Reglas Painting Co., Inc. submitted 28 bids on Virginia DOT contracts in the data, from 24 MAR 2004 to 26 AUG 2026, and was the low bidder on 15 of them (54%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $21,290,430
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2004 | 1 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 3 | 2 | 67% |
| 2014 | 1 | 0 | 0% |
| 2015 | 3 | 3 | 100% |
| 2016 | 3 | 1 | 33% |
| 2017 | 3 | 2 | 67% |
| 2018 | 1 | 1 | 100% |
| 2020 | 3 | 2 | 67% |
| 2021 | 1 | 1 | 100% |
| 2025 | 3 | 1 | 33% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Culpeper | 8 | 6 | 75% |
| Salem | 5 | 4 | 80% |
| Bristol | 4 | 2 | 50% |
| Lynchburg | 3 | 0 | 0% |
| Northern Virginia | 2 | 0 | 0% |
| Fredericksburg | 2 | 2 | 100% |
| Hampton Roads | 2 | 1 | 50% |
| Staunton | 1 | 0 | 0% |
| Richmond | 1 | 0 | 0% |
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Saffo Contractors, Inc. | 10 | 2 of 10 |
| Manolis Painting, Inc. | 7 | 3 of 7 |
| ELITE CONTRACTORS, INC (Use in Va: ELITE | 7 | 3 of 7 |
| Klicos Painting Company, Inc. | 7 | 2 of 7 |
| Olympus Painting Contractors, Inc. | 5 | 1 of 5 |
| Southern Road & Bridge, LLC | 5 | 0 of 5 |
| Monoko, Inc. | 5 | 0 of 5 |
| Titan Industrial Services, Inc. | 5 | 0 of 5 |
| International Rigging Group, LLC | 4 | 0 of 4 |
| Spartan Contracting, LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000128604B48 | Bristol | Bridge painting | 1 of 7 | $1,900,350 | Low, 32% under the second |
| 26 AUG 2026 | C0000128608B74 | Bristol | Bridge painting | 3 of 10 | $1,978,000 | +21% |
| 22 JUL 2026 | C0000128653B24 | Culpeper | Bridge painting | 1 of 9 | $651,000 | Low, 18% under the second |
| 22 JUL 2026 | C0000128651B19 | Culpeper | Bridge painting | 3 of 9 | $2,834,781 | +16% |
| 17 DEC 2025 | C0000124657B25 | Culpeper | Bridge painting | 1 of 8 | $629,350 | Low, 2.0% under the second |
| 19 NOV 2025 | C0000127522N01 | Bristol | Bridge painting | 4 of 14 | $1,350,000 | +33% |
| 22 OCT 2025 | C0000124681B04 | Northern Virginia | Bridge recoating | 2 of 5 | $2,932,800 | +27% |
| 24 FEB 2021 | C000115005B60 | Salem | Stp-br02(448)br02-962-667, b660 | 1 of 3 | $2,975,000 | Low, 3.0% under the second |
| 24 JUN 2020 | C0000110667B51 | Richmond | Bridge painting over rte. 10 | 2 of 3 | $330,000 | +33% |
| 24 JUN 2020 | C0000115170B14 | Bristol | Bridge coatings contract | 1 of 3 | $836,100 | Low, 1.0% under the second |
| 25 MAR 2020 | C000115109N01 | Culpeper | Recoat structures (fed. str. nos. 00484, 00486 & 13021) | 1 of 3 | $360,420 | Low, 63% under the second |
| 28 FEB 2018 | C000108316B75 | Salem | Interstate bridge painting over james river and csxrr | 1 of 3 | $1,372,000 | Low, 11% under the second |
| 23 AUG 2017 | C000108317B32 | Salem | Districtwide interstate bridge painting contract | 1 of 3 | $3,249,000 | Low, 11% under the second |
| 25 JAN 2017 | C0000110145B09 | Lynchburg | Bridge painting - rte. 56 over james river | 2 of 3 | $660,000 | +2.0% |
| 25 JAN 2017 | C000107942N01 | Hampton Roads | Clean and repaint str. steel - 7 bridges | 1 of 3 | $1,335,000 | Low, 6.0% under the second |
| 22 JUN 2016 | C0000105344B46 | Salem | Districtwide paint contract (6 structures) | 2 of 3 | $1,655,000 | +24% |
| 22 JUN 2016 | C0000108381B26 | Culpeper | Paint str. 2053 | 2 of 3 | $360,000 | +3.0% |
| 25 MAY 2016 | C000107870N01B | Fredericksburg | Bridge painting district-wide | 1 of 3 | $1,039,137 | Low, 14% under the second |
| 28 OCT 2015 | C00106635N01 | Culpeper | Repaint existing bridges (staunton north) | 1 of 3 | $2,991,500 | Low, 18% under the second |
| 20 MAY 2015 | 0000106826B08 | Culpeper | Bridge painting rte 64 over rte. 250 and rte. 3 over rte. 29 | 1 of 3 | $654,000 | Low, 18% under the second |
| 20 MAY 2015 | 0000106827B06 | Culpeper | Bridge painting int. 64 over mechunk creek | 1 of 3 | $320,000 | Low, 37% under the second |
| 22 JAN 2014 | C00101752N01 | Lynchburg | District wide bridge painting | 3 of 3 | $875,000 | +10% |
| 18 DEC 2013 | C00098943B12 | Salem | Br-br02(344)(nfo)br02-962-117, b612 | 1 of 3 | $2,692,000 | Low, 3.0% under the second |
| 24 JUL 2013 | CM00104006N29 | Hampton Roads | Clean and repaint existing structures (4) | 2 of 3 | $1,555,000 | +16% |
| 27 FEB 2013 | C00092204B12 | Fredericksburg | Proposed bridge painting | 1 of 3 | $285,573 | Low, 52% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.