TxDOT contract A00212942 bid tabulation
Preventive Maintenance, IH 10 (FM 659 (ZARAGOZA RD) to FM 1281 (HORIZON BLVD)). Let by Texas DOT on March 4, 2025, El Paso, El Paso District. 9 bids received; low bid $276,338 by Ross Sa Enterprise LLC, -35% against the engineer's estimate of $425,202.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 17
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ross Sa Enterprise LLC | $276,338 | Low | -35% |
| 2 | Apache Barricade & Sign | $345,620 | +25% | -19% |
| 3 | Dan Williams Company | $375,631 | +36% | -12% |
| 4 | B & MS Construction, Inc. | $387,575 | +40% | -9.0% |
| 5 | International Eagle Enterprises, Inc. | $396,164 | +43% | -7.0% |
| 6 | Synergy Project Contractors, Inc. | $398,924 | +44% | -6.0% |
| 7 | Icos Management, LLC | $402,294 | +46% | -5.0% |
| 8 | HJC Farms, Inc. | $451,324 | +63% | +6.0% |
| 9 | Horizone Construction I, LTD | $477,444 | +73% | +12% |
Engineer's estimate: $425,202.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ross Sa Enterprise LLC | 2. Apache Barricade & Sign | 3. Dan Williams Company | 4. B & MS Construction, Inc. | 5. International Eagle Enterprises, Inc. | 6. Synergy Project Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 199 | $8.00 | $25.00 | $25.00 | $7.50 | $85.00 | $30.00 | $23.60 |
| 2 | Riprap (mow strip)(4 in) (432-7013) | CY | 137 | $803.00 | $500.00 | $695.00 | $650.00 | $620.00 | $500.00 | $472.00 |
| 3 | Mobilization (500-7001) | LS | 1 | $50,730 | $25,000 | $1,000.00 | $37,000 | $35,000 | $35,000 | $47,200 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $7,852.00 | $3,500.00 | $8,000.00 | $15,000 | $3,000.00 | $15,000 | $4,720.00 |
| 5 | TMA (stationary) (505-7001) | DAY | 51 | $387.00 | $400.00 | $325.00 | $200.00 | $290.00 | $150.00 | $383.50 |
| 6 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 273 | $9.00 | $15.00 | $13.95 | $6.00 | $5.00 | $12.00 | $5.90 |
| 7 | Biodegradable erosion control logs (remove) (506-7046) | LF | 273 | $3.00 | $1.00 | $9.00 | $2.05 | $3.00 | $1.00 | $2.36 |
| 8 | Metal W-beam guard fence (steel post) (540-7002) | LF | 2,100 | $43.00 | $30.00 | $38.00 | $34.50 | $45.00 | $38.00 | $53.10 |
| 9 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $3,195.00 | $2,000.00 | $3,045.00 | $3,000.00 | $1,800.00 | $4,900.00 | $3,567.14 |
| 10 | Downstream anchor terminal section (540-7015) | EACH | 8 | $1,883.00 | $1,500.00 | $1,400.00 | $1,400.00 | $2,750.00 | $2,500.00 | $1,740.50 |
| 11 | Remove metal beam guard fence (542-7001) | LF | 3,325 | $9.00 | $1.00 | $9.00 | $8.00 | $7.00 | $5.00 | $11.80 |
| 12 | Remove terminal anchor section (542-7002) | EACH | 1 | $389.00 | $1,000.00 | $150.00 | $350.00 | $1,400.00 | $1,200.00 | $236.00 |
| 13 | Remove downstream anchor terminal (542-7003) | EACH | 7 | $408.00 | $300.00 | $150.00 | $350.00 | $1,400.00 | $1,000.00 | $354.00 |
| 14 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 6 | $422.00 | $250.00 | $270.00 | $350.00 | $1,750.00 | $1,000.00 | $354.00 |
| 15 | Guardrail end treatment (install) (544-7001) | EACH | 12 | $3,829.00 | $3,500.00 | $3,800.00 | $4,000.00 | $2,800.00 | $4,600.00 | $4,248.00 |
| 16 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $407.00 | $200.00 | $150.00 | $350.00 | $1,400.00 | $1,000.00 | $236.00 |
| 17 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 109 | $48.00 | $30.00 | $75.00 | $49.00 | $19.00 | $30.00 | $15.34 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.