TxDOT contract A00195453 bid tabulation

Resurface Roadway, FM 57 (US 180 to JONES COUNTY). Let by Texas DOT on October 8, 2025, Fisher, Abilene District. 7 bids received; low bid $2,898,665 by CK Newberry, LLC, -19% against the engineer's estimate of $3,570,712.

Owner
Texas DOT
Letting
08 OCT 2025
Pay items
31
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1CK Newberry, LLC$2,898,665Low-19%
2J. H. Strain & Sons, Inc.$2,982,134+3.0%-16%
3Zack Burkett Co.$3,111,166+7.0%-13%
4RK Hall, LLC$3,167,782+9.0%-11%
5Duininck, Inc.$3,299,332+14%-8.0%
6Nobles Road Construction, Inc.$3,541,708+22%-1.0%
7A. L. Helmcamp, Inc.$3,697,998+28%+4.0%
TxDOT contract A00195453: bids by rank

Engineer's estimate: $3,570,712.

Bid tabulation

LinePay itemUnitQuantityEstimate1. CK Newberry, LLC2. J. H. Strain & Sons, Inc.3. Zack Burkett Co.4. RK Hall, LLC5. Duininck, Inc.6. Nobles Road Construction, Inc.
1Backfill (type A) (134-7001)STA533.63$385.00$175.00$330.00$300.00$151.86$165.00$561.00
2D-GR HMA type D PG70-22 (341-7048)TON15,839$145.00$122.00$123.78$128.00$126.38$136.50$144.65
3Tack coat (341-7082)GAL27,044$5.00$4.00$4.50$4.94$3.87$2.50$5.80
4Flexible pavement structure repair(4") (351-7003)SY5,444$50.00$50.00$48.00$45.00$45.21$50.00$49.00
5Planing asphalt concrete pavement (0" to 1.5") (354-7073)SY3,194$5.50$2.00$5.00$5.50$10.82$6.30$3.00
6Planing asphalt concrete pavement (1.5") (354-7074)SY3,517$2.00$4.00$5.10$3.06$5.05$3.50
7Clean existing culverts (480-7001)EACH3$3,175.00$2,000.00$3,000.00$3,500.00$7,600.00$9,750.00$3,665.00
8Mobilization (500-7001)LS1$317,337$215,000$150,000$215,000$278,000$325,000$221,000
9Barricades, signs and traffic handling (502-7001)MO4$20,000$15,000$10,000$6,400.00$32,889$30,000$12,750
10TMA (stationary) (505-7001)DAY65$275.00$275.00$250.00$275.00$361.84$255.00$275.00
11TMA (mobile operation) (505-7003)DAY22$300.00$275.00$350.00$0.01$457.49$925.00$605.00
12Mill rumble strips (asphalt) (shoulder) (533-7001)LF95,264$0.20$0.20$0.22$0.33$0.31$0.11$0.23
13Mill rumble strips (asphalt) (centerline) (533-7002)LF48,724$0.20$0.20$0.22$0.51$0.47$0.13$0.28
14Metal W-beam guard fence (timber post) (540-7001)LF475$40.00$46.00$35.70$28.60$39.00$37.75
15Metal W - beam guard fence (low fill culvert) (540-7018)LF175$95.00$105.00$113.05$94.60$88.50$115.50
16Remove metal beam guard fence (542-7001)LF475$5.00$5.50$5.95$5.50$5.15$3.80
17Remove terminal anchor section (542-7002)EACH4$500.00$550.00$595.00$550.00$515.00$209.00
18Guardrail end treatment (install) (544-7001)EACH4$3,500.00$3,850.00$4,165.00$3,404.50$3,200.00$3,500.00
19Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH9$40.00$44.00$47.60$49.50$46.50$38.00
20Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057)EACH4$100.00$110.00$119.00$110.00$155.00$110.00
21Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,563$1.75$2.00$2.25$1.40$3.20$1.55$1.65
22Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF555$1.00$1.00$1.22$1.19$1.21$1.15$1.00
23Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF244$6.50$6.00$3.30$9.52$3.30$6.15$2.75
24Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF104,437$0.75$0.50$0.70$0.77$0.70$0.52$0.61
25Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF12,080$0.60$0.60$0.70$0.77$0.70$0.62$0.63
26Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF23,817$0.70$0.60$0.70$0.77$0.70$0.60$0.63
27Prefabricated PM type C (W)(24")(solid) (668-7089)LF52$20.00$17.00$24.20$17.85$24.20$17.50$14.60
28Prefabricated PM type C (W)(arrow) (668-7091)EACH2$235.00$185.00$275.00$327.25$275.00$190.00$240.00
29Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH4$75.00$20.20$71.40$22.00$77.00$50.00
30Reflectorized pavement marker type II-A-A (672-7004)EACH902$5.75$4.50$5.00$5.95$5.23$4.65$4.20
31Reflectorized pavement marker type II-C-C (672-7005)EACH28$5.75$4.50$5.50$5.95$5.50$4.65$4.40
TxDOT contract A00195453: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy