TxDOT contract A00218176 bid tabulation
PAVEMENT MARKINGS, US0181 (Various In San Patricio, Aransas, Bee & to Karnes, Refugio & Goliad Counties). Let by Texas DOT on November 13, 2025, San Patricio, Corpus Christi District. 4 bids received; low bid $687,912 by Pavement Markings Inc., -24% against the engineer's estimate of $907,685.
- Owner
- Texas DOT
- Letting
- 13 NOV 2025
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Pavement Markings Inc. | $687,912 | Low | -24% |
| 2 | Highway Barricades and Services, LLC | $707,229 | +3.0% | -22% |
| 3 | The Confidence Group, Inc | $762,132 | +11% | -16% |
| 4 | TRP Infrastructure Services, LLC | $818,369 | +19% | -10% |
Engineer's estimate: $907,685.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Pavement Markings Inc. | 2. Highway Barricades and Services, LLC | 3. The Confidence Group, Inc | 4. TRP Infrastructure Services, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 24 | $2,445.75 | $50.00 | $500.00 | $2,000.00 | $500.00 |
| 2 | Reflectorized pavement marking type I (W)6"(DOT)(060MIL) (666-7007) | LF | 1,000 | $2.20 | $0.45 | $1.10 | $0.50 | $1.50 |
| 3 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 1,016 | $2.80 | $2.10 | $1.25 | $0.50 | $1.50 |
| 4 | Reflectorized pavement marking type I (W)6"(lane drop)(060MIL) (666-7010) | LF | 500 | $2.20 | $0.45 | $1.10 | $0.70 | $1.00 |
| 5 | Reflectorized pavement marking type I (W)6"(lane drop)(090MIL) (666-7011) | LF | 500 | $2.80 | $2.10 | $1.25 | $1.10 | $1.00 |
| 6 | Reflectorized pavement marking type I (W)8"(DOT)(060MIL) (666-7016) | LF | 580 | $3.40 | $1.20 | $1.35 | $0.65 | $1.50 |
| 7 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 2,400 | $3.60 | $2.20 | $1.50 | $0.90 | $1.50 |
| 8 | Reflectorized pavement marking type I (W)8"(lane drop)(060MIL) (666-7019) | LF | 500 | $3.20 | $1.20 | $1.35 | $1.00 | $1.50 |
| 9 | Reflectorized pavement marking type I (W)8"(solid)(060MIL) (666-7022) | LF | 6,040 | $0.75 | $0.50 | $1.35 | $0.71 | $0.60 |
| 10 | Reflectorized pavement marking type I (W)12"(lane drop)(060MIL) (666-7025) | LF | 500 | $3.40 | $2.80 | $2.00 | $2.50 | $1.50 |
| 11 | Reflectorized pavement marking type I (W)12"(solid)(060MIL) (666-7028) | LF | 530 | $3.40 | $1.80 | $6.00 | $2.50 | $3.25 |
| 12 | Reflectorized pavement marking type I (W)24"(solid)(060MIL) (666-7034) | LF | 440 | $13.40 | $3.00 | $9.00 | $2.55 | $7.00 |
| 13 | Reflectorized pavement marking type I(W)(lane drop arrow)(060MIL) (666-7058) | EACH | 1 | $420.00 | $280.00 | $500.00 | $300.00 | $300.00 |
| 14 | Reflectorized pavement marking type I(W)(lane drop arrow)(090MIL) (666-7059) | EACH | 2 | $480.00 | $300.00 | $650.00 | $325.00 | $300.00 |
| 15 | Reflectorized pavement marking type I (W)(bike arrow)(060MIL) (666-7091) | EACH | 1 | $140.00 | $280.00 | $500.00 | $140.00 | $250.00 |
| 16 | Reflectorized pavement marking type I(W)(bike syml)(060MIL) (666-7097) | EACH | 1 | $140.00 | $280.00 | $500.00 | $140.00 | $250.00 |
| 17 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 4,035 | $0.36 | $0.34 | $0.20 | $0.23 | $0.35 |
| 18 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 273,495 | $0.28 | $0.15 | $0.20 | $0.24 | $0.24 |
| 19 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 27,730 | $0.28 | $0.36 | $0.20 | $0.24 | $0.35 |
| 20 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 103,990 | $0.28 | $0.21 | $0.20 | $0.24 | $0.25 |
| 21 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 46,535 | $1.40 | $0.70 | $0.72 | $0.50 | $0.85 |
| 22 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 42,682 | $1.40 | $0.70 | $0.72 | $0.50 | $0.85 |
| 23 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 1,375 | $1.60 | $1.90 | $1.50 | $0.05 | $2.00 |
| 24 | Pavement sler 6" (666-7347) | LF | 1,000 | $1.00 | $0.65 | $2.00 | $0.25 | $1.00 |
| 25 | Reflectorized pavement marking type I (W)6"(broken)(060MIL) (666-7406) | LF | 36,588 | $1.10 | $0.31 | $0.40 | $0.43 | $0.60 |
| 26 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 25,935 | $1.20 | $0.62 | $0.40 | $0.48 | $0.55 |
| 27 | Reflectorized pavement marking type I (W)6"(solid)(060MIL) (666-7409) | LF | 12,545 | $0.30 | $0.38 | $0.40 | $0.43 | $0.45 |
| 28 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 403,802.50 | $0.38 | $0.44 | $0.47 | $0.42 | $0.55 |
| 29 | Reflectorized pavement marking type I (Y)6"(broken)(060MIL) (666-7418) | LF | 6,975 | $0.36 | $0.42 | $0.40 | $0.42 | $0.50 |
| 30 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 48,935 | $0.42 | $0.55 | $0.40 | $0.42 | $0.55 |
| 31 | Reflectorized pavement marking type I (Y)6"(solid)(060MIL) (666-7421) | LF | 65,650 | $0.34 | $0.31 | $0.40 | $0.40 | $0.45 |
| 32 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 262,782 | $0.36 | $0.48 | $0.47 | $0.49 | $0.55 |
| 33 | Prefabricated PM type B (W)(4")(broken)contrast (668-7007) | LF | 47 | $7.40 | $9.80 | $25.00 | $19.00 | $25.00 |
| 34 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 862 | $14.80 | $10.80 | $12.00 | $19.00 | $8.75 |
| 35 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 96 | $340.00 | $160.00 | $115.00 | $266.00 | $165.00 |
| 36 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $480.00 | $480.00 | $500.00 | $380.00 | $195.00 |
| 37 | Prefabricated PM type C (W)(TPL arrow) (668-7095) | EACH | 1 | $640.00 | $620.00 | $600.00 | $418.00 | $500.00 |
| 38 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 1 | $580.00 | $480.00 | $400.00 | $570.00 | $500.00 |
| 39 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 75 | $380.00 | $210.00 | $200.00 | $250.00 | $225.00 |
| 40 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 2 | $680.00 | $720.00 | $600.00 | $760.00 | $750.00 |
| 41 | Prefabricated PM type C (W)(symbol) (668-7109) | EACH | 15 | $420.00 | $220.00 | $185.00 | $266.00 | $100.00 |
| 42 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 30 | $28.00 | $24.00 | $12.00 | $57.00 | $40.00 |
| 43 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 250 | $48.00 | $34.00 | $18.00 | $57.00 | $50.00 |
| 44 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 1,944 | $14.80 | $9.80 | $9.00 | $17.00 | $8.75 |
| 45 | Prefabricated PM type C (blue&white)(evac sym) (668-7136) | EACH | 1 | $420.00 | $320.00 | $800.00 | $760.00 | $1,500.00 |
| 46 | Reflectorized pavement marker type I-C (672-7002) | EACH | 942 | $5.80 | $5.90 | $5.00 | $4.00 | $4.50 |
| 47 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 6,700 | $4.80 | $3.80 | $3.75 | $4.00 | $4.00 |
| 48 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,390 | $3.60 | $4.80 | $4.25 | $5.00 | $4.00 |
| 49 | Traffic button type W (672-7007) | EACH | 16 | $6.40 | $6.90 | $2.75 | $5.00 | $3.00 |
| 50 | Traffic button type Y (672-7008) | EACH | 504 | $6.40 | $6.90 | $2.75 | $5.00 | $3.00 |
| 51 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,000 | $0.60 | $1.60 | $0.75 | $0.25 | $1.00 |
| 52 | Eliminating existing PM & markers (6") (677-7002) | LF | 1,000 | $1.00 | $1.70 | $1.25 | $0.25 | $1.00 |
| 53 | Eliminating existing PM & markers (8") (677-7004) | LF | 100 | $1.50 | $3.00 | $1.50 | $0.25 | $5.00 |
| 54 | Eliminating existing PM & markers (12") (677-7006) | LF | 100 | $3.00 | $4.00 | $5.00 | $1.00 | $5.00 |
| 55 | Eliminating existing PM & markers (24") (677-7008) | LF | 490 | $6.00 | $5.00 | $10.00 | $2.00 | $5.00 |
| 56 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 32 | $80.00 | $60.00 | $60.00 | $50.00 | $50.00 |
| 57 | Eliminating existing PM & markers (word) (677-7015) | EACH | 24 | $80.00 | $60.00 | $60.00 | $50.00 | $75.00 |
| 58 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 1 | $400.00 | $300.00 | $275.00 | $150.00 | $500.00 |
| 59 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 100 | $8.00 | $2.00 | $5.00 | $5.00 | $30.00 |
| 60 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,000 | $0.60 | $0.40 | $0.04 | $0.27 | $1.00 |
| 61 | Preformed in-lane (trans) rumble strip (6024-7001) | LF | 280 | $54.00 | $32.00 | $20.00 | $22.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.