TxDOT contract A00206418 bid tabulation
Traffic Signal Improvements, ARAPAHO RD (at Surveyor Boulevard to in the Town of Addison). Let by Texas DOT on July 2, 2025, Dallas, Dallas District. 4 bids received; low bid $1,120,692 by Select Maintenance, L.L.C., -1.8% against the engineer's estimate of $1,141,098.
- Owner
- Texas DOT
- Letting
- 02 JUL 2025
- Pay items
- 94
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Select Maintenance, L.L.C. | $1,120,692 | Low | -2.0% |
| 2 | Durable Specialties, Inc. | $1,379,061 | +23% | +21% |
| 3 | Grey Sky Construction LLC | $1,401,047 | +25% | +23% |
| 4 | WG Engineering & Construction, LLC | $1,408,090 | +26% | +23% |
Engineer's estimate: $1,141,098.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Select Maintenance, L.L.C. | 2. Durable Specialties, Inc. | 3. Grey Sky Construction LLC | 4. WG Engineering & Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 10 | $50.00 | $45.00 | $105.00 | $100.00 | $146.20 |
| 2 | Removing concrete (curb & gutter) (104-7017) | LF | 60 | $28.00 | $45.00 | $41.00 | $100.00 | $97.50 |
| 3 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $600.00 | $600.00 | $912.00 | $450.00 | $623.80 |
| 4 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $825.00 | $750.00 | $1,048.00 | $550.00 | $696.90 |
| 5 | Riprap (concrete)(6 in) (432-7003) | CY | 3.50 | $1,000.00 | $2,500.00 | $905.00 | $650.00 | $2,784.70 |
| 6 | Mobilization (500-7001) | LS | 1 | $110,000 | $110,000 | $125,000 | $120,000 | $142,499 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $9,000.00 | $33,500 | $29,814 | $8,500.00 | $22,833 |
| 8 | Portable changeable message sign (503-7001) | DAY | 10 | $175.00 | $200.00 | $75.00 | $150.00 | $162.50 |
| 9 | TMA (stationary) (505-7001) | DAY | 80 | $300.00 | $300.00 | $815.00 | $250.00 | $365.50 |
| 10 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 120 | $10.00 | $5.00 | $2.00 | $12.00 | $7.70 |
| 11 | Biodegradable erosion control logs (remove) (506-7046) | LF | 120 | $4.00 | $1.00 | $1.00 | $9.00 | $1.20 |
| 12 | Concrete curb & gutter (type II) (529-7009) | LF | 60 | $115.00 | $50.00 | $225.00 | $55.00 | $162.50 |
| 13 | Concrete sidewalks (6") (531-7003) | SY | 36 | $175.00 | $150.00 | $471.00 | $75.00 | $211.20 |
| 14 | Curb ramps (type 1) (531-7005) | EACH | 2 | $6,000.00 | $2,800.00 | $7,100.00 | $3,850.00 | $8,446.90 |
| 15 | Curb ramps (type 5) (531-7008) | EACH | 1 | $7,000.00 | $2,800.00 | $7,100.00 | $3,850.00 | $9,421.60 |
| 16 | Curb ramps (type 7) (531-7010) | EACH | 4 | $7,000.00 | $2,800.00 | $7,100.00 | $3,850.00 | $8,122.10 |
| 17 | Remove RD IL asm (shoe-base) (610-7007) | EACH | 3 | $600.00 | $300.00 | $850.00 | $2,500.00 | $1,325.60 |
| 18 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 85 | $27.00 | $25.00 | $36.00 | $30.00 | $30.60 |
| 19 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 40 | $28.00 | $25.00 | $38.00 | $40.00 | $36.40 |
| 20 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 410 | $40.00 | $40.00 | $79.00 | $60.00 | $44.80 |
| 21 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 95 | $20.00 | $25.00 | $35.00 | $35.00 | $28.80 |
| 22 | Electrical conductor (no.12) insulated (620-7004) | LF | 480 | $2.50 | $2.00 | $2.00 | $3.00 | $2.50 |
| 23 | Electrical conductor (no.8) insulated (620-7008) | LF | 740 | $3.00 | $3.00 | $3.00 | $3.00 | $3.60 |
| 24 | Electrical conductor (no.6) bare (620-7009) | LF | 545 | $2.80 | $3.25 | $4.00 | $3.00 | $3.70 |
| 25 | Electrical conductor (no.6) insulated (620-7010) | LF | 20 | $3.00 | $3.50 | $4.00 | $3.00 | $5.10 |
| 26 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 630 | $4.50 | $3.00 | $4.00 | $3.00 | $5.90 |
| 27 | Ground box type A (122311)W/apron (624-7002) | EACH | 3 | $2,100.00 | $3,200.00 | $2,360.00 | $1,500.00 | $2,381.40 |
| 28 | Ground box type C (162911)W/apron (624-7006) | EACH | 5 | $2,000.00 | $3,200.00 | $2,615.00 | $1,500.00 | $2,381.40 |
| 29 | Remove ground box (624-7013) | EACH | 6 | $370.00 | $250.00 | $215.00 | $150.00 | $552.30 |
| 30 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 1 | $12,000 | $25,000 | $14,000 | $12,500 | $12,540 |
| 31 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 490 | $5.00 | $1.50 | $2.00 | $6.00 | $2.50 |
| 32 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 585 | $6.00 | $7.00 | $3.00 | $8.00 | $6.50 |
| 33 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 140 | $16.00 | $14.00 | $5.00 | $20.00 | $19.50 |
| 34 | Pavement sler 4" (666-7346) | LF | 1,185 | $1.20 | $0.65 | $1.00 | $2.00 | $0.90 |
| 35 | Pavement sler 8" (666-7348) | LF | 490 | $3.00 | $1.30 | $1.00 | $6.00 | $0.90 |
| 36 | Pavement sler 12" (666-7350) | LF | 585 | $1.50 | $2.00 | $2.00 | $10.00 | $1.70 |
| 37 | Pavement sler 24" (666-7352) | LF | 140 | $7.00 | $4.00 | $3.00 | $20.00 | $1.70 |
| 38 | Pavement sler (arrow) (666-7353) | EACH | 6 | $90.00 | $75.00 | $185.00 | $250.00 | $65.00 |
| 39 | Pavement sler (word) (666-7354) | EACH | 6 | $110.00 | $95.00 | $185.00 | $250.00 | $97.50 |
| 40 | Pavement sler (double arrow) (666-7356) | EACH | 2 | $75.00 | $95.00 | $200.00 | $500.00 | $97.50 |
| 41 | Reflectorized pavement marking type I (W)4"(broken)(090MIL) (666-7401) | LF | 320 | $4.00 | $10.00 | $2.00 | $2.00 | $3.30 |
| 42 | Reflectorized pavement marking type I (Y)4"(solid)(090MIL) (666-7416) | LF | 865 | $2.00 | $5.00 | $2.00 | $2.00 | $3.30 |
| 43 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 6 | $350.00 | $255.00 | $515.00 | $250.00 | $568.60 |
| 44 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $450.00 | $350.00 | $515.00 | $550.00 | $690.40 |
| 45 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 6 | $450.00 | $325.00 | $515.00 | $250.00 | $649.80 |
| 46 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 35 | $12.00 | $10.00 | $2.00 | $6.00 | $16.30 |
| 47 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 32 | $8.00 | $10.00 | $2.00 | $6.00 | $5,318.30 |
| 48 | Traffic button type Y (672-7008) | EACH | 10 | $10.00 | $10.00 | $2.00 | $6.00 | $8.20 |
| 49 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,200 | $2.50 | $1.00 | $1.00 | $2.00 | $1.70 |
| 50 | Eliminating existing PM & markers (8") (677-7004) | LF | 300 | $4.00 | $2.00 | $1.00 | $6.00 | $2.00 |
| 51 | Eliminating existing PM & markers (12") (677-7006) | LF | 585 | $4.50 | $3.00 | $1.00 | $8.00 | $3.30 |
| 52 | Eliminating existing PM & markers (24") (677-7008) | LF | 130 | $5.00 | $6.00 | $1.00 | $20.00 | $4.90 |
| 53 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 7 | $100.00 | $100.00 | $55.00 | $250.00 | $162.50 |
| 54 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 3 | $175.00 | $175.00 | $55.00 | $250.00 | $243.70 |
| 55 | Eliminating existing PM & markers (word) (677-7015) | EACH | 4 | $100.00 | $120.00 | $55.00 | $250.00 | $162.50 |
| 56 | Pavement surface preparation for marking (4") (678-7001) | LF | 1,185 | $0.75 | $0.75 | $1.00 | $2.00 | $0.50 |
| 57 | Pavement surface preparation for marking (8") (678-7004) | LF | 490 | $1.50 | $1.50 | $2.00 | $6.00 | $0.70 |
| 58 | Pavement surface preparation for marking (12") (678-7006) | LF | 585 | $0.35 | $1.75 | $3.00 | $6.00 | $1.70 |
| 59 | Pavement surface preparation for marking (24") (678-7008) | LF | 140 | $2.50 | $3.50 | $4.00 | $20.00 | $1.70 |
| 60 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 6 | $50.00 | $65.00 | $55.00 | $250.00 | $65.00 |
| 61 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $90.00 | $85.00 | $70.00 | $500.00 | $97.50 |
| 62 | Pavement surface preparation for marking (word) (678-7016) | EACH | 6 | $75.00 | $85.00 | $55.00 | $250.00 | $65.00 |
| 63 | Removing traffic signals (680-7004) | EACH | 1 | $12,000 | $25,000 | $6,007.00 | $6,500.00 | $12,151 |
| 64 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 1 | $40,000 | $85,000 | $30,000 | $50,000 | $42,884 |
| 65 | Install highway traffic signal (upgrade) (680-7011) | EACH | 23 | $9,000.00 | $6,115.00 | $25,000 | $6,209.50 | |
| 66 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 19 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 67 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 49 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 68 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 19 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 69 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 98 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 70 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 19 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 71 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 50 | $400.00 | $375.00 | $900.00 | $350.00 | $545.80 |
| 72 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $1,000.00 | $2,500.00 | $1,455.00 | $4,500.00 | $1,091.60 |
| 73 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 86 | $300.00 | $275.00 | $535.00 | $250.00 | $417.50 |
| 74 | Backplate W/reflectorized border(5 sec) (682-7038) | EACH | 1 | $275.00 | $550.00 | $250.00 | $425.60 | |
| 75 | Remove backplate (682-7051) | EACH | 237 | $25.00 | $51.00 | $100.00 | $55.30 | |
| 76 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 213 | $250.00 | $275.00 | $565.00 | $250.00 | $840.60 |
| 77 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 585 | $4.00 | $2.25 | $5.00 | $3.00 | $4.00 |
| 78 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 575 | $5.00 | $3.25 | $5.00 | $3.00 | $4.30 |
| 79 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 545 | $6.00 | $3.25 | $7.00 | $3.00 | $7.40 |
| 80 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 550 | $7.00 | $12.00 | $10.00 | $3.00 | $11.60 |
| 81 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,135 | $4.00 | $2.00 | $5.00 | $3.00 | $3.80 |
| 82 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 1 | $10,000 | $8,500.00 | $19,000 | $12,500 | $10,854 |
| 83 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $16,000 | $15,000 | $34,000 | $18,000 | $21,020 |
| 84 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $19,000 | $17,000 | $39,000 | $22,000 | $24,269 |
| 85 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $20,000 | $18,000 | $41,000 | $25,000 | $25,081 |
| 86 | Pedestrian pole assembly (687-7001) | EACH | 4 | $3,600.00 | $3,500.00 | $7,000.00 | $4,500.00 | $5,782.90 |
| 87 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,500.00 | $2,500.00 | $1,485.00 | $1,850.00 | $1,637.40 |
| 88 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $5,000.00 | $6,500.00 | $7,100.00 | $4,500.00 | $5,536.00 |
| 89 | VIVDS prosr sys (install only) (6006-7009) | EACH | 1 | $1,350.00 | $1,500.00 | $750.00 | $3,000.00 | $1,150.10 |
| 90 | VIVDS cam assy (install only) (6006-7010) | EACH | 4 | $1,500.00 | $2,500.00 | $1,800.00 | $3,000.00 | $994.20 |
| 91 | VIVDS cabling (install only) (6006-7012) | LF | 740 | $3.00 | $3.00 | $2.00 | $3.00 | $2.30 |
| 92 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $9,500.00 | $25,000 | $9,200.00 | $8,500.00 | $12,899 |
| 93 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 1 | $50,000 | $7,500.00 | $1,010.00 | $3,000.00 | $3,021.40 |
| 94 | ITS com CBL (ethernet) (6018-7004) | LF | 60 | $10.00 | $8.00 | $5.00 | $3.00 | $6.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.