TxDOT contract A00218193 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, US0180 (Location from US 180 to to Brazos River Bridge). Let by Texas DOT on December 17, 2025, Palo Pinto, Fort Worth District. 4 bids received; low bid $788,005 by Structural Integrity Group LLC, -6.7% against the engineer's estimate of $844,309.
- Owner
- Texas DOT
- Letting
- 17 DEC 2025
- Pay items
- 34
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Structural Integrity Group LLC | $788,005 | Low | -7.0% |
| 2 | Blacksmith Ventures LLC | $811,384 | +3.0% | -4.0% |
| 3 | SCR Civil Construction, LLC | $871,820 | +11% | +3.0% |
| 4 | Built Right Construction of Oklahoma, LLC | $1,526,228 | +94% | +81% |
Engineer's estimate: $844,309.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Structural Integrity Group LLC | 2. Blacksmith Ventures LLC | 3. SCR Civil Construction, LLC | 4. Built Right Construction of Oklahoma, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Asphalt (CHFRS-2P) (316-7008) | GAL | 2,559 | $8.00 | $6.00 | $8.25 | $11.00 | $14.00 |
| 2 | Aggregate (type-B, GR-3)(sac-B) (316-7171) | CY | 89 | $275.00 | $350.00 | $515.00 | $600.00 | $750.00 |
| 3 | Tom-F PG76-22 sac-A (347-7006) | TON | 134 | $350.00 | $300.00 | $560.00 | $650.00 | $800.00 |
| 4 | Tack coat (347-7011) | GAL | 930 | $8.00 | $6.00 | $1.50 | $3.00 | $2.00 |
| 5 | Plane & text asphalt concrete pavement(0" to 3") (354-7003) | SY | 4,652 | $2.00 | $13.50 | $9.00 | $17.00 | $84.00 |
| 6 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 100 | $700.00 | $225.00 | $300.00 | $400.00 | $400.00 |
| 7 | Concrete structure repair (standard) (429-7009) | SF | 28 | $225.00 | $500.00 | $500.00 | $310.00 | $350.00 |
| 8 | Elastomeric bearing (laminated) (434-7002) | EACH | 4 | $8,000.00 | $16,000 | $5,000.00 | $2,500.00 | $17,500 |
| 9 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 31 | $60.00 | $45.00 | $45.00 | $115.00 | $65.00 |
| 10 | Cleaning existing joints (438-7008) | LF | 62 | $50.00 | $20.00 | $45.00 | $113.00 | $65.00 |
| 11 | Resizing and sealing joints (438-7009) | LF | 62 | $77.00 | $135.00 | $60.00 | $200.00 | $75.00 |
| 12 | Clean & paint existing STR (system II) (446-7002) | LS | 1 | $107,500 | $168,750 | $155,000 | $188,000 | $325,000 |
| 13 | Raising existing struct (495-7001) | LS | 1 | $250,000 | $132,000 | $150,000 | $82,000 | $125,000 |
| 14 | Mobilization (500-7001) | LS | 1 | $76,755 | $89,000 | $47,500 | $87,000 | $150,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $22,000 | $10,000 | $6,000.00 | $21,000 | $4,000.00 |
| 16 | Portable changeable message sign (503-7001) | DAY | 100 | $90.00 | $1.00 | $500.00 | $100.00 | $65.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 27 | $375.00 | $625.00 | $400.00 | $500.00 | $300.00 |
| 18 | TMA (mobile operation) (505-7003) | DAY | 3 | $300.00 | $625.00 | $5,000.00 | $1,500.00 | $300.00 |
| 19 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 50 | $5.00 | $1.00 | $10.00 | $11.50 | $8.00 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 50 | $2.00 | $1.00 | $1.00 | $4.60 | $3.00 |
| 21 | One-way traffic control (port traffic signal) (510-7003) | MO | 2 | $10,000 | $3,000.00 | $5,000.00 | $7,000.00 | $10,000 |
| 22 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 3,023 | $1.00 | $0.86 | $1.00 | $1.00 | $1.00 |
| 23 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 199 | $5.00 | $9.20 | $10.00 | $11.00 | $11.00 |
| 24 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 61 | $1.00 | $0.86 | $1.00 | $1.00 | $1.00 |
| 25 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 2,411 | $1.00 | $0.85 | $1.00 | $1.00 | $1.00 |
| 26 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 508 | $2.00 | $3.00 | $15.00 | $6.00 | $1.20 |
| 27 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 199 | $12.00 | $10.00 | $3.00 | $11.50 | $12.00 |
| 28 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 3,023 | $2.00 | $2.50 | $3.00 | $2.90 | $3.00 |
| 29 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 2,411 | $2.00 | $2.50 | $3.00 | $2.90 | $3.00 |
| 30 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 61 | $2.00 | $2.50 | $25.00 | $2.90 | $3.00 |
| 31 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 34 | $5.00 | $15.00 | $25.00 | $17.20 | $18.00 |
| 32 | Rep steel bridge member (diaphragm) (784-7003) | EACH | 1 | $10,000 | $18,000 | $15,000 | $11,700 | $7,500.00 |
| 33 | Rep steel bridge member (bearings) (784-7008) | EACH | 4 | $10,000 | $8,200.00 | $10,000 | $12,715 | $25,000 |
| 34 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 7 | $4,000.00 | $1,660.00 | $2,000.00 | $820.00 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.