TxDOT contract A00212223 bid tabulation
PAVEMENT MARKINGS, SH0317 (Various locations to Across the Waco District). Let by Texas DOT on May 2, 2025, McLennan, Waco District. 6 bids received; low bid $1,416,896 by The Confidence Group, Inc, -35% against the engineer's estimate of $2,181,075.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 67
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Confidence Group, Inc | $1,416,896 | Low | -35% |
| 2 | Traffic Highway Maintenance, LLC | $1,788,966 | +26% | -18% |
| 3 | Striping Technology, L.P. | $1,881,480 | +33% | -14% |
| 4 | TRP Infrastructure Services, LLC | $1,917,052 | +35% | -12% |
| 5 | D. I. J. Construction, Inc. | $2,106,966 | +49% | -3.0% |
| 6 | Pavement Markings Inc. | $2,148,969 | +52% | -1.0% |
Engineer's estimate: $2,181,075.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Confidence Group, Inc | 2. Traffic Highway Maintenance, LLC | 3. Striping Technology, L.P. | 4. TRP Infrastructure Services, LLC | 5. D. I. J. Construction, Inc. | 6. Pavement Markings Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 16 | $1,500.00 | $900.00 | $4,400.00 | $5,500.00 | $1,500.00 | $3,100.00 | $990.00 |
| 2 | TMA (mobile operation) (505-7003) | DAY | 100 | $700.00 | $90.00 | $1,275.00 | $50.00 | $1,138.50 | $715.00 | $280.00 |
| 3 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 10,300 | $0.80 | $1.55 | $0.90 | $1.00 | $0.20 | $0.90 | $1.20 |
| 4 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 15,000 | $0.70 | $0.88 | $0.93 | $1.00 | $0.20 | $0.92 | $1.20 |
| 5 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 4,900 | $1.80 | $0.97 | $1.65 | $1.00 | $1.45 | $1.40 | $2.80 |
| 6 | Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021) | LF | 2,500 | $1.65 | $1.17 | $1.65 | $1.00 | $1.15 | $1.50 | $2.80 |
| 7 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 40,170 | $1.00 | $0.08 | $0.82 | $0.84 | $0.89 | $1.15 | $0.95 |
| 8 | Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027) | LF | 600 | $3.00 | $2.15 | $3.00 | $4.20 | $1.50 | $3.00 | $6.40 |
| 9 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,600 | $2.50 | $0.99 | $3.50 | $4.00 | $3.85 | $6.00 | $6.40 |
| 10 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 5,150 | $8.00 | $1.77 | $8.00 | $5.60 | $6.45 | $12.00 | $10.80 |
| 11 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 3,800 | $1.50 | $0.80 | $2.00 | $1.00 | $2.40 | $1.25 | $1.20 |
| 12 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 600 | $5.50 | $1.11 | $5.00 | $4.50 | $3.85 | $5.00 | $6.80 |
| 13 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 1,100 | $8.00 | $2.08 | $8.00 | $5.60 | $7.05 | $10.00 | $10.80 |
| 14 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 15,940 | $0.80 | $0.80 | $0.85 | $0.75 | $0.58 | $1.25 | $1.20 |
| 15 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 51,500 | $0.70 | $0.80 | $0.65 | $0.75 | $0.52 | $0.68 | $0.65 |
| 16 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 33,476 | $0.70 | $0.80 | $0.70 | $0.75 | $0.57 | $0.68 | $0.85 |
| 17 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 13,350 | $1.30 | $1.15 | $0.90 | $1.00 | $0.86 | $1.14 | $1.80 |
| 18 | Reflectorized pavement marking type III (W)(8")(DOT) (666-7241) | LF | 1,500 | $1.70 | $1.75 | $1.45 | $1.00 | $1.05 | $2.71 | $6.40 |
| 19 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 4,100 | $3.00 | $2.00 | $3.00 | $7.00 | $3.40 | $2.96 | $5.40 |
| 20 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 38,625 | $0.70 | $0.85 | $0.65 | $0.75 | $0.52 | $0.68 | $0.85 |
| 21 | Reflectorized pavement marking type III (Y)(6")(broken) (666-7249) | LF | 19,312 | $0.70 | $1.60 | $0.70 | $0.75 | $0.57 | $0.68 | $0.85 |
| 22 | Reflectorized pavement marking type III (Y)(8")(solid) (666-7251) | LF | 6,250 | $1.10 | $1.65 | $0.90 | $1.00 | $2.10 | $1.14 | $0.90 |
| 23 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 15,450 | $1.20 | $1.00 | $0.70 | $1.30 | $0.80 | $1.35 | $1.40 |
| 24 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 5,200 | $1.05 | $1.00 | $0.70 | $1.50 | $0.80 | $1.45 | $1.60 |
| 25 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 5,150 | $1.25 | $0.82 | $0.85 | $1.50 | $0.85 | $1.45 | $1.80 |
| 26 | Pavement sler 6" (666-7347) | LF | 800 | $1.00 | $0.48 | $0.55 | $1.00 | $1.00 | $2.30 | $1.20 |
| 27 | Pavement sler 8" (666-7348) | LF | 5,150 | $0.80 | $0.50 | $0.45 | $1.00 | $0.20 | $0.75 | $0.95 |
| 28 | Pavement sler 12" (666-7350) | LF | 300 | $1.50 | $0.54 | $1.10 | $1.00 | $0.77 | $2.50 | $2.00 |
| 29 | Pavement sler 24" (666-7352) | LF | 5,150 | $1.70 | $0.60 | $1.65 | $2.00 | $1.35 | $1.50 | $2.80 |
| 30 | Reflectorized pavement marking type I (W)4"(solid)(060MIL) (666-7403) | LF | 2,600 | $0.65 | $0.67 | $0.75 | $0.65 | $0.28 | $2.00 | $0.85 |
| 31 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 63,745 | $0.65 | $0.50 | $0.51 | $0.65 | $0.60 | $0.60 | $0.85 |
| 32 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,004,230 | $0.65 | $0.30 | $0.45 | $0.52 | $0.54 | $0.59 | $0.60 |
| 33 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 105,723 | $0.65 | $0.67 | $0.51 | $0.58 | $0.60 | $0.60 | $0.85 |
| 34 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,012,238 | $0.65 | $0.39 | $0.45 | $0.52 | $0.54 | $0.59 | $0.64 |
| 35 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 600 | $1.35 | $0.73 | $2.70 | $4.00 | $4.50 | $3.00 | $6.80 |
| 36 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 600 | $20.00 | $20.89 | $12.00 | $12.30 | $11.00 | $25.00 | $42.00 |
| 37 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 10,560 | $3.80 | $6.75 | $4.10 | $6.25 | $5.00 | $6.25 | $3.80 |
| 38 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 240 | $225.00 | $123.55 | $215.00 | $211.25 | $240.00 | $240.00 | $190.00 |
| 39 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 30 | $350.00 | $305.47 | $345.00 | $268.50 | $395.00 | $380.00 | $440.00 |
| 40 | Prefabricated PM type C (W)(TPL arrow) (668-7095) | EACH | 10 | $400.00 | $428.55 | $425.00 | $315.25 | $490.00 | $425.00 | $460.00 |
| 41 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 20 | $375.00 | $253.75 | $385.00 | $265.50 | $500.00 | $500.00 | $380.00 |
| 42 | Prefabricated PM type C (W)(U-LT arrow) (668-7098) | EACH | 10 | $475.00 | $380.00 | $440.00 | $375.50 | $183.00 | $500.00 | $380.00 |
| 43 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 10 | $510.00 | $548.67 | $500.00 | $280.50 | $595.00 | $730.00 | $490.00 |
| 44 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 10 | $200.00 | $267.05 | $185.00 | $125.50 | $300.00 | $385.00 | $320.00 |
| 45 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 10 | $332.02 | $358.67 | $300.00 | $235.50 | $335.00 | $500.00 | $480.00 |
| 46 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 15 | $700.00 | $343.05 | $675.00 | $555.55 | $991.00 | $800.00 | $680.00 |
| 47 | Prefabricated PM type C (W)(symbol) (668-7109) | EACH | 10 | $280.00 | $237.50 | $320.00 | $222.50 | $200.00 | $300.00 | $380.00 |
| 48 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 110 | $45.00 | $238.55 | $51.00 | $23.50 | $55.00 | $25.00 | $32.00 |
| 49 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 260 | $60.00 | $277.55 | $71.00 | $28.50 | $65.00 | $40.00 | $44.00 |
| 50 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 5 | $2,400.00 | $2,500.00 | $2,800.00 | $3,200.00 | $2,850.00 | $1,250.00 | $2,200.00 |
| 51 | Reflectorized pavement marker type I-C (672-7002) | EACH | 520 | $6.50 | $2.11 | $5.15 | $6.50 | $3.50 | $6.00 | $6.80 |
| 52 | Reflectorized pavement marker type I-R (672-7003) | EACH | 520 | $11.00 | $2.11 | $16.00 | $6.50 | $9.45 | $7.00 | $7.80 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,040 | $6.50 | $2.11 | $5.15 | $6.50 | $3.50 | $6.00 | $6.80 |
| 54 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 520 | $6.50 | $2.11 | $5.15 | $6.50 | $3.50 | $6.00 | $7.80 |
| 55 | Eliminating existing PM & markers (4") (677-7001) | LF | 2,600 | $2.00 | $1.00 | $1.00 | $0.50 | $0.48 | $1.55 | $1.80 |
| 56 | Eliminating existing PM & markers (6") (677-7002) | LF | 600 | $2.30 | $1.00 | $1.00 | $0.65 | $0.48 | $2.75 | $2.50 |
| 57 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,600 | $2.00 | $1.00 | $1.00 | $1.00 | $0.55 | $2.25 | $2.60 |
| 58 | Eliminating existing PM & markers (12") (677-7006) | LF | 600 | $3.00 | $1.00 | $3.00 | $2.00 | $2.15 | $2.75 | $3.00 |
| 59 | Eliminating existing PM & markers (24") (677-7008) | LF | 8,800 | $3.25 | $1.00 | $4.00 | $3.00 | $3.25 | $2.50 | $2.40 |
| 60 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 110 | $75.00 | $1.00 | $55.00 | $55.00 | $41.00 | $55.00 | $60.00 |
| 61 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 10 | $100.00 | $1.00 | $100.00 | $75.00 | $57.00 | $80.00 | $160.00 |
| 62 | Eliminating existing PM & markers (number) (677-7014) | EACH | 10 | $75.00 | $1.00 | $75.00 | $120.00 | $41.00 | $100.00 | $160.00 |
| 63 | Eliminating existing PM & markers (word) (677-7015) | EACH | 120 | $60.00 | $1.00 | $55.00 | $85.00 | $48.00 | $100.00 | $60.00 |
| 64 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 10 | $200.00 | $1.00 | $200.00 | $300.00 | $180.00 | $300.00 | $200.00 |
| 65 | Eliminating existing PM & markers (symbol) (677-7020) | EACH | 10 | $150.00 | $1.00 | $150.00 | $500.00 | $57.00 | $200.00 | $100.00 |
| 66 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 520 | $18.00 | $1.00 | $20.00 | $15.00 | $30.00 | $25.00 | $5.00 |
| 67 | Maintenance speed limit signing (7010-7002) | DAY | 100 | $500.00 | $350.55 | $55.00 | $250.00 | $325.00 | $10.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.