) (531-7010) | EACH | 3 | $1,899.13 | $1,721.16 |
| 28 | Curb ramps (type 10) (531-7011) | EACH | 10 | $1,800.00 | $1,754.73 |
| 29 | Curb ramps (type 22) (531-7014) | EACH | 2 | | $2,858.27 |
| 30 | Concrete median (nose) (536-7005) | SY | 62 | $350.00 | $79.43 |
| 31 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 650 | $36.33 | $24.83 |
| 32 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 15 | | $44.40 |
| 33 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 220 | $30.00 | $30.79 |
| 34 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 1,340 | $31.25 | $45.96 |
| 35 | Conduit (prepare) (618-7090) | LF | 30 | | $4.82 |
| 36 | Electrical conductor (no.14) insulated (620-7002) | LF | 75 | $1.00 | $1.83 |
| 37 | Electrical conductor (no.4) insulated (620-7012) | LF | 1,920 | $4.27 | $4.98 |
| 38 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 1 | | $17,272 |
| 39 | Remove ITS ground box (623-7041) | EACH | 1 | | $844.12 |
| 40 | Ground box type A (122311)W/apron (624-7002) | EACH | 15 | $1,855.38 | $1,945.61 |
| 41 | Ground box type D (162922)W/apron (624-7008) | EACH | 2 | $1,733.26 | $2,444.76 |
| 42 | Remove ground box (624-7013) | EACH | 8 | $500.00 | $638.53 |
| 43 | Elc SRV type D 120/240 060(NS)SS(N)GC(O) (628-7152) | EACH | 2 | $9,706.00 | $11,934 |
| 44 | Aluminum signs (type A) (636-7001) | SF | 183 | $48.52 | $44.43 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 5 | $848.84 | $1,196.30 |
| 46 | Relocate SM RD SN sup&AM(sign only) (644-7072) | EACH | 3 | | $162.33 |
| 47 | Remove SM RD SN sup&AM (644-7073) | EACH | 5 | $278.68 | $157.40 |
| 48 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 565 | $2.50 | $3.94 |
| 49 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 65 | | $7.52 |
| 50 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,170 | $9.25 | $18.47 |
| 51 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 6 | | $326.44 |
| 52 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | | $380.53 |
| 53 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 65 | | $8.74 |
| 54 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 2 | $25.00 | $2,676.66 |
| 55 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 190 | | $1.18 |
| 56 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 430 | | $0.56 |
| 57 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 565 | $0.54 | $1.14 |
| 58 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 65 | | $4.62 |
| 59 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,170 | $3.45 | $11.33 |
| 60 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 6 | | $223.66 |
| 61 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 4 | | $265.50 |
| 62 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,165 | | $0.58 |
| 63 | Reflectorized pavement marking type II (Y) 12" (solid) (666-7215) | LF | 65 | | $5.30 |
| 64 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 190 | | $2.87 |
| 65 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 430 | | $1.82 |
| 66 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,165 | | $1.76 |
| 67 | Reflectorized pavement marker type I-C (672-7002) | EACH | 26 | | $12.86 |
| 68 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 21 | | $12.86 |
| 69 | Eliminating existing PM & markers (6") (677-7002) | LF | 150 | | $2.41 |
| 70 | Eliminating existing PM & markers (8") (677-7004) | LF | 100 | $4.95 | $3.20 |
| 71 | Eliminating existing PM & markers (24") (677-7008) | LF | 514 | $5.47 | $12.03 |
| 72 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | | $385.27 |
| 73 | Eliminating existing PM & markers (word) (677-7015) | EACH | 1 | | $481.94 |
| 74 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,785 | | $0.36 |
| 75 | Pavement surface preparation for marking (8") (678-7004) | LF | 485 | $0.22 | $0.42 |
| 76 | Pavement surface preparation for marking (12") (678-7006) | LF | 65 | | $0.53 |
| 77 | Pavement surface preparation for marking (18") (678-7007) | LF | 8 | | $0.71 |
| 78 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,170 | $0.75 | $1.07 |
| 79 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 6 | | $170.27 |
| 80 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | | $212.11 |
| 81 | Install highway traffic signal (system) (680-7003) | EACH | 2 | $38,254 | $64,444 |
| 82 | Removing traffic signals (680-7004) | EACH | 2 | $6,352.33 | $21,925 |
| 83 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $438.58 | $427.00 |
| 84 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $439.00 | $427.00 |
| 85 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $594.25 | $427.00 |
| 86 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $413.00 | $427.00 |
| 87 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $586.00 | $427.00 |
| 88 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $453.00 | $427.00 |
| 89 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 16 | $947.63 | $1,000.74 |
| 90 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 2 | $300.00 | $273.05 |
| 91 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 8 | $224.48 | $217.52 |
| 92 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 3,197 | $2.77 | $2.37 |
| 93 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,594 | $4.17 | $3.71 |
| 94 | Traffic signal CBL (type A)(14 AWG)(9 conductor) (684-7035) | LF | 289 | $5.08 | $4.82 |
| 95 | Traffic signal CBL (type A)(14 AWG)(12 conductor) (684-7038) | LF | 545 | $6.92 | $6.51 |
| 96 | Traffic signal CBL (type A)(14 AWG)(21 conductor) (684-7047) | LF | 760 | $10.00 | $12.22 |
| 97 | Ins traffic signal PL AM (S)1 arm(24') (686-7025) | EACH | 1 | | $13,076 |
| 98 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 1 | $14,401 | $13,301 |
| 99 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 1 | $21,838 | $14,160 |
| 100 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $15,250 | $15,456 |
| 101 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 1 | $9,278.50 | $16,221 |
| 102 | Pedestrian pole assembly (687-7001) | EACH | 11 | $2,388.03 | $1,768.11 |
| 103 | Pedestrian detect push button (APS) (688-7001) | EACH | 16 | $862.76 | $1,314.90 |
| 104 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $3,456.23 | $5,162.13 |
| 105 | VIVDS prosr sys (6006-7001) | EACH | 2 | $9,088.75 | $5,475.10 |
| 106 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 8 | $4,500.00 | $7,197.11 |
| 107 | VIVDS CNTRL software (6006-7005) | EACH | 2 | $1,012.50 | $32.47 |
| 108 | VIVDS cabling (6006-7007) | LF | 1,549 | $2.77 | $2.60 |
| 109 | Ground box (prepare) (6013-7006) | EACH | 1 | | $681.79 |
| 110 | Fiber optic fusion splice (6027-7004) | EACH | 24 | $182.44 | $166.76 |
| 111 | FO splice enclosure (type 1) (6027-7009) | EACH | 2 | $1,500.00 | $3,220.65 |
| 112 | FO CBL (12 SMF)(pigtail) (6027-7020) | LF | 175 | $8.00 | $9.80 |
| 113 | Ethernet switch (install only) (6036-7001) | EACH | 2 | $400.00 | $1,279.17 |