TxDOT letting results, May 17, 2022
10 contracts let by Texas DOT on May 17, 2022, $2,165,199 in low bids, a median of 3 bidders per contract. On the 10 with an engineer's estimate, the low bid came in under it 1 times; median low bid +10% against the estimate.
- Owner
- Texas DOT
- Contracts
- 10
- Low bids, total
- $2,165,199
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 05221601 | US0181 Hot mix from VARIOUS | Corpus Christi District | 1 | Hac Materials, LTD. | $364,100 | +29% | TxDOT | ||
| 05221602 | US0059 Hot-mix cold-laid from VARIOUS | Corpus Christi District | 2 | Colorado Materials, LTD. | $338,870 | $347,000 | +2.0% | +17% | TxDOT |
| 05221604 | US0181 Hydraulic cement from VARIOUS | Corpus Christi District | 3 | GM Quality Construction LLC | $294,594 | $302,830 | +3.0% | +2.0% | TxDOT |
| 05221167 | US0059 Hot mix from POLK COUNTY MAINTENANCE YARD to POLK COUNTY MAINTENANCE YARD | Lufkin District | 1 | East Texas Asphalt Co., LTD. | $270,375 | -1.0% | TxDOT | ||
| 05221603 | US0181 Hydraulic cement from VARIOUS | Corpus Christi District | 3 | Touchstone Resources, LLC | $264,220 | $267,580 | +1.0% | +2.0% | TxDOT |
| 05221703 | IH0045 Rock/riprap from VARIOUS to VARIOUS | Bryan District | 3 | Touchstone Resources, LLC | $247,900 | $266,085 | +7.0% | +3.0% | TxDOT |
| 05221702 | IH0045 Flexible base from VARIOUS to VARIOUS | Bryan District | 4 | Touchstone Resources, LLC | $132,000 | $136,000 | +3.0% | +18% | TxDOT |
| 05221704 | IH0045 Hydraulic cement from VARIOUS to VARIOUS | Bryan District | 2 | Aka-Materials | $111,780 | $115,597 | +3.0% | +11% | TxDOT |
| 05221701 | SH0006 Flexible base from VARIOUS to VARIOUS | Bryan District | 3 | Touchstone Resources, LLC | $96,000 | $108,000 | +12% | +14% | TxDOT |
| 05221162 | FM0343 Cutback from NACOGDOCHES COUNTY MAINTENANCE YARD to NACOGDOCHES COUNTY MAINTENANCE YARD | Lufkin District | 3 | Martin Resource Management Corporation | $45,360 | $52,800 | +16% | +9.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.