TxDOT contract A00206569 bid tabulation

Hazard Elimination & Safety, FM 258 (WINN RD to BELEN RD). Let by Texas DOT on July 2, 2025, El Paso, El Paso District. 1 bid received; low bid $1,219,020 by Horizone Construction I, LTD, -0.1% against the engineer's estimate of $1,220,792.

Owner
Texas DOT
Letting
02 JUL 2025
Pay items
108
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Horizone Construction I, LTD$1,219,020Low0.0%
TxDOT contract A00206569: bids by rank

Engineer's estimate: $1,220,792.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Horizone Construction I, LTD
1Preparation row (tree remove) (24"-36" diameter) (100-7005)EACH3$1,047.33$1,374.90
2Removing concrete (driveways) (104-7011)SY74$45.93$13.61
3Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY22$55.02$13.62
4Removing concrete (curb) (104-7016)LF33$18.00$25.28
5Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046)SY518$9.50$13.61
6Excavation (roadway) (110-7001)CY464$39.31$32.95
7Embankment (final)(DC)(type A) (132-7002)CY76$21.82$77.47
8Loose aggregate GRND cover (192-7022)SY1,027$30.00$15.52
9Prime coat (multi option) (310-7015)GAL30$18.44$15.81
10D-GR HMA type-B PG64-22 (exempt) (341-7003)TON21$255.80$212.87
11D-GR HMA type-C sac-A PG70-22 (exempt) (341-7025)TON98$353.35$212.87
12Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF24$349.67$456.68
13Adjusting manholes (479-7001)EACH1$1,576.43$1,125.80
14Adjusting manholes (water meter) (479-7008)EACH17$788.22$662.97
15Remove STR (bollard) (496-7028)EACH5$594.35$1,157.06
16Removing structure (pipe) (496-7037)EACH1$500.00$1,157.06
17Mobilization (500-7001)LS1$60,000$41,654
18Barricades, signs and traffic handling (502-7001)MO7$8,500.00$8,337.86
19Portable changeable message sign (503-7001)DAY32$140.00$84.15
20TMA (stationary) (505-7001)DAY111$275.00$336.60
21TMA (mobile operation) (505-7003)DAY4$489.52$1,402.50
22Temporary sediment control fence (install) (506-7039)LF4,559$5.17$6.15
23Temporary sediment control fence (remove) (506-7041)LF4,559$1.59$1.99
24Concrete curb (type II) (529-7002)LF464$45.25$19.03
25Concrete curb (special) (529-7027)LF3,171$80.00$97.91
26Driveways (concrete) (530-7006)SY1,104$131.45$82.71
27Concrete sidewalks (5") (531-7002)SY1,814$91.98$69.65
28Curb ramps (type 2) (531-7006)EACH2$2,718.22$1,857.76
29Curb ramps (type 7) (531-7010)EACH5$2,741.41$1,823.68
30Concrete directional island (536-7004)SY70$140.13$108.87
31Chain link fence (install) (6') (550-7001)LF163$38.17$84.15
32Chain link fence (remove) (550-7007)LF146$18.19$52.51
33Wire fence (type B) (552-7002)LF119$45.00$84.15
34Wire fence (remove) (552-7011)LF106$7.04$50.40
35Relocate existing mailbox (560-7012)EACH15$484.68$380.60
36Relocate RD IL asm (trans-base) (610-7004)EACH3$3,800.00$3,930.84
37Conduit (PVC) (schedule 40) (2") (618-7030)LF465$19.16$23.63
38Electrical conductor (no.6) insulated (620-7010)LF1,485$3.04$3.91
39Ground box type A (122311)W/apron (624-7002)EACH1$2,096.89$1,891.07
40Remove ground box (624-7013)EACH3$500.00$620.63
41Remove electrical services (628-7002)EACH2$914.90$1,149.78
42Elc SRV type A 120/240 060(NS)SS(E)GC(O) (628-7006)EACH1$10,000$13,215
43Elc SRV type D 120/240 060(NS)SS(E)GC(O) (628-7145)EACH1$10,000$12,986
44Aluminum signs (type A) (636-7001)SF54$49.39$43.18
45Replace existing aluminum signs(type A) (636-7004)SF33$46.27$39.35
46Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH15$838.41$1,156.75
47Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH2$894.44$1,222.10
48Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$1,000.00$1,266.85
49Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH4$1,250.36$1,566.61
50Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH7$1,086.80$1,598.63
51Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH2$727.13$557.23
52Remove SM RD SN sup&AM (644-7073)EACH18$157.77$152.98
53Remove SM RD SN sup&AM (sign only) (644-7075)EACH2$110.00$68.85
54Install delineator assembly (D-SW)SZ 2(WC)GND (658-7009)EACH7$52.00$46.71
55Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057)EACH1$85.29$46.71
56Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH120$3.83$2.29
57Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH80$3.47$2.29
58Reflectorized pavement marking type I (W)8"(broken)(090MIL) (666-7014)LF12$2.00$3.30
59Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF728$1.88$2.55
60Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF142$1.00$5.72
61Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF764$10.05$12.17
62Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH20$180.00$210.38
63Reflectorized pavement marking type I (W)(number)(090MIL) (666-7062)EACH4$125.00$231.41
64Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH10$200.00$220.19
65Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086)EACH9$48.33$78.96
66Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF2,734$0.95$1.30
67Reflectorized pavement marking type II (W) 8" (broken) (666-7176)LF12$2.00$1.22
68Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF728$0.44$1.02
69Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF142$2.50$2.88
70Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF764$3.00$5.96
71Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH20$50.00$137.45
72Reflectorized pavement marking type II (W) (number) (666-7193)EACH4$100.00$152.87
73Reflectorized pavement marking type II (W) (word) (666-7194)EACH10$75.00$127.98
74Reflectorized pavement marking type II (W) 18" (yld tri) (666-7200)EACH9$29.75$85.90
75Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF1,070$0.58$1.60
76Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF8,789$0.60$0.38
77Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF2,734$0.82$0.35
78Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF1,070$0.91$1.05
79Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF8,789$0.95$1.28
80Reflectorized pavement marker type I-C (672-7002)EACH34$6.13$12.41
81Reflectorized pavement marker type II-A-A (672-7004)EACH345$6.54$12.41
82Eliminating existing PM & markers (6") (677-7002)LF15,460$0.78$1.16
83Eliminating existing PM & markers (8") (677-7004)LF684$1.34$1.33
84Eliminating existing PM & markers (12") (677-7006)LF112$1.91$7.74
85Eliminating existing PM & markers (24") (677-7008)LF311$4.24$10.32
86Eliminating existing PM & markers (arrow) (677-7009)EACH10$83.91$232.13
87Eliminating existing PM & markers (word) (677-7015)EACH3$92.11$206.34
88Pavement surface preparation for marking (6") (678-7002)LF12,605$0.44$0.28
89Pavement surface preparation for marking (8") (678-7004)LF728$0.46$0.32
90Pavement surface preparation for marking (12") (678-7006)LF142$0.66$0.38
91Pavement surface preparation for marking (24") (678-7008)LF764$3.14$0.52
92Pavement surface preparation for marking (arrow) (678-7009)EACH20$58.77$54.56
93Pavement surface preparation for marking (number) (678-7015)EACH4$31.70$58.91
94Pavement surface preparation for marking (word) (678-7016)EACH10$37.13$109.40
95Pavement surface preparation for marking (18")(yld tri) (678-7022)EACH9$19.99$63.11
96Install highway traffic signal (upgrade) (680-7011)EACH2$8,000.00$23,497
97Vehicle signal section (12")LED(green arrow) (682-7002)EACH3$367.92$415.03
98Vehicle signal section (12")LED(yel arrow) (682-7004)EACH6$353.95$415.03
99Vehicle signal section (12")LED(red arrow) (682-7006)EACH3$353.14$415.03
100Backplate W/reflectorized border(3 sec)aluminum (682-7039)EACH14$214.61$211.43
101Backplate W/reflectorized border(4 sec)aluminum (682-7040)EACH3$237.71$265.40
102Pedestrian detect push button (standard) (688-7002)EACH1$450.00$596.55
103Ground box (adjust) (6013-7007)EACH1$550.00$662.68
104ITS radio (SNGL)(900 MHZ)-I-O (6014-7009)EACH1$1,800.00$7,095.64
105ITS radio (SNGL)(900 MHZ)-I-U (6014-7010)EACH2$2,300.00$7,095.64
106LED roadside sign (6066-7001)EACH6$5,772.85$4,392.85
107Install driver FDBK speed sign assembly (6075-7004)EACH4$9,890.75$6,271.98
108Remove existing cables (power) (6106-7002)LF20$1.98$6.20
TxDOT contract A00206569: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy