TxDOT contract A00214377 bid tabulation
Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.10 MI N of I-20 N FR (Pavement Joint) to 0.12 MI S of I-20 S FR (Median Crossover). Let by Texas DOT on June 2, 2026, Smith, Tyler District. 5 bids received; low bid $2,362,671 by Icos Management, LLC, +20% against the engineer's estimate of $1,960,952.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 93
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Icos Management, LLC | $2,362,671 | Low | +20% |
| 2 | Texas Materials Group, Inc. | $2,421,064 | +2.0% | +23% |
| 3 | Longview Bridge and Road, LTD. | $2,552,845 | +8.0% | +30% |
| 4 | Big Creek Construction, LTD. | $2,698,880 | +14% | +38% |
| 5 | East Texas Bridge, Inc. | $2,703,596 | +14% | +38% |
Engineer's estimate: $1,960,952.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Icos Management, LLC | 2. Texas Materials Group, Inc. | 3. Longview Bridge and Road, LTD. | 4. Big Creek Construction, LTD. | 5. East Texas Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (medians) (104-7008) | SY | 71 | $30.00 | $93.50 | $65.00 | $120.00 | $90.00 | $35.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 863 | $25.00 | $57.75 | $20.00 | $10.00 | $35.00 | $30.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 75 | $20.00 | $15.75 | $30.00 | $10.00 | $22.00 | $20.00 |
| 4 | Subgr widen (DC) (112-7002) | STA | 4.20 | $4,000.00 | $550.00 | $2,100.55 | $3,600.00 | $4,500.00 | $2,800.00 |
| 5 | Backfill (type A) (134-7001) | STA | 17 | $300.00 | $330.00 | $589.29 | $165.00 | $1,300.00 | $1,000.00 |
| 6 | Blading (150-7001) | STA | 5 | $500.00 | $330.00 | $826.76 | $190.00 | $625.00 | $150.00 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 1,500 | $3.50 | $2.20 | $5.95 | $6.00 | $2.50 | $5.00 |
| 8 | Block sodding (162-7002) | SY | 2,014 | $8.00 | $6.16 | $5.60 | $7.40 | $5.50 | $6.50 |
| 9 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 750 | $2.00 | $0.33 | $1.12 | $1.50 | $0.35 | $1.25 |
| 10 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 1,500 | $2.00 | $0.88 | $1.46 | $1.90 | $1.00 | $1.65 |
| 11 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 750 | $1.00 | $0.88 | $1.44 | $1.90 | $1.00 | $1.65 |
| 12 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 750 | $1.00 | $0.88 | $1.45 | $1.90 | $1.00 | $1.65 |
| 13 | Vegetative watering (168-7001) | TGL | 42 | $100.00 | $0.88 | $132.54 | $40.00 | $85.00 | $60.00 |
| 14 | SP mixes SP-B PG64-22 (344-7001) | TON | 613 | $175.00 | $185.14 | $197.94 | $200.00 | $165.00 | $215.00 |
| 15 | Tack coat (344-7077) | GAL | 319 | $6.00 | $7.35 | $6.25 | $4.40 | $7.00 | $8.00 |
| 16 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 4,169 | $150.00 | $213.70 | $222.07 | $215.00 | $218.00 | $265.00 |
| 17 | Planing asphalt concrete pavement(3") (354-7052) | SY | 23,552 | $3.75 | $3.96 | $3.98 | $6.00 | $4.25 | $5.00 |
| 18 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 12 | $300.00 | $385.00 | $335.00 | $440.00 | $800.00 | $375.00 |
| 19 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 28 | $320.00 | $495.00 | $360.00 | $470.00 | $825.00 | $400.00 |
| 20 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 22 | $1,200.00 | $825.00 | $910.00 | $1,200.00 | $1,000.00 | $1,000.00 |
| 21 | RC pipe (CL III)(18 in) (464-7003) | LF | 50 | $90.00 | $71.50 | $225.00 | $70.00 | $92.00 | $100.00 |
| 22 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | $1,500.00 | $1,050.00 | $1,800.00 | $1,150.00 | $2,600.00 | $1,250.00 |
| 23 | Mobilization (500-7001) | LS | 1 | $170,000 | $155,999 | $217,327 | $225,000 | $260,000 | $233,000 |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $5,000.00 | $39,600 | $13,182 | $2,500.00 | $2,200.00 | $18,000 |
| 25 | Portable changeable message sign (503-7001) | DAY | 7 | $600.00 | $110.00 | $812.04 | $130.00 | $250.00 | $400.00 |
| 26 | TMA (stationary) (505-7001) | DAY | 68 | $200.00 | $495.00 | $266.18 | $330.00 | $200.00 | $300.00 |
| 27 | TMA (mobile operation) (505-7003) | DAY | 6 | $200.00 | $495.00 | $75.00 | $450.00 | $1,150.00 | $300.00 |
| 28 | Concrete curb (type II) (529-7002) | LF | 58 | $30.00 | $128.95 | $40.00 | $42.50 | $36.00 | $40.00 |
| 29 | Driveways (concrete) (hes) (530-7007) | SY | 667 | $100.00 | $116.35 | $160.00 | $170.00 | $285.00 | $150.00 |
| 30 | Curb ramps (type 1) (531-7005) | EACH | 6 | $1,750.00 | $1,509.10 | $4,000.00 | $4,100.00 | $3,600.00 | $3,000.00 |
| 31 | Curb ramps (type 10) (531-7011) | EACH | 2 | $2,000.00 | $1,922.90 | $3,000.00 | $4,800.00 | $4,500.00 | $3,000.00 |
| 32 | Curb ramps (type 20) (531-7012) | EACH | 1 | $4,250.00 | $2,697.29 | $5,000.00 | $6,800.00 | $4,800.00 | $3,000.00 |
| 33 | Curb ramps (type 21) (531-7013) | EACH | 1 | $3,000.00 | $2,129.40 | $4,000.00 | $6,100.00 | $2,400.00 | $3,000.00 |
| 34 | Curb ramps (type 22) (531-7014) | EACH | 4 | $3,000.00 | $3,415.04 | $6,000.00 | $7,100.00 | $5,400.00 | $3,000.00 |
| 35 | Concrete median (536-7002) | SY | 292 | $100.00 | $91.40 | $165.00 | $130.00 | $180.00 | $175.00 |
| 36 | Concrete directional island (536-7004) | SY | 222 | $170.00 | $106.44 | $190.00 | $200.00 | $420.00 | $175.00 |
| 37 | Concrete median (nose) (536-7005) | SY | 4 | $500.00 | $2,096.26 | $500.00 | $200.00 | $550.00 | $500.00 |
| 38 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 1,263 | $17.50 | $13.20 | $8.50 | $11.20 | $20.00 | $9.50 |
| 39 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 188 | $25.00 | $27.50 | $22.50 | $29.00 | $37.00 | $25.00 |
| 40 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,055 | $15.00 | $16.50 | $12.75 | $16.50 | $22.00 | $14.00 |
| 41 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,210 | $20.00 | $30.80 | $24.50 | $32.00 | $43.00 | $27.00 |
| 42 | Electrical conductor (no.8) bare (620-7007) | LF | 3,178 | $2.50 | $2.75 | $3.00 | $4.00 | $2.50 | $3.35 |
| 43 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,160 | $2.50 | $2.75 | $3.25 | $4.00 | $3.00 | $3.65 |
| 44 | Ground box type D (162922)W/apron (624-7008) | EACH | 17 | $2,500.00 | $1,650.00 | $1,300.00 | $1,700.00 | $2,000.00 | $1,500.00 |
| 45 | Remove electrical services (628-7002) | EACH | 1 | $1,000.00 | $550.00 | $1,300.00 | $1,700.00 | $450.00 | $1,500.00 |
| 46 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 1 | $8,500.00 | $7,590.00 | $8,025.00 | $10,600 | $10,500 | $9,000.00 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 11 | $720.00 | $715.00 | $651.34 | $860.00 | $700.00 | $725.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 17 | $820.00 | $825.00 | $809.00 | $1,000.00 | $850.00 | $900.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 3 | $750.00 | $715.00 | $736.00 | $970.00 | $1,100.00 | $810.00 |
| 50 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 2 | $800.00 | $825.00 | $856.00 | $1,100.00 | $800.00 | $950.00 |
| 51 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 2 | $300.00 | $165.00 | $438.00 | $580.00 | $350.00 | $500.00 |
| 52 | Remove SM RD SN sup&AM (644-7073) | EACH | 32 | $110.00 | $99.00 | $101.00 | $130.00 | $110.00 | $125.00 |
| 53 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 2 | $285.00 | $5.50 | $438.00 | $130.00 | $105.00 | $100.00 |
| 54 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 1,146 | $2.50 | $1.10 | $0.56 | $2.65 | $2.00 | $3.00 |
| 55 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 260 | $3.50 | $1.10 | $0.56 | $2.65 | $2.00 | $3.00 |
| 56 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 160 | $2.00 | $2.75 | $2.50 | $3.30 | $1.10 | $2.75 |
| 57 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 440 | $2.00 | $2.75 | $2.50 | $3.30 | $2.25 | $2.75 |
| 58 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,830 | $1.50 | $1.32 | $1.20 | $1.60 | $1.25 | $1.35 |
| 59 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 610 | $8.00 | $7.15 | $6.50 | $8.60 | $8.00 | $7.50 |
| 60 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 800 | $0.85 | $1.10 | $1.00 | $1.30 | $2.25 | $1.10 |
| 61 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,520 | $0.75 | $1.10 | $1.00 | $1.30 | $1.75 | $1.10 |
| 62 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 70 | $0.85 | $1.10 | $1.00 | $1.30 | $2.25 | $1.10 |
| 63 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,640 | $0.75 | $1.10 | $1.00 | $1.30 | $1.75 | $1.10 |
| 64 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 21 | $250.00 | $242.00 | $220.00 | $290.00 | $25.00 | $250.00 |
| 65 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 17 | $285.00 | $291.50 | $265.00 | $350.00 | $300.00 | $300.00 |
| 66 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 26 | $75.00 | $49.50 | $45.00 | $60.00 | $110.00 | $50.00 |
| 67 | Reflectorized pavement marker type I-C (672-7002) | EACH | 17 | $6.00 | $6.60 | $6.00 | $8.00 | $8.00 | $6.75 |
| 68 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 8 | $6.00 | $6.60 | $6.00 | $8.00 | $8.00 | $6.75 |
| 69 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 245 | $6.00 | $6.60 | $6.00 | $8.00 | $8.00 | $6.75 |
| 70 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $35,000 | $38,885 | $31,520 | $40,000 | $30,000 | $35,000 |
| 71 | Removing traffic signals (680-7004) | EACH | 2 | $7,500.00 | $2.20 | $6,850.00 | $9,000.00 | $5,750.00 | $7,600.00 |
| 72 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 14 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 73 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 74 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 14 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 75 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 3 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 76 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 14 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 77 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 3 | $300.00 | $423.50 | $350.50 | $460.00 | $450.00 | $400.00 |
| 78 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 13 | $750.00 | $764.50 | $765.00 | $1,000.00 | $900.00 | $850.00 |
| 79 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 17 | $215.00 | $275.00 | $335.00 | $440.00 | $230.00 | $375.00 |
| 80 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 5,064 | $2.00 | $3.85 | $2.50 | $3.30 | $2.75 | $2.75 |
| 81 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 8,647 | $1.50 | $4.40 | $3.00 | $4.00 | $4.05 | $3.30 |
| 82 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $25,000 | $14,933 | $15,500 | $20,000 | $25,000 | $17,000 |
| 83 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $39,000 | $31,020 | $39,450 | $50,000 | $50,000 | $43,500 |
| 84 | Ins traffic signal PL AM(S)2 arm(32-28')lum (686-7103) | EACH | 1 | $20,000 | $15,565 | $16,520 | $20,000 | $25,000 | $18,500 |
| 85 | Ins traffic signal PL AM(S)2 arm(36-36')lum (686-7127) | EACH | 1 | $20,000 | $16,830 | $18,025 | $23,000 | $30,000 | $20,000 |
| 86 | Pedestrian pole assembly (687-7001) | EACH | 10 | $6,000.00 | $2,024.00 | $3,315.50 | $4,300.00 | $5,750.00 | $3,650.00 |
| 87 | Pedestrian detect push button (APS) (688-7001) | EACH | 13 | $1,000.00 | $1,567.50 | $925.25 | $1,200.00 | $1,350.00 | $1,050.00 |
| 88 | Membrane underseal (3005-7001) | GAL | 4,711 | $5.50 | $7.70 | $8.75 | $5.50 | $6.00 | $6.50 |
| 89 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,500.00 | $10,010 | $10,500 | $13,500 | $10,000 | $11,600 |
| 90 | VDS prosr sys (6017-7001) | EACH | 2 | $12,000 | $11,825 | $20,500 | $25,000 | $9,250.00 | $23,000 |
| 91 | HVDS W/var LNS (6017-7008) | EACH | 6 | $8,000.00 | $6,809.00 | $6,358.00 | $8,000.00 | $8,000.00 | $7,000.00 |
| 92 | VDS CNTRL software (6017-7009) | EACH | 2 | $400.00 | $550.00 | $450.00 | $600.00 | $770.00 | $500.00 |
| 93 | VDS cabling (6017-7012) | LF | 3,500 | $3.25 | $4.00 | $3.00 | $3.90 | $5.70 | $3.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.