TxDOT contract A00217428 bid tabulation
INSTALLATION OF FLASHING BEACONS AND PED, SH0495 (Zapata, Hidalgo, Willacy to Various Roadways in Pharr District). Let by Texas DOT on April 8, 2026, Hidalgo, Pharr District. 3 bids received; low bid $1,249,484 by Austin Traffic Signal Construction Co., Inc., -8.1% against the engineer's estimate of $1,359,546.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 30
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Traffic Signal Construction Co., Inc. | $1,249,484 | Low | -8.0% |
| 2 | The Levy Company, Inc. | $1,606,181 | +29% | +18% |
| 3 | Select Maintenance, L.L.C. | $2,075,703 | +66% | +53% |
Engineer's estimate: $1,359,546.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Traffic Signal Construction Co., Inc. | 2. The Levy Company, Inc. | 3. Select Maintenance, L.L.C. |
|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $11,500 | $65,000 | $160,618 | $200,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $4,000.00 | $3,500.00 | $2,300.00 | $16,200 |
| 3 | Portable changeable message sign (503-7002) | EACH | 2 | $13,000 | $2,100.00 | $10,230 | $12,000 |
| 4 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 250 | $4.00 | $6.70 | $5.00 | $8.00 |
| 5 | Biodegradable erosion control logs (remove) (506-7046) | LF | 250 | $1.00 | $1.80 | $1.85 | $1.00 |
| 6 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,590 | $7.00 | $10.00 | $30.00 | $20.00 |
| 7 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 600 | $27.00 | $28.00 | $24.00 | $27.00 |
| 8 | Electrical conductor (no.8) bare (620-7007) | LF | 2,120 | $1.75 | $1.30 | $1.45 | $2.00 |
| 9 | Electrical conductor (no.6) bare (620-7009) | LF | 2,120 | $1.55 | $1.50 | $1.90 | $2.70 |
| 10 | Electrical conductor (no.6) insulated (620-7010) | LF | 4,240 | $1.75 | $1.60 | $2.20 | $3.00 |
| 11 | Ground box type A (122311)W/apron (624-7002) | EACH | 70 | $1,000.00 | $870.00 | $1,200.00 | $2,500.00 |
| 12 | Remove ground box (624-7013) | EACH | 70 | $145.00 | $225.00 | $100.00 | $100.00 |
| 13 | Remove electrical services (628-7002) | EACH | 70 | $450.00 | $210.00 | $250.00 | $100.00 |
| 14 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 20 | $4,500.00 | $3,200.00 | $5,100.00 | $6,700.00 |
| 15 | Elc SRV type T 120/240 000(NS)GS(N)TP(O) (628-7328) | EACH | 55 | $5,500.00 | $2,250.00 | $3,600.00 | $5,220.00 |
| 16 | Aluminum signs (type A) (636-7001) | SF | 573 | $31.50 | $30.00 | $30.00 | $21.00 |
| 17 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 1 | $850.00 | $985.00 | $1,200.00 | $2,500.00 |
| 18 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $925.00 | $1,100.00 | $1,400.00 | $2,500.00 |
| 19 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 212 | $330.00 | $375.00 | $400.00 | $225.00 |
| 20 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $110.00 | $310.00 | $170.00 | $200.00 |
| 21 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 212 | $115.00 | $30.00 | $76.00 | $65.00 |
| 22 | Pavement sler 24" (666-7352) | LF | 3,180 | $3.15 | $3.00 | $3.55 | $0.10 |
| 23 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 3,180 | $11.00 | $16.00 | $20.00 | $20.00 |
| 24 | Eliminating existing PM & markers (24") (677-7008) | LF | 3,180 | $2.60 | $3.10 | $4.30 | $4.00 |
| 25 | Pavement surface preparation for marking (24") (678-7008) | LF | 3,180 | $7.00 | $1.20 | $1.25 | $0.10 |
| 26 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 170 | $300.00 | $240.00 | $375.00 | $350.00 |
| 27 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 5,000 | $2.30 | $1.60 | $2.90 | $2.50 |
| 28 | Install RDSD flash beacon assembly (685-7001) | EACH | 70 | $3,650.00 | $6,850.00 | $5,000.00 | $8,700.00 |
| 29 | Remove RDSD flash beacon assembly (685-7003) | EACH | 70 | $480.00 | $650.00 | $560.00 | $300.00 |
| 30 | School ZN clock (7099-7001) | EACH | 53 | $3,500.00 | $1,100.00 | $4,300.00 | $2,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.