VDOT contract C0000125658M01 bid tabulation
Install icws. Let by Virginia DOT on February 4, 2026, Appomattox, Lynchburg. 3 bids received; low bid $420,117 by Davis H. Elliot Construction Company, Inc..
- Owner
- Virginia DOT
- Letting
- 04 FEB 2026
- Pay items
- 40
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Davis H. Elliot Construction Company, Inc. | $420,117 | Low |
| 2 | Richardson-Wayland-Ferreira, LLC | $464,051 | +10% |
| 3 | Elite Contracting Group, Inc. | $476,403 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Davis H. Elliot Construction Company, Inc. | 2. Richardson-Wayland-Ferreira, LLC | 3. Elite Contracting Group, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Temp. silt fence type A (303SD20-0034) | LF | 905 | $3.50 | $4.94 | $6.26 |
| 0001-0020 | Utility test pit unpaved (303SX20-0012) | EACH | 9 | $395.77 | $1,482.01 | $419.33 |
| 0001-0030 | Utility test pit asphalt concrete (303SX20-0013) | EACH | 2 | $756.57 | $2,179.97 | $838.50 |
| 0001-0040 | Temporary sign (512SD20-0014) | SF | 180 | $53.54 | $42.86 | $40.74 |
| 0001-0050 | Truck mounted attenuator (512SD20-0023) | HR | 400 | $106.33 | $98.84 | $95.00 |
| 0001-0060 | Group 2 channelizing devices (512SD20-0024) | DAY | 600 | $1.78 | $3.29 | $1.03 |
| 0001-0070 | Port.changeable mess. sign (512SD20-0025) | HR | 400 | $7.95 | $11.70 | $15.70 |
| 0001-0080 | Electronic arrow board (512SD20-0026) | HR | 400 | $6.81 | $8.38 | $8.00 |
| 0001-0090 | Flagger service (512SD20-0027) | HR | 150 | $78.00 | $33.60 | $264.00 |
| 0001-0100 | Portable temporary rumble strip array (512SP20-0001) | DAY | 15 | $78.00 | $8.78 | $675.00 |
| 0001-0110 | NS mobilization site (513SX20-0001) | EACH | 1 | $19,896 | $50,000 | $37,921 |
| 0001-0120 | Topsoil class B (602SD20-0004) | CY | 48 | $795.42 | $112.95 | $147.13 |
| 0001-0130 | Regular seed (603SD20-0003) | LB | 56 | $303.63 | $9.47 | $4.29 |
| 0001-0140 | Overseeding (603SD20-0004) | LB | 44 | $206.13 | $3.01 | $5.45 |
| 0001-0150 | Fertilizer nitrogen - N (603SD20-0014) | LB | 10 | $186.63 | $12.05 | $14.90 |
| 0001-0160 | Fertilizer phosphorous - P (603SD20-0015) | LB | 6 | $173.63 | $12.71 | $24.83 |
| 0001-0170 | Fertilizer potassium - K (603SD20-0016) | LB | 6 | $141.13 | $14.69 | $24.83 |
| 0001-0180 | Lime (603SD20-0017) | TON | 0.42 | $925.42 | $26.55 | $837.00 |
| 0001-0190 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 583 | $76.13 | $6.68 | $8.52 |
| 0001-0200 | Wood pole CL. 4, 40' (700SD20-0084) | EACH | 1 | $2,271.70 | $5,773.61 | $7,294.40 |
| 0001-0210 | 14/4 conductor cable (700SD20-0112) | LF | 1,352 | $5.12 | $9.39 | $9.01 |
| 0001-0220 | Cat 5E direct burial cable (700SD20-0124) | LF | 100 | $8.48 | $17.44 | $28.55 |
| 0001-0230 | Electrical service SE-2, TY. A (700SD20-0130) | EACH | 1 | $2,724.44 | $11,966 | $7,770.00 |
| 0001-0240 | Electrical service work pad (700SD20-0174) | EACH | 1 | $1,012.42 | $1,883.34 | $6,121.00 |
| 0001-0250 | Junction box JB-S2 (700SD20-0178) | EACH | 8 | $2,422.61 | $4,170.63 | $3,838.50 |
| 0001-0260 | Junction box JB-S3 (700SD20-0179) | EACH | 1 | $2,707.95 | $5,567.66 | $6,602.00 |
| 0001-0270 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 5 | $192.11 | $438.68 | $243.80 |
| 0001-0280 | Conduit metal 1-1/2" (700SD20-0186) | LF | 100 | $25.74 | $31.71 | $70.95 |
| 0001-0290 | Bored conduit 3" (700SD20-0192) | LF | 300 | $52.74 | $184.82 | $65.84 |
| 0001-0300 | Conduit PVC 3" (700SD20-0195) | LF | 790 | $8.96 | $28.59 | $12.10 |
| 0001-0310 | Trench excavation eci-1 (700SD20-0197) | LF | 790 | $8.90 | $21.25 | $34.54 |
| 0001-0320 | Test bore (700SD20-0199) | EACH | 1 | $7,877.08 | $5,498.32 | $6,930.00 |
| 0001-0330 | Flashing beacon FB-2 (703SD20-0005) | EACH | 4 | $13,677 | $11,336 | $12,258 |
| 0001-0340 | Flasher (703SD20-0006) | EACH | 4 | $6,178.47 | $6,548.80 | $9,767.00 |
| 0001-0350 | Uninterrupt. PWR supply type 1 (703SD20-0052) | EACH | 1 | $6,211.95 | $8,222.38 | $7,312.00 |
| 0001-0360 | Uninterrupt. PWR supply battery pac (703SD20-0054) | EACH | 1 | $2,364.40 | $5,370.12 | $3,150.00 |
| 0001-0370 | NS detector 360 deg.video camera (TY.III) (703SX20-0003) | EACH | 1 | $4,243.51 | $5,452.43 | $12,115 |
| 0001-0380 | NS detector repeater board assembly (703SX20-0003) | EACH | 1 | $856.01 | $1,502.80 | $1.00 |
| 0001-0390 | NS detector video detection unit type III (703SX20-0003) | EACH | 1 | $26,391 | $30,534 | $32,932 |
| 0001-0400 | ITS controller cabinet pole mounted (801SD20-0002) | EACH | 1 | $10,487 | $17,881 | $19,919 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.