VDOT contract C0000126719B37 bid tabulation

Bridge recoating. Let by Virginia DOT on October 28, 2026, Prince George, Richmond. 8 bids received; low bid $315,000 by Omega Coatings & Construction, LLC.

Owner
Virginia DOT
Letting
28 OCT 2026
Pay items
5
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Omega Coatings & Construction, LLC$315,000Low
2Saffo Contractors, Inc.$438,999+39%
3Seminole Equipment, Inc.$460,000+46%
4Titan Industrial Services, Inc.$479,750+52%
5Olympus Painting Contractors, Inc.$528,875+68%
6Coatings & Painting, L.L.C.$721,000+129%
7ELITE CONTRACTORS, INC (Use in Va: ELITE$785,000+149%
8Elite Industrial Painting, Inc.$816,437+159%
VDOT contract C0000126719B37: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Omega Coatings & Construction, LLC2. Saffo Contractors, Inc.3. Seminole Equipment, Inc.4. Titan Industrial Services, Inc.5. Olympus Painting Contractors, Inc.6. Coatings & Painting, L.L.C.
0001-0010NS recoat EX. STR. type B (VA. STR. no. 1901) (411SX20-0004)LS1$255,000$139,430$250,000$200,000$325,000$482,000
0001-0020NS env. prot. & health & safety (VA STR. no. 1901) (411SX20-0005)LS1$10,000$209,144$140,000$250,000$85,000$50,000
0001-0030NS disposal of material (VA STR. no. 1901) (411SX20-0006)LS1$5,000.00$2,500.00$10,000$5,000.00$3,875.00$19,000
0001-0040Maintenance of traffic (VA. STR. no. 1901) (512SP20-0002)LS1$20,000$50,000$30,000$10,000$60,000$120,000
0001-0050Mobilization (513SD20-0001)LS1$25,000$37,925$30,000$14,750$55,000$50,000
VDOT contract C0000126719B37: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy