VDOT contract C0000125595N01 bid tabulation
Two lane rural roads: sign installation. Let by Virginia DOT on April 22, 2026, Salem. 4 bids received; low bid $1,017,452 by Mullen'S Markings, Inc..
- Owner
- Virginia DOT
- Letting
- 22 APR 2026
- Pay items
- 18
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mullen'S Markings, Inc. | $1,017,452 | Low |
| 2 | Ces Consulting, LLC | $1,514,118 | +49% |
| 3 | Richardson-Wayland-Ferreira, LLC | $1,682,554 | +65% |
| 4 | Creative Design Concepts, Inc. | $2,168,322 | +113% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mullen'S Markings, Inc. | 2. Ces Consulting, LLC | 3. Richardson-Wayland-Ferreira, LLC | 4. Creative Design Concepts, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0002) | ACRE | 3.10 | $17,424 | $5,000.00 | $31,446 | $11,580 |
| 0001-0020 | Truck mounted attenuator (512SD20-0023) | HR | 1,920 | $20.00 | $25.00 | $45.06 | $80.00 |
| 0001-0030 | Group 2 channelizing devices (512SD20-0024) | DAY | 297 | $0.01 | $0.50 | $0.98 | $50.00 |
| 0001-0040 | Electronic arrow board (512SD20-0026) | HR | 1,920 | $0.01 | $3.50 | $9.74 | $20.00 |
| 0001-0050 | Flagger service (512SD20-0027) | HR | 4,762 | $20.00 | $25.00 | $33.60 | $70.00 |
| 0001-0060 | Portable temporary rumble strip array (512SP20-0001) | DAY | 384 | $0.01 | $50.00 | $10.63 | $200.00 |
| 0001-0070 | Mobilization (513SD20-0001) | LS | 1 | $20,000 | $115,000 | $200,000 | $103,253 |
| 0001-0080 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 93 | $150.00 | $200.00 | $271.58 | $625.00 |
| 0001-0090 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 22 | $50.00 | $100.00 | $254.60 | $425.00 |
| 0001-0100 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 6 | $50.00 | $250.00 | $338.20 | $1,089.00 |
| 0001-0110 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 5,999 | $15.00 | $36.00 | $36.08 | $38.00 |
| 0001-0120 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 108 | $35.00 | $50.00 | $46.75 | $42.00 |
| 0001-0130 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 261 | $35.00 | $45.00 | $47.94 | $42.00 |
| 0001-0140 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 28 | $35.00 | $40.00 | $40.35 | $39.00 |
| 0001-0150 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 694 | $545.00 | $680.00 | $699.40 | $980.00 |
| 0001-0160 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 10 | $850.00 | $850.00 | $1,285.40 | $1,209.00 |
| 0001-0170 | Sign panel (701SD20-0001) | SF | 8,658 | $34.00 | $50.00 | $37.10 | $45.00 |
| 0001-0180 | Flexible post delineator, ground mount (702SD20-0012) | EACH | 59 | $160.00 | $350.00 | $474.72 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of April 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.