TxDOT letting results, November 21, 2024
12 contracts let by Texas DOT on November 21, 2024, $4,818,335 in low bids, a median of 2 bidders per contract. On the 12 with an engineer's estimate, the low bid came in under it 6 times; median low bid -3.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 12
- Low bids, total
- $4,818,335
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00212315 | LITTER REMOVAL, IH0035 (Various to Various) | Laredo District | 1 | World Technical Services, Inc. | $883,490 | 0.0% | TxDOT | ||
| A00212391 | LIMESTONE ROCK ASPHALT, US0277 (VARIOUS to VARIOUS) | Laredo District | 2 | Vulcan Construction Materials, LLC | $856,000 | $932,800 | +9.0% | 0.0% | TxDOT |
| A00212687 | EMULSION, US0069 (Various Locations within to Wood and Van Zandt) | Tyler District | 1 | Ergon Asphalt & Emulsions, Inc. | $507,175 | +3.0% | TxDOT | ||
| A00212751 | EMULSION, SH0155 (Various locations in to Smith and Cherokee Counties) | Tyler District | 1 | Ergon Asphalt & Emulsions, Inc. | $452,820 | -5.0% | TxDOT | ||
| A00212173 | BRIDGE REPAIR, IH0030 (Various locations in to Hopkins County) | Paris District | 5 | Garret Shields Infrastructure | $427,200 | $434,530 | +2.0% | +15% | TxDOT |
| A00212435 | EMULSION, US0277 (VARIOUS to VARIOUS) | Laredo District | 1 | Ergon Asphalt & Emulsions, Inc. | $378,400 | 0.0% | TxDOT | ||
| A00209936 | BRIDGE PREVENTATIVE MAINTENANCE, SH0037 (Various locations in to Red River, Lamar and Hunt Co.) | Paris District | 6 | Beck-Reit & Sons, LTD. | $327,282 | $377,264 | +15% | -24% | TxDOT |
| A00212876 | LIMESTONE ROCK ASPHALT, US0080 (Various locations within to Van Zandt County) | Tyler District | 2 | Martin Marietta Materials, Inc. | $318,600 | $326,300 | +2.0% | +10% | TxDOT |
| A00212301 | TREE REMOVAL, US0082 (Various locations in to Red River County) | Paris District | 5 | Mercer Tree Service | $220,125 | $299,584 | +36% | -18% | TxDOT |
| A00212300 | TREE REMOVAL, US0082 (Various locations in to Lamar and Delta Co.) | Paris District | 3 | Mercer Tree Service | $200,825 | $215,909 | +8.0% | -27% | TxDOT |
| A00212460 | DITCH CLEANING AND RESHAPING, US0082 (Various locations in to Lamar, Delta, and Red River Counties) | Paris District | 4 | Rhino Equity, LLC | $162,950 | $233,500 | +43% | -24% | TxDOT |
| A00212130 | STRUCTURE MATERIALS, US0271 (Paris District to Maintenance Office) | Paris District | 2 | Southern Sourcing Solutions, LLC | $83,468 | $117,600 | +41% | -29% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.