TxDOT contract A00196843 bid tabulation
Traffic Signal Improvements, US 67 (At SH 137 to -). Let by Texas DOT on February 5, 2026, Reagan, San Angelo District. 4 bids received; low bid $512,494 by E-Z Bel Construction, LLC, -0.1% against the engineer's estimate of $512,766.
- Owner
- Texas DOT
- Letting
- 05 FEB 2026
- Pay items
- 75
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E-Z Bel Construction, LLC | $512,494 | Low | 0.0% |
| 2 | Vaca Underground Utilities Inc | $633,016 | +24% | +23% |
| 3 | Select Maintenance, L.L.C. | $709,388 | +38% | +38% |
| 4 | O. Trevino Construction, LLC | $732,704 | +43% | +43% |
Engineer's estimate: $512,766.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. E-Z Bel Construction, LLC | 2. Vaca Underground Utilities Inc | 3. Select Maintenance, L.L.C. | 4. O. Trevino Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 147 | $30.00 | $25.00 | $20.00 | $50.00 | $75.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 29 | $50.00 | $25.00 | $25.00 | $65.00 | $75.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 248 | $35.00 | $20.00 | $20.00 | $30.00 | $50.00 |
| 4 | Loose aggregate GRND cover (192-7022) | SY | 44 | $150.00 | $90.00 | $100.00 | $85.00 | $50.00 |
| 5 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 52 | $600.00 | $500.00 | $300.00 | $500.00 | $481.00 |
| 6 | Riprap (concrete)(5 in) (432-7002) | CY | 24 | $1,200.00 | $800.00 | $300.00 | $1,200.00 | $1,500.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $37,974 | $50,000 | $60,000 | $70,000 | $73,000 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $5,000.00 | $4,000.00 | $2,500.00 | $20,000 | $7,500.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 28 | $175.00 | $135.00 | $160.00 | $75.00 | $185.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 20 | $350.00 | $350.00 | $160.00 | $350.00 | $185.00 |
| 11 | TMA (mobile operation) (505-7003) | DAY | 2 | $400.00 | $0.01 | $100.00 | $500.00 | $720.00 |
| 12 | Sandbags for erosion control (506-7035) | EACH | 8 | $20.00 | $10.00 | $1.00 | $40.00 | $1.00 |
| 13 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 62 | $15.00 | $10.00 | $1.00 | $8.00 | $10.00 |
| 14 | Biodegradable erosion control logs (remove) (506-7046) | LF | 62 | $2.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | Concrete curb (type II) (529-7002) | LF | 69 | $35.00 | $95.00 | $50.00 | $32.00 | $110.00 |
| 16 | Concrete curb & gutter (type II) (529-7009) | LF | 248 | $75.00 | $95.00 | $50.00 | $69.00 | $160.00 |
| 17 | Concrete curb (slotted) (529-7013) | LF | 13 | $35.00 | $200.00 | $80.00 | $38.00 | $100.00 |
| 18 | Concrete curb & gutter (slotted) (529-7021) | LF | 26 | $155.00 | $200.00 | $80.00 | $78.00 | $350.00 |
| 19 | Concrete sidewalks (4") (531-7001) | SY | 71 | $200.00 | $170.00 | $150.00 | $105.00 | $200.00 |
| 20 | Curb ramps (type 2) (531-7006) | EACH | 4 | $3,200.00 | $4,200.00 | $5,000.00 | $3,000.00 | $3,250.00 |
| 21 | Curb ramps (type 7) (531-7010) | EACH | 4 | $3,000.00 | $4,200.00 | $5,000.00 | $3,000.00 | $3,250.00 |
| 22 | Concrete median (536-7002) | SY | 3 | $200.00 | $900.00 | $1,100.00 | $300.00 | $400.00 |
| 23 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 125 | $35.00 | $25.00 | $12.00 | $30.00 | $32.00 |
| 24 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 75 | $40.00 | $30.00 | $14.00 | $33.00 | $42.00 |
| 25 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 30 | $45.00 | $45.00 | $16.00 | $35.00 | $56.00 |
| 26 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 385 | $65.00 | $55.00 | $30.00 | $37.00 | $120.00 |
| 27 | Electrical conductor (no.8) bare (620-7007) | LF | 615 | $3.00 | $3.00 | $2.00 | $3.00 | $2.00 |
| 28 | Electrical conductor (no.8) insulated (620-7008) | LF | 340 | $4.00 | $3.00 | $3.00 | $3.00 | $2.50 |
| 29 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 380 | $4.50 | $3.00 | $3.00 | $3.00 | $3.00 |
| 30 | Ground box type D (162922) (624-7007) | EACH | 2 | $1,800.00 | $1,200.00 | $1,132.00 | $2,600.00 | $1,470.00 |
| 31 | Ground box type D (162922)W/apron (624-7008) | EACH | 2 | $2,100.00 | $2,100.00 | $1,695.00 | $4,000.00 | $2,030.00 |
| 32 | Remove electrical services (628-7002) | EACH | 1 | $900.00 | $500.00 | $432.00 | $500.00 | $1,470.00 |
| 33 | Elc SRV type D 120/240 060(NS)AL(E)TP(O) (628-7123) | EACH | 1 | $8,000.00 | $7,000.00 | $7,500.00 | $35,000 | $7,035.00 |
| 34 | Aluminum signs (type A) (636-7001) | SF | 55.50 | $60.00 | $50.00 | $50.00 | $38.00 | $35.50 |
| 35 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $760.00 | $1,000.00 | $1,500.00 | $1,500.00 | $1,123.00 |
| 36 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $120.00 | $500.00 | $70.00 | $100.00 | $112.00 |
| 37 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 275 | $4.00 | $8.50 | $11.00 | $6.00 | $9.50 |
| 38 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 504 | $15.00 | $11.00 | $14.00 | $16.00 | $12.50 |
| 39 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $400.00 | $300.00 | $400.00 | $350.00 | $337.00 |
| 40 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $400.00 | $600.00 | $780.00 | $350.00 | $675.00 |
| 41 | Pavement sler 24" (666-7352) | LF | 504 | $1.50 | $4.50 | $6.00 | $1.00 | $5.00 |
| 42 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 120 | $5.00 | $6.50 | $9.00 | $2.00 | $7.50 |
| 43 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 880 | $5.00 | $6.50 | $9.00 | $2.00 | $7.50 |
| 44 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,080 | $5.00 | $6.50 | $9.00 | $2.00 | $7.50 |
| 45 | Reflectorized pavement marker type I-C (672-7002) | EACH | 24 | $20.00 | $12.50 | $16.00 | $5.00 | $14.00 |
| 46 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 58 | $20.00 | $12.50 | $16.00 | $5.00 | $14.00 |
| 47 | Eliminating existing PM & markers (6") (677-7002) | LF | 56 | $0.25 | $3.00 | $4.00 | $1.00 | $3.50 |
| 48 | Eliminating existing PM & markers (24") (677-7008) | LF | 116 | $20.00 | $6.00 | $8.00 | $5.00 | $6.50 |
| 49 | Pavement surface preparation for marking (6") (678-7002) | LF | 2,080 | $0.10 | $1.50 | $2.00 | $0.10 | $2.00 |
| 50 | Pavement surface preparation for marking (8") (678-7004) | LF | 275 | $0.20 | $2.00 | $3.00 | $0.10 | $2.25 |
| 51 | Pavement surface preparation for marking (24") (678-7008) | LF | 504 | $0.75 | $4.00 | $5.00 | $0.30 | $4.50 |
| 52 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $22.00 | $135.00 | $175.00 | $75.00 | $151.50 |
| 53 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $20.00 | $135.00 | $175.00 | $75.00 | $151.50 |
| 54 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 53 | $0.65 | $2.50 | $3.00 | $1.00 | $3.00 |
| 55 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $49,400 | $57,000 | $100,000 | $91,000 | $96,500 |
| 56 | Removing traffic signals (680-7004) | EACH | 1 | $6,000.00 | $11,000 | $5,000.00 | $14,000 | $12,200 |
| 57 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 58 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 59 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 60 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 61 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 62 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $395.00 | $350.00 | $325.00 | $350.00 | $335.00 |
| 63 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $1,000.00 | $750.00 | $800.00 | $1,500.00 | $2,100.00 |
| 64 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 8 | $250.00 | $200.00 | $200.00 | $350.00 | $235.00 |
| 65 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 2 | $300.00 | $250.00 | $250.00 | $370.00 | $325.00 |
| 66 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 500 | $3.00 | $3.00 | $3.25 | $3.00 | $4.50 |
| 67 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,150 | $4.00 | $4.00 | $6.00 | $5.00 | $6.25 |
| 68 | Traffic signal CBL (type A)(12 AWG)(20 conductor) (684-7025) | LF | 550 | $7.75 | $11.00 | $15.00 | $12.00 | $14.75 |
| 69 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 1 | $19,000 | $16,000 | $16,500 | $33,870 | $23,200 |
| 70 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $19,000 | $19,000 | $78,500 | $36,585 | $28,900 |
| 71 | Ins traffic signal PL AM(S)1 arm(48') (686-7049) | EACH | 1 | $20,000 | $17,000 | $16,500 | $35,270 | $26,000 |
| 72 | Pedestrian pole assembly (687-7001) | EACH | 8 | $3,500.00 | $2,900.00 | $2,600.00 | $3,000.00 | $3,725.00 |
| 73 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,500.00 | $1,000.00 | $900.00 | $2,500.00 | $2,550.00 |
| 74 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,500.00 | $4,000.00 | $4,500.00 | $5,000.00 | $7,575.00 |
| 75 | Install fused disconnect (690-7203) | EACH | 1 | $2,500.00 | $3,000.00 | $3,100.00 | $5,000.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.