TxDOT contract A00197970 bid tabulation

Preventive Maintenance, US 281 (100 Ft. West of FM 2557 to 0.7 Miles East of FM 493). Let by Texas DOT on November 3, 2026, Hidalgo, Pharr District. 2 bids received; low bid $11,560,279 by Foremost Paving, Inc., -10% against the engineer's estimate of $12,874,559.

Owner
Texas DOT
Letting
03 NOV 2026
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Foremost Paving, Inc.$11,560,279Low-10%
2Ioc Company LLC$11,708,936+1.0%-9.0%
TxDOT contract A00197970: bids by rank

Engineer's estimate: $12,874,559.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Foremost Paving, Inc.2. Ioc Company LLC
1Removing concrete (mowstrip) (104-7005)LF3,278$4.50$7.42$5.00
2Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009)TON48,073$140.00$135.30$140.00
3Flexible pavement structure repair(8") (351-7007)SY57,313$61.00$49.70$59.70
4Planing asphalt concrete pavement(2") (354-7051)SY421,691$1.17$2.59$1.00
5Riprap (mow strip)(4 in) (432-7013)CY153$565.00$429.43$520.00
6Mobilization (500-7001)LS1$1,170,414$187,400$250,000
7Barricades, signs and traffic handling (502-7001)MO15$3,000.00$1,500.00$1,000.00
8TMA (stationary) (505-7001)DAY231$150.00$62.75$1.00
9TMA (mobile operation) (505-7003)DAY231$240.00$0.01$1.00
10Biodegradable erosion control logs (install) (12") (506-7044)LF1,230$6.32$2.50
11Biodegradable erosion control logs (remove) (506-7046)LF1,230$2.02$0.10
12Mill rumble strips (asphalt) (shoulder) (533-7001)LF76,899$0.15$0.18$0.14
13Mill rumble strips (asphalt) (centerline) (533-7002)LF29,413$0.20$0.27$0.23
14Metal W-beam guard fence (timber post) (540-7001)LF2,675$26.50$30.30$25.89
15Remove metal beam guard fence (542-7001)LF2,675$3.00$4.04$2.85
16Guardrail end treatment (install) (544-7001)EACH12$3,435.00$4,040.00$3,475.00
17Guardrail end treatment (remove) (544-7003)EACH12$300.00$404.00$305.25
18Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH7,628$1.00$1.13$1.00
19Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,550$1.00$1.13$1.00
20Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF1,066$2.50$1.22$2.93
21Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF240$3.88$2.53$3.13
22Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF16,002$1.00$0.86$0.96
23Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF4,848$6.00$5.56$7.47
24Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF1,483$2.10$2.23$3.93
25Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF1,066$0.50$1.52$0.91
26Reflectorized pavement marking type II (W) 8" (DOT) (666-7177)LF240$0.60$1.52$1.41
27Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF16,002$0.38$0.73$0.61
28Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF21,740$0.58$0.70$0.65
29Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF90,030$0.65$0.71$0.64
30Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF4,550$0.51$0.81$0.77
31Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF63,922$0.52$0.76$0.69
32Reflectorized pavement marking type II (W)6"(broken)(018 mil) (666-7530)LF21,740$0.25$0.29$0.29
33Reflectorized pavement marking type II (W)6"(solid)(018 mil) (666-7532)LF90,030$0.20$0.21$0.25
34Reflectorized pavement marking type II (Y)6"(broken)(018 mil) (666-7534)LF4,550$0.28$0.59$0.30
35Reflectorized pavement marking type II (Y)6"(solid)(018 mil) (666-7536)LF63,922$0.28$0.31$0.24
36Prefabricated PM type C (W)(arrow) (668-7091)EACH89$151.00$151.50$196.73
37Prefabricated PM type C (W)(double arrow) (668-7093)EACH4$252.50$443.91
38Prefabricated PM type C (W)(word) (668-7103)EACH87$218.00$227.25$221.95
39Prefabricated PM type C (W)(RR crossing) (668-7108)EACH7$555.50$645.69
40Prefabricated PM type C (W)(bike arrow) (668-7113)EACH39$110.00$45.45$95.84
41Prefabricated PM type C (W)(bike RR crossing) (668-7114)EACH1$454.50$242.13
42Prefabricated PM type C (W)(bike symbol) (668-7115)EACH40$200.00$126.25$161.42
43Prefabricated PM type C (W)(bike word) (668-7116)EACH1$176.75$221.95
44Reflectorized pavement marker type I-C (672-7002)EACH375$4.22$7.58$4.24
45Reflectorized pavement marker type II-A-A (672-7004)EACH1,674$3.62$7.58$3.63
46Reflectorized pavement marker type II-C-R (672-7006)EACH1,665$7.58$3.63
47Eliminating existing PM & markers (24") (677-7008)LF185$15.15$6.56
48Traffic signal CBL (type A)(16 AWG)(3 conductor) (684-7049)LF4,000$1.55$2.08$2.20
49Vehicle LP detect (sawcut) (688-7004)LF6,580$8.59$9.13
50Bonding course (3007-7001)GAL29,518$3.20$2.83$3.00
51Remove RVDS (6008-7008)EACH4$300.00$126.25$134.21
52VDS (HVDS) (VIVDS and RVDS) (6017-7014)EACH14$5,157.89$6,767.00$7,193.73
53Video imaging and radar set-UP sys (6017-7016)EACH3$846.04$656.50$697.90
54Vid image and radar det processor sys (6017-7018)EACH3$13,885$16,362$17,394
TxDOT contract A00197970: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy