| 1 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 3 | $1,047.33 | $1,374.90 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 74 | $45.93 | $13.61 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 22 | $55.02 | $13.62 |
| 4 | Removing concrete (curb) (104-7016) | LF | 33 | $18.00 | $25.28 |
| 5 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 518 | $9.50 | $13.61 |
| 6 | Excavation (roadway) (110-7001) | CY | 464 | $39.31 | $32.95 |
| 7 | Embankment (final)(DC)(type A) (132-7002) | CY | 76 | $21.82 | $77.47 |
| 8 | Loose aggregate GRND cover (192-7022) | SY | 1,027 | $30.00 | $15.52 |
| 9 | Prime coat (multi option) (310-7015) | GAL | 30 | $18.44 | $15.81 |
| 10 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 21 | $255.80 | $212.87 |
| 11 | D-GR HMA type-C sac-A PG70-22 (exempt) (341-7025) | TON | 98 | $353.35 | $212.87 |
| 12 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 24 | $349.67 | $456.68 |
| 13 | Adjusting manholes (479-7001) | EACH | 1 | $1,576.43 | $1,125.80 |
| 14 | Adjusting manholes (water meter) (479-7008) | EACH | 17 | $788.22 | $662.97 |
| 15 | Remove STR (bollard) (496-7028) | EACH | 5 | $594.35 | $1,157.06 |
| 16 | Removing structure (pipe) (496-7037) | EACH | 1 | $500.00 | $1,157.06 |
| 17 | Mobilization (500-7001) | LS | 1 | $60,000 | $41,654 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $8,500.00 | $8,337.86 |
| 19 | Portable changeable message sign (503-7001) | DAY | 32 | $140.00 | $84.15 |
| 20 | TMA (stationary) (505-7001) | DAY | 111 | $275.00 | $336.60 |
| 21 | TMA (mobile operation) (505-7003) | DAY | 4 | $489.52 | $1,402.50 |
| 22 | Temporary sediment control fence (install) (506-7039) | LF | 4,559 | $5.17 | $6.15 |
| 23 | Temporary sediment control fence (remove) (506-7041) | LF | 4,559 | $1.59 | $1.99 |
| 24 | Concrete curb (type II) (529-7002) | LF | 464 | $45.25 | $19.03 |
| 25 | Concrete curb (special) (529-7027) | LF | 3,171 | $80.00 | $97.91 |
| 26 | Driveways (concrete) (530-7006) | SY | 1,104 | $131.45 | $82.71 |
| 27 | Concrete sidewalks (5") (531-7002) | SY | 1,814 | $91.98 | $69.65 |
| 28 | Curb ramps (type 2) (531-7006) | EACH | 2 | $2,718.22 | $1,857.76 |
| 29 | Curb ramps (type 7) (531-7010) | EACH | 5 | $2,741.41 | $1,823.68 |
| 30 | Concrete directional island (536-7004) | SY | 70 | $140.13 | $108.87 |
| 31 | Chain link fence (install) (6') (550-7001) | LF | 163 | $38.17 | $84.15 |
| 32 | Chain link fence (remove) (550-7007) | LF | 146 | $18.19 | $52.51 |
| 33 | Wire fence (type B) (552-7002) | LF | 119 | $45.00 | $84.15 |
| 34 | Wire fence (remove) (552-7011) | LF | 106 | $7.04 | $50.40 |
| 35 | Relocate existing mailbox (560-7012) | EACH | 15 | $484.68 | $380.60 |
| 36 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 3 | $3,800.00 | $3,930.84 |
| 37 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 465 | $19.16 | $23.63 |
| 38 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,485 | $3.04 | $3.91 |
| 39 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $2,096.89 | $1,891.07 |
| 40 | Remove ground box (624-7013) | EACH | 3 | $500.00 | $620.63 |
| 41 | Remove electrical services (628-7002) | EACH | 2 | $914.90 | $1,149.78 |
| 42 | Elc SRV type A 120/240 060(NS)SS(E)GC(O) (628-7006) | EACH | 1 | $10,000 | $13,215 |
| 43 | Elc SRV type D 120/240 060(NS)SS(E)GC(O) (628-7145) | EACH | 1 | $10,000 | $12,986 |
| 44 | Aluminum signs (type A) (636-7001) | SF | 54 | $49.39 | $43.18 |
| 45 | Replace existing aluminum signs(type A) (636-7004) | SF | 33 | $46.27 | $39.35 |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 15 | $838.41 | $1,156.75 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 2 | $894.44 | $1,222.10 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $1,000.00 | $1,266.85 |
| 49 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 4 | $1,250.36 | $1,566.61 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 7 | $1,086.80 | $1,598.63 |
| 51 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $727.13 | $557.23 |
| 52 | Remove SM RD SN sup&AM (644-7073) | EACH | 18 | $157.77 | $152.98 |
| 53 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 2 | $110.00 | $68.85 |
| 54 | Install delineator assembly (D-SW)SZ 2(WC)GND (658-7009) | EACH | 7 | $52.00 | $46.71 |
| 55 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 1 | $85.29 | $46.71 |
| 56 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 120 | $3.83 | $2.29 |
| 57 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 80 | $3.47 | $2.29 |
| 58 | Reflectorized pavement marking type I (W)8"(broken)(090MIL) (666-7014) | LF | 12 | $2.00 | $3.30 |
| 59 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 728 | $1.88 | $2.55 |
| 60 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 142 | $1.00 | $5.72 |
| 61 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 764 | $10.05 | $12.17 |
| 62 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 20 | $180.00 | $210.38 |
| 63 | Reflectorized pavement marking type I (W)(number)(090MIL) (666-7062) | EACH | 4 | $125.00 | $231.41 |
| 64 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 10 | $200.00 | $220.19 |
| 65 | Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086) | EACH | 9 | $48.33 | $78.96 |
| 66 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,734 | $0.95 | $1.30 |
| 67 | Reflectorized pavement marking type II (W) 8" (broken) (666-7176) | LF | 12 | $2.00 | $1.22 |
| 68 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 728 | $0.44 | $1.02 |
| 69 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 142 | $2.50 | $2.88 |
| 70 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 764 | $3.00 | $5.96 |
| 71 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 20 | $50.00 | $137.45 |
| 72 | Reflectorized pavement marking type II (W) (number) (666-7193) | EACH | 4 | $100.00 | $152.87 |
| 73 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 10 | $75.00 | $127.98 |
| 74 | Reflectorized pavement marking type II (W) 18" (yld tri) (666-7200) | EACH | 9 | $29.75 | $85.90 |
| 75 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 1,070 | $0.58 | $1.60 |
| 76 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 8,789 | $0.60 | $0.38 |
| 77 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 2,734 | $0.82 | $0.35 |
| 78 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 1,070 | $0.91 | $1.05 |
| 79 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 8,789 | $0.95 | $1.28 |
| 80 | Reflectorized pavement marker type I-C (672-7002) | EACH | 34 | $6.13 | $12.41 |
| 81 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 345 | $6.54 | $12.41 |
| 82 | Eliminating existing PM & markers (6") (677-7002) | LF | 15,460 | $0.78 | $1.16 |
| 83 | Eliminating existing PM & markers (8") (677-7004) | LF | 684 | $1.34 | $1.33 |
| 84 | Eliminating existing PM & markers (12") (677-7006) | LF | 112 | $1.91 | $7.74 |
| 85 | Eliminating existing PM & markers (24") (677-7008) | LF | 311 | $4.24 | $10.32 |
| 86 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 10 | $83.91 | $232.13 |
| 87 | Eliminating existing PM & markers (word) (677-7015) | EACH | 3 | $92.11 | $206.34 |
| 88 | Pavement surface preparation for marking (6") (678-7002) | LF | 12,605 | $0.44 | $0.28 |
| 89 | Pavement surface preparation for marking (8") (678-7004) | LF | 728 | $0.46 | $0.32 |
| 90 | Pavement surface preparation for marking (12") (678-7006) | LF | 142 | $0.66 | $0.38 |
| 91 | Pavement surface preparation for marking (24") (678-7008) | LF | 764 | $3.14 | $0.52 |
| 92 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 20 | $58.77 | $54.56 |
| 93 | Pavement surface preparation for marking (number) (678-7015) | EACH | 4 | $31.70 | $58.91 |
| 94 | Pavement surface preparation for marking (word) (678-7016) | EACH | 10 | $37.13 | $109.40 |
| 95 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 9 | $19.99 | $63.11 |
| 96 | Install highway traffic signal (upgrade) (680-7011) | EACH | 2 | $8,000.00 | $23,497 |
| 97 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $367.92 | $415.03 |
| 98 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $353.95 | $415.03 |
| 99 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 3 | $353.14 | $415.03 |
| 100 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 14 | $214.61 | $211.43 |
| 101 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 3 | $237.71 | $265.40 |
| 102 | Pedestrian detect push button (standard) (688-7002) | EACH | 1 | $450.00 | $596.55 |
| 103 | Ground box (adjust) (6013-7007) | EACH | 1 | $550.00 | $662.68 |
| 104 | ITS radio (SNGL)(900 MHZ)-I-O (6014-7009) | EACH | 1 | $1,800.00 | $7,095.64 |
| 105 | ITS radio (SNGL)(900 MHZ)-I-U (6014-7010) | EACH | 2 | $2,300.00 | $7,095.64 |
| 106 | LED roadside sign (6066-7001) | EACH | 6 | $5,772.85 | $4,392.85 |
| 107 | Install driver FDBK speed sign assembly (6075-7004) | EACH | 4 | $9,890.75 | $6,271.98 |
| 108 | Remove existing cables (power) (6106-7002) | LF | 20 | $1.98 | $6.20 |