TxDOT contract A00215434 bid tabulation
PAVEMENT MARKINGS, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT). Let by Texas DOT on December 3, 2025, Travis, Austin District. 2 bids received; low bid $2,475,270 by D. I. J. Construction, Inc., -29% against the engineer's estimate of $3,476,287.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 116
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | D. I. J. Construction, Inc. | $2,475,270 | Low | -29% |
| 2 | TRP Infrastructure Services, LLC | $2,747,037 | +11% | -21% |
Engineer's estimate: $3,476,287.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. D. I. J. Construction, Inc. | 2. TRP Infrastructure Services, LLC |
|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 60 | $4,000.00 | $3,800.00 | $10,000 |
| 2 | Portable changeable message sign (503-7001) | DAY | 150 | $150.00 | $100.00 | $50.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 60 | $200.00 | $2,000.00 | $250.00 |
| 4 | TMA (mobile operation) (505-7002) | HR | 800 | $75.00 | $350.00 | $25.00 |
| 5 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 500 | $6.50 | $1.00 | $3.50 |
| 6 | Biodegradable erosion control logs (remove) (506-7046) | LF | 500 | $2.50 | $1.00 | $2.00 |
| 7 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 3,000 | $2.50 | $0.50 | $3.00 |
| 8 | Reflectorized pavement marking type I (W)4"(lane drop)(100MIL) (666-7006) | LF | 100 | $1.49 | $0.50 | $3.00 |
| 9 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 10,000 | $2.37 | $1.00 | $1.50 |
| 10 | Reflectorized pavement marking type I (W)6"(lane drop)(100MIL) (666-7012) | LF | 5,000 | $0.52 | $1.00 | $2.00 |
| 11 | Reflectorized pavement marking type I (W)8"(broken)(100MIL) (666-7015) | LF | 100 | $3.33 | $1.00 | $2.00 |
| 12 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 10,000 | $1.06 | $1.00 | $2.00 |
| 13 | Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021) | LF | 5,000 | $1.96 | $1.00 | $2.50 |
| 14 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 250,000 | $1.75 | $0.45 | $0.80 |
| 15 | Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027) | LF | 5,000 | $2.48 | $1.30 | $3.00 |
| 16 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 50,000 | $7.53 | $3.00 | $3.00 |
| 17 | Reflectorized pavement marking type I (W)18"(solid)(100MIL) (666-7033) | LF | 100 | $6.01 | $9.00 | $6.00 |
| 18 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 50,000 | $15.27 | $9.00 | $6.50 |
| 19 | Reflectorized pavement marking type I (W)36"(solid)(100MIL) (666-7039) | LF | 100 | $11.33 | $9.60 | $12.00 |
| 20 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 1,000 | $218.88 | $145.00 | $150.00 |
| 21 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 10 | $258.10 | $200.00 | $200.00 |
| 22 | Reflectorized pavement marking type I(W)(TPL arrw)(100MIL) (666-7048) | EACH | 10 | $252.79 | $250.00 | $250.00 |
| 23 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 10 | $283.67 | $300.00 | $200.00 |
| 24 | Reflectorized pavement marking type I(W)(U-LT arrow)(100 mil) (666-7054) | EACH | 10 | $330.25 | $300.00 | $225.00 |
| 25 | Reflectorized pavement marking type I(W)(U-ST arrow)(100MIL) (666-7057) | EACH | 10 | $400.00 | $300.00 | $225.00 |
| 26 | Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060) | EACH | 4 | $442.56 | $1,000.00 | $250.00 |
| 27 | Reflectorized pavement marking type I (W)(number)(100MIL) (666-7063) | EACH | 4 | $426.57 | $700.00 | $300.00 |
| 28 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1,000 | $242.93 | $200.00 | $150.00 |
| 29 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 10 | $900.00 | $500.00 | $800.00 |
| 30 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 10 | $1,500.00 | $750.00 | $800.00 |
| 31 | Reflectorized pavement marking type I (W) (island) (100MIL) (666-7075) | SF | 100 | $5.67 | $1.00 | $5.00 |
| 32 | Ref pavement marking type I (W)(med nose)(100MIL) (666-7078) | EACH | 10 | $528.17 | $5.00 | $300.00 |
| 33 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 10 | $681.44 | $800.00 | $550.00 |
| 34 | Reflectorized pavement marking type I (W)(symbol)(100MIL) (666-7084) | EACH | 10 | $542.21 | $250.00 | $500.00 |
| 35 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 1,000 | $46.28 | $15.00 | $50.00 |
| 36 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 1,500 | $56.00 | $25.00 | $50.00 |
| 37 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 5 | $146.92 | $150.00 | $150.00 |
| 38 | RFL pavement marking type I(W)bike RR crossing(100MIL) (666-7096) | EACH | 6 | $953.33 | $300.00 | $450.00 |
| 39 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 5 | $173.09 | $300.00 | $150.00 |
| 40 | Reflectorized pavement marking type I(W)(bike word)(100MIL) (666-7102) | EACH | 5 | $286.67 | $300.00 | $150.00 |
| 41 | Reflectorized pavement marking type I (W)(bike DOT)(100MIL) (666-7105) | EACH | 5 | $3.81 | $25.00 | $2.50 |
| 42 | Reflectorized pavement marking type I (Y)4"(DOT)(100MIL) (666-7108) | LF | 100 | $2.62 | $1.00 | $2.50 |
| 43 | Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111) | LF | 100 | $2.94 | $2.00 | $2.50 |
| 44 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 100 | $1.77 | $2.00 | $1.25 |
| 45 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 20,000 | $4.23 | $1.50 | $3.00 |
| 46 | Reflectorized pavement marking type I (Y)18"(solid)(100MIL) (666-7120) | LF | 100 | $4.77 | $1.00 | $8.00 |
| 47 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 1,000 | $8.39 | $7.00 | $8.00 |
| 48 | Reflectorized pavement marking type I (Y)36"(solid)(100MIL) (666-7126) | LF | 100 | $9.67 | $5.00 | $12.00 |
| 49 | Reflectorized pavement marking type I (Y)(island)(100MIL) (666-7129) | SF | 100 | $9.31 | $3.00 | $5.00 |
| 50 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 5 | $228.33 | $200.00 | $300.00 |
| 51 | RE PV marking type I(black)4"(shadow)(100MIL) (666-7135) | LF | 100 | $4.10 | $4.00 | $15.00 |
| 52 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 100 | $1.30 | $6.00 | $15.00 |
| 53 | Reflectorized pavement marking type II (W) 4" (broken) (666-7168) | LF | 20,000 | $0.22 | $0.10 | $0.35 |
| 54 | Reflectorized pavement marking type II (W) 4" (DOT) (666-7169) | LF | 2,500 | $1.00 | $0.20 | $2.00 |
| 55 | Reflectorized pavement marking type II (W) 4" (lane drop) (666-7170) | LF | 100 | $1.00 | $0.20 | $2.00 |
| 56 | Reflectorized pavement marking type II (W) 4" (solid) (666-7171) | LF | 1,000 | $0.17 | $0.75 | $0.25 |
| 57 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 100 | $0.21 | $0.50 | $0.40 |
| 58 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 2,500 | $0.87 | $1.00 | $2.00 |
| 59 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 30,000 | $0.18 | $0.25 | $0.30 |
| 60 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 2,500 | $0.38 | $1.00 | $2.00 |
| 61 | Reflectorized pavement marking type II (W) 8" (lane drop) (666-7178) | LF | 100 | $2.00 | $1.00 | $2.00 |
| 62 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 10,000 | $0.41 | $0.75 | $0.50 |
| 63 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 5,000 | $1.00 | $2.00 | $2.50 |
| 64 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 3,000 | $1.27 | $4.00 | $4.00 |
| 65 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 50 | $106.52 | $75.00 | $100.00 |
| 66 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 50 | $111.49 | $100.00 | $100.00 |
| 67 | Reflectorized pavement marking type II (Y) 4" (broken) (666-7208) | LF | 1,000 | $1.00 | $0.75 | $0.35 |
| 68 | Reflectorized pavement marking type II (Y) 4" (solid) (666-7210) | LF | 1,000 | $1.00 | $0.75 | $0.25 |
| 69 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 5,000 | $0.80 | $0.35 | $0.40 |
| 70 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 50,000 | $0.40 | $0.25 | $0.30 |
| 71 | Reflectorized profile pavement marking type I(W)4"(solid)(100MIL) (666-7264) | LF | 150,000 | $0.78 | $0.40 | $0.70 |
| 72 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 10,000 | $1.17 | $1.00 | $1.00 |
| 73 | Reflectorized profile pavement marking type I(Y)4"(solid)(100MIL) (666-7268) | LF | 82,377 | $0.78 | $0.40 | $0.70 |
| 74 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 2,000 | $1.17 | $1.00 | $1.00 |
| 75 | Reflectorized profile pavement marking type I(Y)4"(broken)(090MIL) (666-7271) | LF | 5,260 | $0.78 | $0.40 | $0.85 |
| 76 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 100 | $1.17 | $1.00 | $1.25 |
| 77 | Reflectorized pavement marking type I (W)4"(broken)(060MIL) (666-7400) | LF | 5,000 | $1.50 | $0.30 | $0.55 |
| 78 | Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402) | LF | 7,000 | $2.20 | $0.35 | $0.55 |
| 79 | Reflectorized pavement marking type I (W)4"(solid)(060MIL) (666-7403) | LF | 5,000 | $1.20 | $0.30 | $0.50 |
| 80 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 7,000 | $1.80 | $0.35 | $0.50 |
| 81 | Reflectorized pavement marking type I (W)6"(broken)(060MIL) (666-7406) | LF | 10,000 | $0.50 | $0.35 | $0.75 |
| 82 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 120,000 | $0.60 | $0.40 | $0.75 |
| 83 | Reflectorized pavement marking type I (W)6"(solid)(060MIL) (666-7409) | LF | 10,000 | $0.40 | $0.35 | $0.65 |
| 84 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 120,000 | $0.60 | $0.40 | $0.65 |
| 85 | Reflectorized pavement marking type I (Y)4"(broken)(060MIL) (666-7412) | LF | 3,000 | $1.00 | $0.30 | $0.55 |
| 86 | Reflectorized pavement marking type I (Y)4"(broken)(100MIL) (666-7414) | LF | 3,000 | $1.20 | $0.35 | $0.55 |
| 87 | Reflectorized pavement marking type I (Y)4"(solid)(060MIL) (666-7415) | LF | 5,000 | $0.80 | $0.30 | $0.50 |
| 88 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 5,000 | $0.60 | $0.35 | $0.50 |
| 89 | Reflectorized pavement marking type I (Y)6"(broken)(060MIL) (666-7418) | LF | 5,000 | $0.50 | $0.35 | $0.75 |
| 90 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 70,000 | $0.55 | $0.40 | $0.75 |
| 91 | Reflectorized pavement marking type I (Y)6"(solid)(060MIL) (666-7421) | LF | 5,000 | $0.40 | $0.35 | $0.65 |
| 92 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 120,000 | $0.58 | $0.40 | $0.65 |
| 93 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 80 | $10.00 | $20.00 | $10.00 |
| 94 | Prefabricated PM type B (multi)(shield) (668-7071) | EACH | 6 | $2,500.00 | $2,000.00 | $2,500.00 |
| 95 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 6 | $3,000.00 | $1,800.00 | $2,500.00 |
| 96 | Reflectorized pavement marker type I-C (672-7002) | EACH | 750 | $4.50 | $6.00 | $5.00 |
| 97 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 10,500 | $3.40 | $6.00 | $5.00 |
| 98 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,000 | $4.50 | $10.00 | $5.00 |
| 99 | Eliminating existing PM & markers (4") (677-7001) | LF | 15,000 | $1.00 | $1.00 | $0.75 |
| 100 | Eliminating existing PM & markers (6") (677-7002) | LF | 10,000 | $1.00 | $1.00 | $0.75 |
| 101 | Eliminating existing PM & markers (8") (677-7004) | LF | 7,500 | $1.30 | $1.00 | $1.00 |
| 102 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,500 | $2.50 | $5.00 | $2.50 |
| 103 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,800 | $4.50 | $5.00 | $4.00 |
| 104 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 20 | $93.00 | $100.00 | $50.00 |
| 105 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 20 | $100.00 | $100.00 | $50.00 |
| 106 | Eliminating existing PM & markers (word) (677-7015) | EACH | 20 | $93.00 | $100.00 | $50.00 |
| 107 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 40 | $20.00 | $11.50 | $50.00 |
| 108 | Pavement surface preparation for marking (6") (678-7002) | LF | 15,000 | $0.10 | $1.00 | $0.75 |
| 109 | Pavement surface preparation for marking (8") (678-7004) | LF | 5,000 | $0.10 | $1.00 | $0.75 |
| 110 | Pavement surface preparation for marking (12") (678-7006) | LF | 5,000 | $0.17 | $1.00 | $0.75 |
| 111 | Pavement surface preparation for marking (24") (678-7008) | LF | 4,000 | $0.16 | $1.00 | $1.50 |
| 112 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 400 | $6.51 | $25.00 | $20.00 |
| 113 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 200 | $12.82 | $25.00 | $20.00 |
| 114 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 200 | $4.92 | $1.00 | $20.00 |
| 115 | Pavement surface preparation for marking (word) (678-7016) | EACH | 400 | $6.83 | $25.00 | $20.00 |
| 116 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 5 | $42.00 | $500.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.