ELITE CONTRACTORS, INC (Use in Va: ELITE: VDOT bid record
ELITE CONTRACTORS, INC (Use in Va: ELITE submitted 15 bids on Virginia DOT contracts in the data, from 22 OCT 2025 to 28 OCT 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +45% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $0
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 3 | 0 | 0% |
| 2026 | 12 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 4 | 0 | 0% |
| Culpeper | 4 | 0 | 0% |
| Northern Virginia | 3 | 0 | 0% |
| Richmond | 2 | 0 | 0% |
| Fredericksburg | 2 | 0 | 0% |
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Southern Road & Bridge, LLC | 12 | 4 of 12 |
| Olympus Painting Contractors, Inc. | 10 | 6 of 10 |
| Titan Industrial Services, Inc. | 10 | 3 of 10 |
| Reglas Painting Co., Inc. | 7 | 4 of 7 |
| Omega Coatings & Construction, LLC | 7 | 4 of 7 |
| Saffo Contractors, Inc. | 7 | 2 of 7 |
| Manolis Painting, Inc. | 6 | 4 of 6 |
| Seminole Equipment, Inc. | 6 | 5 of 6 |
| Legend Painting, Inc. | 5 | 0 of 5 |
| International Rigging Group, LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000128799N01B | Fredericksburg | On-call structure recoating | 4 of 4 | $6,557,035 | +51% |
| 28 OCT 2026 | C0000128800N01B | Fredericksburg | On-call structure recoating | 4 of 6 | $6,347,077 | +48% |
| 28 OCT 2026 | C0000126719B37 | Richmond | Bridge recoating | 7 of 8 | $785,000 | +149% |
| 23 SEP 2026 | C0000128000B57 | Bristol | Bridge rehab - zone coating | 4 of 7 | $1,666,435 | +36% |
| 26 AUG 2026 | C0000128604B48 | Bristol | Bridge painting | 3 of 7 | $2,750,000 | +45% |
| 26 AUG 2026 | C0000128608B74 | Bristol | Bridge painting | 2 of 10 | $1,725,000 | +6.0% |
| 22 JUL 2026 | C0000128653B24 | Culpeper | Bridge painting | 4 of 9 | $972,000 | +49% |
| 22 JUL 2026 | C0000128651B19 | Culpeper | Bridge painting | 2 of 9 | $2,774,000 | +14% |
| 24 JUN 2026 | C0000128652B18 | Culpeper | Bridge painting | 2 of 10 | $2,119,000 | +12% |
| 25 MAR 2026 | C0000124667B70 | Northern Virginia | Bridge painting | 4 of 4 | $3,750,000 | +213% |
| 25 FEB 2026 | C0000124682B18 | Northern Virginia | Bridge recoating | 4 of 6 | $2,230,000 | +73% |
| 04 FEB 2026 | C0000126722N01 | Richmond | On-call bridge coating | 6 of 6 | $3,432,800 | +223% |
| 17 DEC 2025 | C0000124657B25 | Culpeper | Bridge painting | 3 of 8 | $644,000 | +2.0% |
| 19 NOV 2025 | C0000127522N01 | Bristol | Bridge painting | 2 of 14 | $1,217,000 | +20% |
| 22 OCT 2025 | C0000124681B04 | Northern Virginia | Bridge recoating | 4 of 5 | $6,276,400 | +172% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.