TxDOT contract A00213582 bid tabulation
TREE TRIMMING AND BRUSH REMOVAL, FM0932 (VARIOUS LOCATIONS to ACROSS BOSQUE, CORYELL AND HAMILTON CO.). Let by Texas DOT on April 21, 2025, Coryell, Waco District. 6 bids received; low bid $223,244 by Rear Contractors LLC, -22% against the engineer's estimate of $286,450.
- Owner
- Texas DOT
- Letting
- 21 APR 2025
- Pay items
- 12
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rear Contractors LLC | $223,244 | Low | -22% |
| 2 | Marlane Construction, LLC | $227,404 | +2.0% | -21% |
| 3 | Rhino Equity, LLC | $252,204 | +13% | -12% |
| 4 | Shalom Services Corporation | $282,250 | +26% | -1.0% |
| 5 | ArborTrue LLC | $325,034 | +46% | +13% |
| 6 | S Fowler Services LLC | $401,549 | +80% | +40% |
Engineer's estimate: $286,450.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Rear Contractors LLC | 2. Marlane Construction, LLC | 3. Rhino Equity, LLC | 4. Shalom Services Corporation | 5. ArborTrue LLC | 6. S Fowler Services LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 6 | $1,000.00 | $1.00 | $1.00 | $1.00 | $2,300.00 | $3,000.00 | $0.10 |
| 2 | Mobilization (emergency) (500-7033) | EACH | 3 | $2,500.00 | $1.00 | $1.00 | $1.00 | $1,150.00 | $4,500.00 | $1.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 45 | $250.00 | $1.00 | $1.00 | $1.00 | $115.00 | $250.00 | $1.00 |
| 4 | Driftwood removal (735-7060) | CY | 100 | $100.00 | $50.00 | $100.00 | $60.00 | $207.40 | $60.00 | $100.00 |
| 5 | Tree trimming / brush removal (752-7001) | MI | 72.50 | $2,000.00 | $2,500.00 | $1,700.00 | $2,100.00 | $920.00 | $1,800.00 | $1,800.00 |
| 6 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 6 | $3,400.00 | $1,000.00 | $1,500.00 | $2,000.00 | $1,552.50 | $2,400.00 | $2,500.00 |
| 7 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 214 | $150.00 | $50.00 | $100.00 | $150.00 | $230.00 | $40.00 | $400.00 |
| 8 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 56 | $175.00 | $100.00 | $150.00 | $150.00 | $575.00 | $100.00 | $400.00 |
| 9 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 68 | $200.00 | $200.00 | $250.00 | $150.00 | $460.00 | $342.00 | $500.00 |
| 10 | Tree removal (24" - 30" diameter) (752-7008) | EACH | 66 | $250.00 | $10.00 | $350.00 | $300.00 | $345.00 | $872.00 | $1,000.00 |
| 11 | Tree removal (30" - 36" diameter) (752-7009) | EACH | 28 | $350.00 | $10.00 | $400.00 | $300.00 | $575.00 | $872.00 | $1,000.00 |
| 12 | Tree removal (36" - 42" diameter) (752-7010) | EACH | 10 | $450.00 | $10.00 | $400.00 | $300.00 | $1,150.00 | $1,200.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 21, 2025. Compiled by Mirage Metrics.