WL Markers, Inc.: VDOT bid record
WL Markers, Inc. submitted 13 bids on Virginia DOT contracts in the data, from 26 FEB 2014 to 26 AUG 2026, and was the low bidder on 8 of them (62%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $2,510,216
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2014 | 4 | 2 | 50% |
| 2015 | 1 | 1 | 100% |
| 2016 | 3 | 1 | 33% |
| 2017 | 1 | 1 | 100% |
| 2018 | 1 | 1 | 100% |
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 1 | 100% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 9 | 6 | 67% |
| Culpeper | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Truck mounted attenuator | 512SD20-0023 | HR | 6 | 5 (83%) | $4.00 | $20.00 |
| Snow plow. raised pave. marker asph.conc | 54217 | EACH | 6 | 5 (83%) | $26.50 | $32.00 |
| Remove exist. raised pavement marker | 54210 | EACH | 7 | 2 (29%) | $25.00 | $25.00 |
| Replace lens (snow plow. raised marker) | 54216 | EACH | 5 | 1 (20%) | $7.50 | $16.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| A & A Safety, Inc. | 9 | 3 of 9 |
| Accent Stripe, Inc. | 3 | 0 of 3 |
| Mullen'S Markings, Inc. | 2 | 0 of 2 |
| Penn Line Service, Inc. | 2 | 2 of 2 |
| Surface Preparation Technologies, Inc. | 1 | 1 of 1 |
| Safety Improvements, LLC | 1 | 1 of 1 |
| Payne'S Parking Designs, Inc. | 1 | 0 of 1 |
| Paynes Parking Designs, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000128880N01 | Bristol | On-call pavement marker replacement | 1 of 2 | $203,525 | Low, 59% under the second |
| 17 NOV 2021 | C0000118535N01 | Culpeper | On call sprpm / pim lens replacement & removal | 1 of 2 | $237,710 | Low, 62% under the second |
| 24 JUN 2020 | C0000112976N01 | Culpeper | On-call pave marker lens inspection, removal and replacement | 3 of 3 | $337,213 | +29% |
| 28 MAR 2018 | C000110086N01 | Bristol | Inspect and replace raised pavement markers | 1 of 2 | $353,007 | Low, 9.0% under the second |
| 26 APR 2017 | C000108035N01 | Bristol | Inspect and replace raised pavement markers | 1 of 3 | $356,314 | Low, 12% under the second |
| 26 OCT 2016 | C00108241N01 | Culpeper | On-call raised pavement markers lens replacement & removal | 3 of 3 | $421,555 | +41% |
| 03 FEB 2016 | C0000105834N01 | Bristol | Raised pavement markers (interstate) | 1 of 2 | $269,327 | Low, 1.0% under the second |
| 03 FEB 2016 | C0000106854N01 | Bristol | Inspect and repl. snow plow. (rpm) - primaries districtwide | 2 of 2 | $404,515 | +11% |
| 25 FEB 2015 | C00106543N01 | Bristol | Upgrade pavement markers (rpm) | 1 of 2 | $331,663 | Low, 10% under the second |
| 26 MAR 2014 | C00103794N01 | Bristol | Upgrade pavement markers (rpm); primary routes | 1 of 3 | $395,498 | Low, 5.0% under the second |
| 26 MAR 2014 | C00103797N01 | Bristol | Upgrade pavement markers (rpm); interstate routes | 2 of 3 | $218,092 | +11% |
| 26 FEB 2014 | C00104669N01 | Bristol | Install rumble strips | 3 of 3 | $186,535 | +321% |
| 26 FEB 2014 | C00105194N01 | Culpeper | Staunton - inspect, replace and install snow-plowable rpm | 1 of 3 | $363,172 | Low, 41% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.