VDOT contract C0000125378N01 bid tabulation
Safety improvements - roadway signage installations. Let by Virginia DOT on October 28, 2026, Culpeper, Staunton. 6 bids received; low bid $677,770 by American Road Markings, L.L.C..
- Owner
- Virginia DOT
- Letting
- 28 OCT 2026
- Pay items
- 13
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Road Markings, L.L.C. | $677,770 | Low |
| 2 | Mullen'S Markings, Inc. | $837,680 | +24% |
| 3 | Ces Consulting, LLC | $1,131,214 | +67% |
| 4 | Richardson-Wayland-Ferreira, LLC | $1,196,876 | +77% |
| 5 | Creative Design Concepts, Inc. | $1,564,956 | +131% |
| 6 | VSL Electrical, Signing, Lighting LLC | $1,810,999 | +167% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Road Markings, L.L.C. | 2. Mullen'S Markings, Inc. | 3. Ces Consulting, LLC | 4. Richardson-Wayland-Ferreira, LLC | 5. Creative Design Concepts, Inc. | 6. VSL Electrical, Signing, Lighting LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | NS install reflective post tape (red) (510SX20-0070) | EACH | 9 | $60.00 | $70.00 | $26.00 | $89.15 | $49.65 | $104.00 |
| 0001-0020 | NS install reflective post tape (yellow) (510SX20-0070) | EACH | 417 | $68.00 | $70.00 | $26.00 | $89.15 | $49.65 | $104.00 |
| 0001-0030 | Maintenance of traffic district wide (512SP20-0002) | LS | 1 | $12,037 | $24,000 | $100,000 | $50,000 | $664,904 | $648,801 |
| 0001-0040 | Mobilization (513SD20-0001) | LS | 1 | $21,780 | $24,000 | $80,000 | $75,000 | $36,600 | $119,900 |
| 0001-0050 | NS contract tree trimming (105SX20-0002) | EACH | 100 | $345.00 | $500.00 | $1,000.00 | $250.00 | $495.15 | $900.00 |
| 0001-0060 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 131 | $225.00 | $150.00 | $150.00 | $146.34 | $305.00 | $230.00 |
| 0001-0070 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 11 | $165.00 | $150.00 | $200.00 | $292.68 | $610.00 | $190.00 |
| 0001-0080 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 3,901 | $18.00 | $20.00 | $35.00 | $20.71 | $15.27 | $40.00 |
| 0001-0090 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 495 | $20.00 | $40.00 | $44.00 | $42.16 | $16.57 | $34.50 |
| 0001-0100 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 259 | $19.00 | $50.00 | $40.00 | $24.81 | $16.57 | $34.00 |
| 0001-0110 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 615 | $473.00 | $610.00 | $650.00 | $928.66 | $772.95 | $774.00 |
| 0001-0120 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 36 | $795.00 | $1,000.00 | $850.00 | $1,656.08 | $890.43 | $935.00 |
| 0001-0130 | Sign panel (701SD20-0001) | SF | 4,385.25 | $33.00 | $38.00 | $50.00 | $56.48 | $38.00 | $42.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of October 28, 2026. Compiled by Mirage Metrics.