M & J Construction Co. of Pinellas County, Inc.: VDOT bid record

M & J Construction Co. of Pinellas County, Inc. submitted 19 bids on Virginia DOT contracts in the data, from 22 NOV 2006 to 23 SEP 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +33% above the low bid.

Owner
Virginia DOT
Low bid volume
$0
Latest bid
23 SEP 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

19Bids
0Low bids
0Win rate, percent
+33%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2006200%
2007300%
2008600%
2012100%
2016100%
2018100%
2020100%
2026400%
M & J Construction Co. of Pinellas County, Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Hampton Roads500%
Bristol400%
Salem400%
Culpeper300%
Lynchburg100%
Fredericksburg100%
Staunton100%
M & J Construction Co. of Pinellas County, Inc., VDOT: bids and low bids by district

Who it meets most

FirmContracts in commonThat firm ranked ahead
Klicos Painting Company, Inc.1111 of 11
Saffo Contractors, Inc.54 of 5
Omega Coatings & Construction, LLC44 of 4
ELITE CONTRACTORS, INC (Use in Va: ELITE44 of 4
Titan Industrial Services, Inc.41 of 4
Atlas Painting and Sheeting Corp.44 of 4
Olympus Painting Contractors, Inc.32 of 3
Southern Road & Bridge, LLC31 of 3
Spartan Contracting, LLC31 of 3
Legend Painting, Inc.20 of 2
M & J Construction Co. of Pinellas County, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 SEP 2026C0000128000B57BristolBridge rehab - zone coating6 of 7$2,553,196+109%
26 AUG 2026C0000128608B74BristolBridge painting7 of 10$2,175,000+33%
22 JUL 2026C0000128653B24CulpeperBridge painting5 of 9$1,099,800+69%
24 JUN 2026C0000128652B18CulpeperBridge painting6 of 10$2,727,400+44%
26 FEB 2020C0000114300B52SalemBridge painting contract2 of 3$2,981,470+45%
20 JUN 2018C0000110923B10BristolDistrict wide bridge painting contract3 of 3$1,363,800+41%
26 OCT 2016C00108110B08BristolNhpp-br01(326)(nfo)9999-961-413, b6083 of 3$931,536+15%
21 NOV 2012C00101615N22BStauntonRecoat 38 exist. bridges on secondary system2 of 3$3,336,220+120%
27 AUG 2008C00089782B01Hampton RoadsRecoat existing structures2 of 3$1,014,850+14%
27 FEB 2008C00087214N01SalemRepaint bridges (2)2 of 3$1,002,478+6.0%
27 FEB 2008CM5080424N01Hampton RoadsRecoat existing structure3 of 3$865,980+17%
27 FEB 2008CM5080688N01Hampton RoadsRecoat existing structures (2)2 of 3$705,600+22%
27 FEB 2008CM508BPA39778Hampton RoadsClean and repaint existing structure and replace joints3 of 3$369,500+25%
23 JAN 2008CM5080423N01Hampton RoadsRecoat existing structures (2)3 of 3$801,580+6.0%
26 SEP 2007CM408P08023FredericksburgNonebp-4a-083 of 3$1,463,000+40%
25 APR 2007C00080911LynchburgBh-bro7(209)(nfo) bro7-963-185, n5013 of 3$1,894,324+49%
25 APR 2007CM8082355M01CulpeperBridge repainting, 12 str.2 of 3$2,655,065+46%
22 NOV 2006C00077199M001SalemBridge painting 7 structures2 of 3$1,763,000+9.0%
22 NOV 2006C00076896M01SalemBridge painting 8 structures3 of 3$2,017,700+9.0%
M & J Construction Co. of Pinellas County, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy