TxDOT contract A00207981 bid tabulation
ASPHALT PAVEMENT REPAIR, FM3083 (FM 3083 to FM 1484). Let by Texas DOT on April 15, 2025, Montgomery, Houston District. 4 bids received; low bid $160,976 by Elite Kings Construction, LLC, -18% against the engineer's estimate of $195,593.
- Owner
- Texas DOT
- Letting
- 15 APR 2025
- Pay items
- 19
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elite Kings Construction, LLC | $160,976 | Low | -18% |
| 2 | Forde Construction Company, Inc. | $249,844 | +55% | +28% |
| 3 | Cornerstone Paving and Construction, L.L.C. | $269,747 | +68% | +38% |
| 4 | MC2 Civil, LLC | $398,882 | +148% | +104% |
Engineer's estimate: $195,593.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elite Kings Construction, LLC | 2. Forde Construction Company, Inc. | 3. Cornerstone Paving and Construction, L.L.C. | 4. MC2 Civil, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 730 | $29.15 | $6.00 | $65.00 | $50.00 | $60.00 |
| 2 | Asphalt TRT base (GR 2)(PG 76) (292-7008) | TON | 237 | $115.00 | $200.00 | $270.00 | $215.00 | $440.00 |
| 3 | D-GR HMA type D PG76-22 (341-7056) | TON | 157 | $332.50 | $200.00 | $261.00 | $436.00 | $450.00 |
| 4 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 76 | $136.67 | $200.00 | $334.00 | $282.00 | $450.00 |
| 5 | Planing asphalt concrete pavement(2") (354-7051) | SY | 1,424 | $4.73 | $6.00 | $18.00 | $35.00 | $27.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $20,998 | $22,000 | $20,000 | $20,000 | $39,000 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 1 | $22,500 | $5,000.00 | $5,000.00 | $5,000.00 | $39,000 |
| 8 | Portable changeable message sign (503-7001) | DAY | 56 | $200.00 | $200.00 | $150.00 | $65.00 | $150.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 21 | $300.00 | $250.00 | $190.00 | $125.00 | $500.00 |
| 10 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 246 | $5.08 | $7.50 | $2.10 | $2.55 | $2.50 |
| 11 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 922 | $7.60 | $6.25 | $4.30 | $6.25 | $5.00 |
| 12 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 215 | $22.84 | $7.50 | $8.50 | $10.00 | $10.00 |
| 13 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 48 | $6.32 | $0.98 | $3.20 | $3.50 | $3.75 |
| 14 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 345 | $2.70 | $0.85 | $2.30 | $2.35 | $2.75 |
| 15 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 48 | $2.66 | $0.85 | $3.20 | $2.35 | $3.75 |
| 16 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 280 | $2.64 | $0.85 | $2.30 | $2.95 | $2.75 |
| 17 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 2 | $513.46 | $285.50 | $330.00 | $325.00 | $400.00 |
| 18 | Reflectorized pavement marker type I-C (672-7002) | EACH | 12 | $14.36 | $8.00 | $11.00 | $7.00 | $12.50 |
| 19 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 16 | $16.72 | $6.00 | $11.00 | $7.00 | $12.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.