TxDOT contract A00207949 bid tabulation
Infrastructure Improvements, SS 371 (US 90 to Billy Mitchell Blvd). Let by Texas DOT on December 2, 2025, Bexar, San Antonio District. 7 bids received; low bid $1,759,161 by Vaca Underground Utilities Inc, -3.7% against the engineer's estimate of $1,826,588.
- Owner
- Texas DOT
- Letting
- 02 DEC 2025
- Pay items
- 29
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vaca Underground Utilities Inc | $1,759,161 | Low | -4.0% |
| 2 | The Levy Company, Inc. | $1,907,479 | +8.0% | +4.0% |
| 3 | E-Z Bel Construction, LLC | $2,081,257 | +18% | +14% |
| 4 | Florida Traffic Control Devices, Inc. | $2,196,800 | +25% | +20% |
| 5 | Elecnor Belco Electric, Inc. | $2,267,419 | +29% | +24% |
| 6 | Highway Intelligent Traffic Solutions, Inc. | $2,398,671 | +36% | +31% |
| 7 | F & W Electrical Contractors, Inc. | $2,495,780 | +42% | +37% |
Engineer's estimate: $1,826,588.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Vaca Underground Utilities Inc | 2. The Levy Company, Inc. | 3. E-Z Bel Construction, LLC | 4. Florida Traffic Control Devices, Inc. | 5. Elecnor Belco Electric, Inc. | 6. Highway Intelligent Traffic Solutions, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (high mast pole) (48 in) (416-7035) | LF | 22 | $600.00 | $500.00 | $460.44 | $480.00 | $1,015.00 | $505.00 | $892.58 |
| 2 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 988 | $300.00 | $225.00 | $244.06 | $280.00 | $465.00 | $333.00 | $286.18 |
| 3 | Riprap (concrete)(CL B) (432-7005) | CY | 43.05 | $550.00 | $650.00 | $864.91 | $970.00 | $1,035.00 | $300.00 | $1,035.97 |
| 4 | Mobilization (500-7001) | LS | 1 | $200,000 | $95,000 | $190,748 | $200,000 | $217,000 | $122,000 | $237,973 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $4,000.00 | $3,000.00 | $6,398.40 | $7,800.00 | $10,785 | $4,000.00 | $10,933 |
| 6 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $4,500.00 | $4,364.45 | $4,000.00 | $157.00 | $2,500.00 | $13,333 |
| 7 | TMA (stationary) (505-7001) | DAY | 213 | $150.00 | $150.00 | $54.91 | $300.00 | $157.00 | $168.00 | $257.57 |
| 8 | TMA (mobile operation) (505-7003) | DAY | 10 | $200.00 | $150.00 | $54.91 | $580.00 | $157.00 | $335.00 | $380.68 |
| 9 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 60 | $6.50 | $1.00 | $5.04 | $5.55 | $172.00 | $6.00 | $13.33 |
| 10 | Biodegradable erosion control logs (remove) (506-7046) | LF | 60 | $1.00 | $1.00 | $1.88 | $1.25 | $18.00 | $3.00 | $1.33 |
| 11 | Remove RD IL asm (trans-base) (610-7009) | EACH | 156 | $350.00 | $650.00 | $863.83 | $750.00 | $725.00 | $910.00 | $671.60 |
| 12 | Replace luminaire W/(250W EQ) LED (610-7012) | EACH | 5 | $625.00 | $550.00 | $603.26 | $540.00 | $500.00 | $625.00 | $682.76 |
| 13 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 2 | $1,200.00 | $800.00 | $2,158.60 | $2,300.00 | $1,290.00 | $2,374.00 | $1,699.14 |
| 14 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 121 | $3,000.00 | $4,500.00 | $3,723.46 | $4,750.00 | $4,465.00 | $5,572.00 | $4,907.84 |
| 15 | In RD IL (type SA) 50T-8 (400W EQ) LED (610-7196) | EACH | 2 | $4,650.00 | $4,800.00 | $4,315.29 | $5,000.00 | $4,743.00 | $5,913.00 | $5,851.41 |
| 16 | HI MST IL pole (100 FT)( 80 MPH) (613-7001) | EACH | 1 | $37,000 | $40,000 | $33,892 | $80,000 | $31,862 | $35,063 | $44,385 |
| 17 | LED HI MST IL asm (6 fixt) (type A) (614-7002) | EACH | 1 | $36,000 | $42,000 | $49,777 | $13,000 | $42,900 | $50,915 | $44,903 |
| 18 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 24,509 | $14.00 | $9.50 | $12.17 | $9.00 | $10.50 | $13.52 | $11.56 |
| 19 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 2,734 | $20.00 | $11.00 | $26.71 | $27.20 | $15.80 | $19.85 | $33.13 |
| 20 | Conduit (RM) (1") (618-7072) | LF | 764 | $25.00 | $18.00 | $29.49 | $26.00 | $19.40 | $37.92 | $20.99 |
| 21 | Conduit (prepare) (618-7090) | LF | 744 | $2.50 | $2.00 | $1.37 | $1.12 | $3.75 | $10.28 | $2.88 |
| 22 | Electrical conductor (no.8) bare (620-7007) | LF | 28,007 | $1.50 | $1.85 | $1.48 | $1.70 | $1.35 | $2.54 | $2.29 |
| 23 | Electrical conductor (no.8) insulated (620-7008) | LF | 63,148 | $1.75 | $2.00 | $1.58 | $2.00 | $1.75 | $2.60 | $2.48 |
| 24 | Ground box type A (122311) (624-7001) | EACH | 36 | $950.00 | $1,200.00 | $1,240.84 | $850.00 | $545.00 | $1,435.00 | $1,686.92 |
| 25 | Ground box type A (122311)W/apron (624-7002) | EACH | 21 | $1,500.00 | $1,500.00 | $1,540.41 | $850.00 | $1,300.00 | $1,368.00 | $1,927.01 |
| 26 | Remove ground box (624-7013) | EACH | 20 | $320.00 | $500.00 | $95.63 | $520.00 | $277.00 | $398.00 | $660.73 |
| 27 | Remove electrical services (628-7002) | EACH | 3 | $450.00 | $500.00 | $323.22 | $480.00 | $290.00 | $1,130.00 | $746.42 |
| 28 | Elc SRV type A 120/240 100(NS)SS(E)SP(O) (628-7025) | EACH | 4 | $7,000.00 | $8,500.00 | $8,050.58 | $9,000.00 | $7,865.00 | $6,464.00 | $11,989 |
| 29 | Spot tree trimming / brush removal (752-7002) | LF | 30 | $25.00 | $100.00 | $34.24 | $10.00 | $155.00 | $190.00 | $255.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 2, 2025. Compiled by Mirage Metrics.