TxDOT contract A00206418 bid tabulation

Traffic Signal Improvements, ARAPAHO RD (at Surveyor Boulevard to in the Town of Addison). Let by Texas DOT on July 2, 2025, Dallas, Dallas District. 4 bids received; low bid $1,120,692 by Select Maintenance, L.L.C., -1.8% against the engineer's estimate of $1,141,098.

Owner
Texas DOT
Letting
02 JUL 2025
Pay items
94
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Select Maintenance, L.L.C.$1,120,692Low-2.0%
2Durable Specialties, Inc.$1,379,061+23%+21%
3Grey Sky Construction LLC$1,401,047+25%+23%
4WG Engineering & Construction, LLC$1,408,090+26%+23%
TxDOT contract A00206418: bids by rank

Engineer's estimate: $1,141,098.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Select Maintenance, L.L.C.2. Durable Specialties, Inc.3. Grey Sky Construction LLC4. WG Engineering & Construction, LLC
1Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY10$50.00$45.00$105.00$100.00$146.20
2Removing concrete (curb & gutter) (104-7017)LF60$28.00$45.00$41.00$100.00$97.50
3Drilled shaft (traffic signal pole) (30 in) (416-7043)LF22$600.00$600.00$912.00$450.00$623.80
4Drilled shaft (traffic signal pole) (36 in) (416-7044)LF26$825.00$750.00$1,048.00$550.00$696.90
5Riprap (concrete)(6 in) (432-7003)CY3.50$1,000.00$2,500.00$905.00$650.00$2,784.70
6Mobilization (500-7001)LS1$110,000$110,000$125,000$120,000$142,499
7Barricades, signs and traffic handling (502-7001)MO3$9,000.00$33,500$29,814$8,500.00$22,833
8Portable changeable message sign (503-7001)DAY10$175.00$200.00$75.00$150.00$162.50
9TMA (stationary) (505-7001)DAY80$300.00$300.00$815.00$250.00$365.50
10Biodegradable erosion control logs (install) (18") (506-7045)LF120$10.00$5.00$2.00$12.00$7.70
11Biodegradable erosion control logs (remove) (506-7046)LF120$4.00$1.00$1.00$9.00$1.20
12Concrete curb & gutter (type II) (529-7009)LF60$115.00$50.00$225.00$55.00$162.50
13Concrete sidewalks (6") (531-7003)SY36$175.00$150.00$471.00$75.00$211.20
14Curb ramps (type 1) (531-7005)EACH2$6,000.00$2,800.00$7,100.00$3,850.00$8,446.90
15Curb ramps (type 5) (531-7008)EACH1$7,000.00$2,800.00$7,100.00$3,850.00$9,421.60
16Curb ramps (type 7) (531-7010)EACH4$7,000.00$2,800.00$7,100.00$3,850.00$8,122.10
17Remove RD IL asm (shoe-base) (610-7007)EACH3$600.00$300.00$850.00$2,500.00$1,325.60
18Conduit (PVC) (schedule 40) (3") (618-7036)LF85$27.00$25.00$36.00$30.00$30.60
19Conduit (PVC) (schedule 40) (4") (618-7040)LF40$28.00$25.00$38.00$40.00$36.40
20Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF410$40.00$40.00$79.00$60.00$44.80
21Conduit (PVC) (schedule 80) (2") (618-7054)LF95$20.00$25.00$35.00$35.00$28.80
22Electrical conductor (no.12) insulated (620-7004)LF480$2.50$2.00$2.00$3.00$2.50
23Electrical conductor (no.8) insulated (620-7008)LF740$3.00$3.00$3.00$3.00$3.60
24Electrical conductor (no.6) bare (620-7009)LF545$2.80$3.25$4.00$3.00$3.70
25Electrical conductor (no.6) insulated (620-7010)LF20$3.00$3.50$4.00$3.00$5.10
26Tray cable (3 conductor) (12 AWG) (621-7002)LF630$4.50$3.00$4.00$3.00$5.90
27Ground box type A (122311)W/apron (624-7002)EACH3$2,100.00$3,200.00$2,360.00$1,500.00$2,381.40
28Ground box type C (162911)W/apron (624-7006)EACH5$2,000.00$3,200.00$2,615.00$1,500.00$2,381.40
29Remove ground box (624-7013)EACH6$370.00$250.00$215.00$150.00$552.30
30Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH1$12,000$25,000$14,000$12,500$12,540
31Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF490$5.00$1.50$2.00$6.00$2.50
32Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF585$6.00$7.00$3.00$8.00$6.50
33Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF140$16.00$14.00$5.00$20.00$19.50
34Pavement sler 4" (666-7346)LF1,185$1.20$0.65$1.00$2.00$0.90
35Pavement sler 8" (666-7348)LF490$3.00$1.30$1.00$6.00$0.90
36Pavement sler 12" (666-7350)LF585$1.50$2.00$2.00$10.00$1.70
37Pavement sler 24" (666-7352)LF140$7.00$4.00$3.00$20.00$1.70
38Pavement sler (arrow) (666-7353)EACH6$90.00$75.00$185.00$250.00$65.00
39Pavement sler (word) (666-7354)EACH6$110.00$95.00$185.00$250.00$97.50
40Pavement sler (double arrow) (666-7356)EACH2$75.00$95.00$200.00$500.00$97.50
41Reflectorized pavement marking type I (W)4"(broken)(090MIL) (666-7401)LF320$4.00$10.00$2.00$2.00$3.30
42Reflectorized pavement marking type I (Y)4"(solid)(090MIL) (666-7416)LF865$2.00$5.00$2.00$2.00$3.30
43Prefabricated PM type C (W)(arrow) (668-7091)EACH6$350.00$255.00$515.00$250.00$568.60
44Prefabricated PM type C (W)(double arrow) (668-7093)EACH2$450.00$350.00$515.00$550.00$690.40
45Prefabricated PM type C (W)(word) (668-7103)EACH6$450.00$325.00$515.00$250.00$649.80
46Reflectorized pavement marker type II-A-A (672-7004)EACH35$12.00$10.00$2.00$6.00$16.30
47Reflectorized pavement marker type II-C-R (672-7006)EACH32$8.00$10.00$2.00$6.00$5,318.30
48Traffic button type Y (672-7008)EACH10$10.00$10.00$2.00$6.00$8.20
49Eliminating existing PM & markers (4") (677-7001)LF1,200$2.50$1.00$1.00$2.00$1.70
50Eliminating existing PM & markers (8") (677-7004)LF300$4.00$2.00$1.00$6.00$2.00
51Eliminating existing PM & markers (12") (677-7006)LF585$4.50$3.00$1.00$8.00$3.30
52Eliminating existing PM & markers (24") (677-7008)LF130$5.00$6.00$1.00$20.00$4.90
53Eliminating existing PM & markers (arrow) (677-7009)EACH7$100.00$100.00$55.00$250.00$162.50
54Eliminating existing PM & markers (double arrow) (677-7010)EACH3$175.00$175.00$55.00$250.00$243.70
55Eliminating existing PM & markers (word) (677-7015)EACH4$100.00$120.00$55.00$250.00$162.50
56Pavement surface preparation for marking (4") (678-7001)LF1,185$0.75$0.75$1.00$2.00$0.50
57Pavement surface preparation for marking (8") (678-7004)LF490$1.50$1.50$2.00$6.00$0.70
58Pavement surface preparation for marking (12") (678-7006)LF585$0.35$1.75$3.00$6.00$1.70
59Pavement surface preparation for marking (24") (678-7008)LF140$2.50$3.50$4.00$20.00$1.70
60Pavement surface preparation for marking (arrow) (678-7009)EACH6$50.00$65.00$55.00$250.00$65.00
61Pavement surface preparation for marking (double arrow) (678-7010)EACH2$90.00$85.00$70.00$500.00$97.50
62Pavement surface preparation for marking (word) (678-7016)EACH6$75.00$85.00$55.00$250.00$65.00
63Removing traffic signals (680-7004)EACH1$12,000$25,000$6,007.00$6,500.00$12,151
64Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005)EACH1$40,000$85,000$30,000$50,000$42,884
65Install highway traffic signal (upgrade) (680-7011)EACH23$9,000.00$6,115.00$25,000$6,209.50
66Vehicle signal section (12")LED(green) (682-7001)EACH19$400.00$375.00$900.00$350.00$545.80
67Vehicle signal section (12")LED(green arrow) (682-7002)EACH49$400.00$375.00$900.00$350.00$545.80
68Vehicle signal section (12")LED(yel) (682-7003)EACH19$400.00$375.00$900.00$350.00$545.80
69Vehicle signal section (12")LED(yel arrow) (682-7004)EACH98$400.00$375.00$900.00$350.00$545.80
70Vehicle signal section (12")LED(red) (682-7005)EACH19$400.00$375.00$900.00$350.00$545.80
71Vehicle signal section (12")LED(red arrow) (682-7006)EACH50$400.00$375.00$900.00$350.00$545.80
72Pedestrian signal section (LED)(countdown) (682-7018)EACH8$1,000.00$2,500.00$1,455.00$4,500.00$1,091.60
73Backplate W/reflectorized border(4 sec) (682-7037)EACH86$300.00$275.00$535.00$250.00$417.50
74Backplate W/reflectorized border(5 sec) (682-7038)EACH1$275.00$550.00$250.00$425.60
75Remove backplate (682-7051)EACH237$25.00$51.00$100.00$55.30
76Backplate W/reflectorized border(3 sec) (682-7054)EACH213$250.00$275.00$565.00$250.00$840.60
77Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF585$4.00$2.25$5.00$3.00$4.00
78Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF575$5.00$3.25$5.00$3.00$4.30
79Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036)LF545$6.00$3.25$7.00$3.00$7.40
80Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF550$7.00$12.00$10.00$3.00$11.60
81Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF1,135$4.00$2.00$5.00$3.00$3.80
82Install RDSD FLSH BCN assembly (solar PWRD) (685-7004)EACH1$10,000$8,500.00$19,000$12,500$10,854
83Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH2$16,000$15,000$34,000$18,000$21,020
84Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH1$19,000$17,000$39,000$22,000$24,269
85Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH1$20,000$18,000$41,000$25,000$25,081
86Pedestrian pole assembly (687-7001)EACH4$3,600.00$3,500.00$7,000.00$4,500.00$5,782.90
87Pedestrian detect push button (APS) (688-7001)EACH8$1,500.00$2,500.00$1,485.00$1,850.00$1,637.40
88Pedestrian detector controller unit (688-7003)EACH1$5,000.00$6,500.00$7,100.00$4,500.00$5,536.00
89VIVDS prosr sys (install only) (6006-7009)EACH1$1,350.00$1,500.00$750.00$3,000.00$1,150.10
90VIVDS cam assy (install only) (6006-7010)EACH4$1,500.00$2,500.00$1,800.00$3,000.00$994.20
91VIVDS cabling (install only) (6006-7012)LF740$3.00$3.00$2.00$3.00$2.30
92Bbu system (external battery cabinet) (6007-7001)EACH1$9,500.00$25,000$9,200.00$8,500.00$12,899
93CCTV field equip (digital) (install only) (6018-7001)EACH1$50,000$7,500.00$1,010.00$3,000.00$3,021.40
94ITS com CBL (ethernet) (6018-7004)LF60$10.00$8.00$5.00$3.00$6.30
TxDOT contract A00206418: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy