VDOT contract C0000115130N01 bid tabulation

Smart scale - lighting improvements. Let by Virginia DOT on November 19, 2025, Warren, Staunton. 6 bids received; low bid $1,560,869 by Davis H. Elliot Construction Company, Inc..

Owner
Virginia DOT
Letting
19 NOV 2025
Pay items
28
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Davis H. Elliot Construction Company, Inc.$1,560,869Low
2Richardson-Wayland-Ferreira, LLC$1,681,833+8.0%
3Creative Design Concepts, Inc.$1,748,471+12%
4Ardent Company, LLC$1,787,700+15%
5Ces Consulting, LLC$2,507,564+61%
6B & B Signal Co., L.L.C.$3,331,919+113%
VDOT contract C0000115130N01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Davis H. Elliot Construction Company, Inc.2. Richardson-Wayland-Ferreira, LLC3. Creative Design Concepts, Inc.4. Ardent Company, LLC5. Ces Consulting, LLC6. B & B Signal Co., L.L.C.
0001-0010Temporary sign (512SD20-0014)SF580$3.28$18.67$38.00$20.00$65.00$100.00
0001-0020Pedestrian barricade device (512SD20-0018)LF100$131.57$16.42$80.00$30.00$1.00$22.00
0001-0030Truck mounted attenuator (512SD20-0023)HR2,160$48.02$27.21$60.00$10.00$125.00$108.00
0001-0040Group 2 channelizing devices (512SD20-0024)DAY8,316$1.90$0.50$1.00$0.50$1.00$9.50
0001-0050Port.changeable mess. sign (512SD20-0025)HR12,096$9.53$7.25$15.00$1.00$5.00$17.50
0001-0060Electronic arrow board (512SD20-0026)HR864$5.74$0.01$5.00$2.00$5.00$14.00
0001-0070Flagger service (512SD20-0027)HR108$84.50$33.61$50.00$40.00$50.00$120.00
0001-0080Warning light TY. A (512SD20-0028)DAY1,512$4.17$0.55$2.00$1.00$0.25$4.25
0001-0090Mobilization (513SD20-0001)LS1$107,765$125,000$83,261$866,000$95,000$195,000
0001-01002 conductor cable (700SD20-0141)LF350$10.26$5.34$8.00$3.00$4.00$6.00
0001-01108 conductor cable (700SD20-0144)LF21,250$5.59$7.88$4.00$1.00$2.50$3.00
0001-01208 conductor cable egc (700SD20-0148)LF5,300$4.64$7.88$4.00$1.00$2.25$3.15
0001-0130Conc. found. LF-1, TY. A (700SD20-0149)EACH42$4,616.11$4,581.11$3,478.00$2,000.00$10,500$15,100
0001-0140Electrical service SE-8, TY. B (700SD20-0171)EACH6$8,016.23$10,918$9,589.00$5,000.00$4,500.00$16,500
0001-0150Electrical service work pad (700SD20-0174)EACH6$1,082.47$1,296.26$3,256.00$2,000.00$2,000.00$1,600.00
0001-0160Junction box JB-S1 (700SD20-0177)EACH39$2,214.08$2,345.03$2,290.00$1,500.00$1,200.00$1,900.00
0001-0170Junction box JB-S2 (700SD20-0178)EACH6$2,510.49$3,018.39$2,645.00$1,700.00$1,750.00$2,050.00
0001-0180Elect. ser. GRD. electrode 10' (700SD20-0181)EACH12$187.74$293.50$175.00$250.00$300.00$515.00
0001-0190Bored conduit 3" (700SD20-0192)LF4,150$68.18$86.02$54.00$25.00$225.00$240.00
0001-0200Conduit PVC 3" (700SD20-0195)LF950$9.42$8.15$12.00$5.00$30.00$27.00
0001-0210Trench excavation eci-1 (700SD20-0197)LF810$11.11$20.94$28.00$15.00$100.00$30.00
0001-0220Lighting pole LP-1 35' MNTG HT (700SD20-0219)EACH42$5,469.71$4,794.43$8,098.00$7,000.00$4,925.00$7,000.00
0001-0230Luminaire arm 12' (700SD20-0222)EACH2$1,395.27$1,903.17$1,854.00$1,868.00$1,300.00$2,500.00
0001-0240Luminaire arm 16' (700SD20-0224)EACH40$1,473.22$2,648.99$2,059.00$2,000.00$1,400.00$2,700.00
0001-0250Control center CCW-1 type C (705SD20-0003)EACH6$7,041.83$12,753$22,900$16,000$12,000$16,650
0001-0260NS luminaire NS luminaire 135 watt L.E.D. arm mount, type III (705SX20-0001)EACH26$1,140.62$715.79$980.00$1,000.00$890.00$1,200.00
0001-0270NS luminaire NS luminaire 135 watt L.E.D. arm mount, type IV (705SX20-0001)EACH12$1,210.22$715.79$1,000.00$1,000.00$890.00$1,200.00
0001-0280NS luminaire NS luminaire 185 watt L.E.D. arm mount, type III (705SX20-0001)EACH4$1,245.02$715.79$1,100.00$1,000.00$1,000.00$1,225.00
VDOT contract C0000115130N01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy