TxDOT contract A00193995 bid tabulation
Install/Replace Signs, IH 30 (Ent Ramp to SL 12). Let by Texas DOT on November 5, 2025, Dallas, Dallas District. 9 bids received; low bid $1,127,949 by Highway Intelligent Traffic Solutions, Inc., -1.5% against the engineer's estimate of $1,144,816.
- Owner
- Texas DOT
- Letting
- 05 NOV 2025
- Pay items
- 24
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Highway Intelligent Traffic Solutions, Inc. | $1,127,949 | Low | -1.0% |
| 2 | Vaca Underground Utilities Inc | $1,184,484 | +5.0% | +3.0% |
| 3 | Sice, Inc. | $1,188,584 | +5.0% | +4.0% |
| 4 | Garret Shields Infrastructure | $1,228,865 | +9.0% | +7.0% |
| 5 | WG Engineering & Construction, LLC | $1,302,473 | +15% | +14% |
| 6 | Yunex LLC | $1,397,375 | +24% | +22% |
| 7 | Grey Sky Construction LLC | $1,400,302 | +24% | +22% |
| 8 | Marcom'S Mowing Service, LLC | $1,543,782 | +37% | +35% |
| 9 | Structural Integrity Group LLC | $1,627,456 | +44% | +42% |
Engineer's estimate: $1,144,816.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Highway Intelligent Traffic Solutions, Inc. | 2. Vaca Underground Utilities Inc | 3. Sice, Inc. | 4. Garret Shields Infrastructure | 5. WG Engineering & Construction, LLC | 6. Yunex LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 120 | $276.71 | $275.00 | $388.43 | $400.00 | $420.00 | $679.00 | |
| 2 | Riprap (concrete)(CL B) (432-7005) | CY | 5.25 | $937.50 | $800.00 | $2,395.21 | $1,000.00 | $720.00 | $2,409.00 | |
| 3 | Mobilization (500-7001) | LS | 1 | $92,500 | $42,411 | $90,000 | $107,858 | $100,000 | $135,200 | $235,647 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $1,458.45 | $15,783 | $3,500.00 | $22,848 | $5,000.00 | $8,520.00 | $10,103 |
| 5 | TMA (stationary) (505-7001) | DAY | 100 | $400.00 | $206.64 | $150.00 | $479.55 | $300.00 | $348.00 | $235.00 |
| 6 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 300 | $5.20 | $12.50 | $1.00 | $7.53 | $6.00 | $5.00 | $5.20 |
| 7 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $1.25 | $1.25 | $1.00 | $1.10 | $1.00 | $3.00 | $1.72 |
| 8 | In RD IL (type SA) 30T-8 (250W EQ) LED (610-7072) | EACH | 15 | $4,893.30 | $4,500.00 | $6,362.05 | $4,000.00 | $4,655.00 | $5,093.00 | |
| 9 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 318 | $34.61 | $12.00 | $35.19 | $20.00 | $24.00 | $23.65 | |
| 10 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 735 | $50.94 | $20.00 | $41.28 | $30.00 | $32.00 | $43.74 | |
| 11 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 103 | $103.38 | $15.00 | $49.51 | $20.00 | $36.00 | $25.51 | |
| 12 | Electrical conductor (no.8) bare (620-7007) | LF | 1,053 | $3.35 | $2.00 | $3.89 | $3.00 | $2.85 | $3.47 | |
| 13 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,276 | $3.41 | $2.50 | $4.11 | $3.50 | $3.00 | $3.67 | |
| 14 | Electrical conductor (no.4) insulated (620-7012) | LF | 309 | $6.25 | $3.00 | $6.12 | $5.00 | $3.65 | $4.57 | |
| 15 | Ground box type A (122311)W/apron (624-7002) | EACH | 9 | $1,794.66 | $1,500.00 | $1,787.61 | $3,000.00 | $1,435.00 | $2,234.00 | |
| 16 | Elc SRV type A 240/480 060(NS)SS(E)GC(O) (628-7044) | EACH | 5 | $11,329 | $10,000 | $14,051 | $15,000 | $8,485.00 | $11,169 | |
| 17 | Aluminum signs (type A) (636-7001) | SF | 687.50 | $40.00 | $31.91 | $20.00 | $68.01 | $50.00 | $45.00 | $40.01 |
| 18 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 33 | $844.73 | $900.00 | $1,469.69 | $1,000.00 | $1,450.00 | $1,063.00 | |
| 19 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $957.11 | $1,100.00 | $1,611.15 | $1,000.00 | $1,450.00 | $1,171.00 | |
| 20 | Remove SM RD SN sup&AM (644-7073) | EACH | 16 | $168.60 | $250.00 | $353.37 | $500.00 | $320.00 | $115.00 | |
| 21 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 400 | $11.40 | $50.00 | $17.44 | $20.00 | $30.00 | $20.50 | |
| 22 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 30 | $7,225.04 | $8,500.00 | $4,978.04 | $5,000.00 | $8,230.00 | $8,369.00 | |
| 23 | Pedestrian pole assembly (687-7001) | EACH | 53 | $4,200.00 | $3,448.53 | $2,750.00 | $2,407.66 | $5,000.00 | $1,873.00 | $3,721.00 |
| 24 | Install solar-powered dfssa (6075-7002) | EACH | 53 | $4,800.00 | $5,329.61 | $7,500.00 | $4,675.53 | $6,000.00 | $8,035.00 | $5,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.