TxDOT letting results, May 18, 2022

6 contracts let by Texas DOT on May 18, 2022, $1,211,007 in low bids, a median of 2 bidders per contract. On the 6 with an engineer's estimate, the low bid came in under it 2 times; median low bid +4.0% against the estimate.

Owner
Texas DOT
Contracts
6
Low bids, total
$1,211,007
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
05222205US0277 Limestone rock asphalt from VARIOUS to VARIOUSLaredo District2Vulcan Construction Materials, LLC$271,119$308,469+14%-8.0%TxDOT
05221510US0090 Emulsion from VARIOUS LOCATIONS IN HONDO, TILDEN, to PLEASANTON, AND PEARSALL MAINT SECTSan Antonio District2Wright Asphalt Products Company LLC$227,920$251,020+10%-4.0%TxDOT
05222201IH0035 Mowing highway right of way from VARIOUS to VARIOUSLaredo District1R&M Incorporated$221,192+19%TxDOT
05222203IH0035 Limestone rock asphalt from VARIOUS to VARIOUSLaredo District2Vulcan Construction Materials, LLC$211,776$229,920+9.0%+10%TxDOT
05222204US0277 Emulsion from VARIOUS to VARIOUSLaredo District1Ergon Asphalt & Emulsions, Inc.$191,000+3.0%TxDOT
05222202IH0035 Riprap repair from VARIOUS to VARIOUSLaredo District2GM Quality Construction LLC$88,000$107,500+22%+4.0%TxDOT
TxDOT contracts let on May 18, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy